Bernalillo building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Bernalillo, New Mexico.
Verified 2026-07-18 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 829 S. Camino del Pueblo, Bernalillo, NM 87004 (mail: P.O. Box 638, Bernalillo, NM 87004)
- Phone
- (505) 771-7118 (Planning and Zoning); (505) 867-3311 (Town Hall general information); fax (505) 867-0481
- pzdept@tobnm.gov
- Office hours
- Not separately published by the Planning and Zoning Department as of 2026-07-18; the department directs applicants to submit electronically to pzdept@tobnm.gov. General Town Hall information line: (505) 867-3311.
- Website
- Official site
Inspection sequence
Applies to: Commercial Building Permit (CID)
- 1
Foundation Inspection
After excavations for footings are complete and required reinforcing steel is in place.
- 2
Concrete Slab / Under-Floor Inspection
After in-slab or under-floor service equipment is in place, before concrete is placed or floor sheathing installed.
- 3
Frame Inspection
After roof, framing, fire blocking, and bracing are complete and rough electrical, plumbing, and heating are approved.
- 4
Weather-Resistive Barrier Inspection
After installation of the weather-resistive barrier, before it is covered.
- 5
Final Inspection
After finish grading and completion; final electrical, plumbing, and mechanical inspections must be conducted before the final general construction inspection. CID issues the Certificate of Occupancy after approval.
Applies to: Residential Building Permit (CID)
- 1
Foundation Inspection
After excavation for footings is complete and required reinforcing steel is in place, before concrete is placed.
- 2
Concrete Slab / Under-Floor Inspection
After in-slab or under-floor service equipment, conduit, and piping are in place, before concrete is placed or the subfloor is installed.
- 3
Frame Inspection
After roof, framing, fire blocking, and bracing are in place and rough electrical, plumbing, and heating are complete and approved.
- 4
Weather-Resistive Barrier Inspection
After installation of the weather-resistive barrier, before it is covered.
- 5
Final Inspection
After finish grading and completion; final electrical, plumbing, and mechanical inspections must be conducted first. CID issues the Certificate of Occupancy after approving the final inspection.
Applies to: Fire Sprinkler & Fire Alarm Permit (State Fire Marshal's Office)
- 1
Pre-Test
Once fire protection systems are installed per the approved plans, a full pre-test is conducted in accordance with NFPA standards; failures must be corrected and re-tested until the system passes.
- 2
Final Acceptance Test
A State Fire Inspector is dispatched to conduct a Final Acceptance Test at a scheduled date/time; approved/stamped plans, manufacturer specifications, testing documentation, and a representative from each system being tested must be on site.
Applies to: Placement Permit (Manufactured/Mobile Home & Small Structures)
- 1
Placement/Setback Verification
Zoning approval confirms placement meets required setbacks before the permit is finalized; the applicant is responsible for relocating the structure if setbacks are not met.
- 2
Skirting Inspection (manufactured/mobile homes)
Scheduled 30 days from the date of occupancy, per the Placement Permit application.
Applies to: Sign Permit
- 1
Building and Safety Inspection
Conditionally required if the sign uses steel or reinforced footings other than concrete, per the Sign Permit Application's Official Use Only section.
- 2
Electrical Inspection
Required separately through CID if the sign utilizes electricity; the Sign Permit Application refers the applicant to CID for a separate Electrical Permit.
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-18.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bernalillo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Bernalillo building permits
Get alerts for Bernalillo
We'll email you when Bernalillo's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.