Skip to main content
PermitBase

Re-Roof Permit (CID) in Bernalillo, New Mexico

Required for re-roofing work on structures within Town limits, priced and processed as its own line item separate from new construction, but submitted on the same CID Multi-Purpose Building Application (Reroof checkbox) after the same mandatory Town zoning sign-off.

Verified 2026-07-18 · Source

When you need this permit

  • Re-roofing work on a structure greater than 120 square feet within Town limits requires a CID Building Permit prior to construction, per the Town's Planning and Zoning page
  • Town Planning and Zoning zoning/floodplain pre-review and sign-off required before submittal to CID
  • Submit the CID Multi-Purpose Building Application (or Homeowner Permit Application) with the 'Reroof' box checked, to pzdept@tobnm.gov

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Re-Roof Permit (CID)Town of Bernalillo Fee Schedule, updated 7/8/24 — listed as its own fee line, separate from the general Building Permit line, under both RESIDENTIAL and COMMERCIAL DEVELOPMENT sections.
ICC — based on project valuation

Review timeline

Plan review
Not published — contact the department

How long did your Re-Roof Permit (CID) permit actually take in Bernalillo?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Made after the re-roofing work is complete, per CID's general final-inspection requirement.

See the full Bernalillo inspection guide — scheduling & re-inspection fees →

Tips

  • Even though re-roofing has its own fee line on the Town's fee schedule, it still requires the Town's zoning sign-off and full CID Building Permit submittal — it is not a simplified over-the-counter permit.

Frequently asked questions

Yes. Per the Town's Planning and Zoning page, re-roofs require a CID Building Permit prior to construction, with the Town's own zoning sign-off required first. Source: Town of Bernalillo Planning and Zoning page and Fee Schedule.

In Bernalillo, the published Re-Roof Permit (CID) is: ICC — based on project valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Bernalillo does not publish a plan-review timeline for this permit. Contact Town of Bernalillo Planning and Zoning Department at (505) 771-7118 (Planning and Zoning); (505) 867-3311 (Town Hall general information); fax (505) 867-0481 for current turnaround.

You'll need: CID Multi-Purpose Building Application or Homeowner Permit Application. See the required-documents checklist on this page for details on each.

Bernalillo requires 1 inspection(s) for a re-roof permit (cid), in order: Final Inspection. Schedule each through Town of Bernalillo Planning and Zoning Department ((505) 771-7118 (Planning and Zoning); (505) 867-3311 (Town Hall general information); fax (505) 867-0481).

Apply through Town of Bernalillo Planning and Zoning Department at 829 S. Camino del Pueblo, Bernalillo, NM 87004 (mail: P.O. Box 638, Bernalillo, NM 87004). Phone: (505) 771-7118 (Planning and Zoning); (505) 867-3311 (Town Hall general information); fax (505) 867-0481, email: pzdept@tobnm.gov. Office hours: Not separately published by the Planning and Zoning Department as of 2026-07-18; the department directs applicants to submit electronically to pzdept@tobnm.gov. General Town Hall information line: (505) 867-3311.. Official information: https://www.tobnm.gov/departments/planning_zoning/index.php.

Bernalillo, New Mexico has adopted: The Town of Bernalillo does not self-administer building permits — the State of New Mexico Construction Industries Division (CID) issues building permits, trade permits, and all inspections on behalf of the Town, per the Town's own Planning and Zoning page: 'CID issues building permits, trades permits and all inspections on behalf of the Town.' The codes below are the codes CID currently enforces, as published in the 'Building Permit Guide for Commercial Construction' (rev. 5/23/2023) and 'Building Permit Guide for Residential Construction' (rev. 5/23/2023) — both bundled inside the Town's own linked CID application PDFs.; 2021 New Mexico Commercial & Residential Building Code (based on the 2021 IBC / 2021 IRC); 2021 New Mexico Existing Building Code; 2012 New Mexico Uniform Solar Energy Code (IAPMO); 2018 New Mexico Commercial Energy Conservation Code; ICC/ANSI A117.1 Accessibility — the CID Commercial guide cites the 2009 edition; the CID Residential guide cites the 2017 edition. Both editions appear verbatim in CID's own bundled documents as of 2026-07-18 — flagged here as published rather than reconciled.; 2021 New Mexico Uniform Mechanical Code (IAPMO) / 2021 New Mexico Uniform Plumbing Code (IAPMO); 2012 Uniform Swimming Pool, Spa and Hot Tub Code (IAPMO); 2020 New Mexico Electrical Code (based on the 2020 National Electrical Code); 2012 National Electrical Safety Code; 2021 New Mexico Earthen Building Materials Code; 2021 New Mexico Historic Earthen Building Code; Liquefied Petroleum Gas Standards: 2020 NFPA 58, 2021 NFPA 54, 2021 NFPA 52, 2021 NFPA 1192 (Residential guide additionally cites 2012 NFPA 57); Town of Bernalillo Flood Damage Prevention Ordinance (Ordinance No. 247), enforced locally by the Town's Floodplain Manager independent of CID. Local amendments apply — see the Bernalillo overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bernalillo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.