Required for work within the public right-of-way in North Logan, including street excavation, road cuts, boring, and utility trenching. Fees are structured around inspection and surety/cash bond deposits tied to the type and age of the disturbed surface.

Verified 2026-07-08 · Source

When you need this permit

  • Required for any work within the public right-of-way
  • Applies to street excavation, asphalt/concrete penetration, boring, and utility trenching
  • Cash fee or surety bond required, refunded/released after 24 months if the excavation surface is accepted by a city official

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Narrow Trench (<6" wide) Boring Permit FeeNorth Logan Master Fee Schedule, 'Other Construction Related Permits' section, Street Excavation Permits or Encroachment Permits table.
$0.60 per linear foot
Road Cut — No Disturbance of Asphalt / Road >3 yearsNorth Logan Master Fee Schedule, 'Other Construction Related Permits' section.
$1,000.00 non-refundable fee plus $500.00 deposit; if disturbed area exceeds 300 sq ft, $3.50 per sq ft of asphalt disturbed
New Road Cut Permit Fee (<3 years)North Logan Master Fee Schedule, 'Other Construction Related Permits' section.
$5,000.00 non-refundable fee plus $500.00 deposit; if disturbed area exceeds 300 sq ft, $16.50 per sq ft of asphalt disturbed
Asphalt or Concrete Surface PenetrationNorth Logan Master Fee Schedule, 'Other Construction Related Permits' section.
$25.00 non-refundable inspection fee plus cash fee or surety bond of $200.00 or $3.00 per sq ft, whichever is greater
Pothole FeeNorth Logan Master Fee Schedule, 'Other Construction Related Permits' section.
$250 per pothole, non-refundable fee
Sidewalk, Street, Driveway, and Building Material on Street PermitsNorth Logan Master Fee Schedule, 'Other Construction Related Permits' section.
No fee, but applicant must pay any costs incurred by the city

Review timeline

Plan review
Not published — contact the department

How long did your Encroachment Permit permit actually take in North Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Excavation Surface Acceptance Inspection

    City official inspects the excavation's finished surface; cash fee is refunded or surety bond released after 24 months if accepted, per the Master Fee Schedule.

See the full North Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Fees vary significantly based on whether the disturbed road is newer than 3 years old (New Road Cut, $5,000 non-refundable + $16.50/sq ft) versus older than 3 years (Road Cut, $1,000 non-refundable + $3.50/sq ft) — verify the age of the road surface before budgeting.
  • 3rd Party Inspection Fees and construction monitoring apply on large projects where city staff cannot keep pace with the installation schedule, billed at actual costs incurred by the city.

Frequently asked questions

North Logan requires an encroachment permit for: Required for any work within the public right-of-way; Applies to street excavation, asphalt/concrete penetration, boring, and utility trenching; Cash fee or surety bond required, refunded/released after 24 months if the excavation surface is accepted by a city official. If your project isn't listed, confirm with North Logan City Building Department at (435) 752-1310 before starting work.

It depends on the type of work. A narrow trench boring permit is $0.60 per linear foot. A road cut on a road older than 3 years is a $1,000 non-refundable fee plus a $500 deposit (plus $3.50/sq ft if disturbance exceeds 300 sq ft). A new road cut (road under 3 years old) is $5,000 non-refundable plus a $500 deposit (plus $16.50/sq ft if disturbance exceeds 300 sq ft), per North Logan's Master Fee Schedule.

North Logan does not publish a plan-review timeline for this permit. Contact North Logan City Building Department at (435) 752-1310 for current turnaround.

You'll need: Encroachment Permit Application (CivicReview). See the required-documents checklist on this page for details on each.

North Logan requires 1 inspection(s) for an encroachment permit, in order: Excavation Surface Acceptance Inspection. Schedule each through North Logan City Building Department ((435) 752-1310).

Apply through North Logan City Building Department at 2525 North 600 East, North Logan, UT 84341. Phone: (435) 752-1310, email: Mary@northlogancity.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.northlogancity.gov/building.

North Logan, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — North Logan Municipal Code § 9-401 adopts 'the building codes, adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(a), the 2024 IBC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here. Because NLMC § 9-401 is a blanket cross-reference to the state's adopted edition rather than a hardcoded year, North Logan's local ordinance tracks the statute automatically — no city ordinance amendment was needed for this transition. North Logan's own Building Codes & Design Criteria page links directly to the State Adopted Codes list rather than publishing a separate local list, and states 'there are no local amendments for North Logan' (live-checked 2026-07-16, unchanged).; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Adopted per NLMC § 9-401's blanket adoption of state-adopted building codes.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in NLMC Title 9, added here per statute.; 2024 International Plumbing Code (IPC) — NLMC § 9-600/§ 9-701 adopts 'the Uniform Plumbing Code, currently adopted by State of Utah'; per Utah Code § 15A-2-103(1)(d), the 2024 IPC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here (blanket cross-reference tracks the statute automatically).; 2024 International Mechanical Code (IMC) — NLMC § 9-705 adopts the mechanical code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(e), the 2024 IMC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — NLMC § 9-702 adopts the fuel gas code 'as adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(f), the 2024 IFGC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — NLMC § 9-707 adopts the energy conservation code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(h), the 2024 IECC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; NLMC § 9-500/§ 9-501 adopts 'the electrical code, adopted by the State of Utah'; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it (covered generally by NLMC § 9-401's blanket building-code adoption).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. North Logan's Building Codes & Design Criteria page (northlogancity.gov/building) was live-checked 2026-07-16: it still links generically to the state's 'State Adopted Codes' list rather than itemizing edition years itself, and still states 'there are no local amendments for North Logan' — no page-vs-statute lag was found because the page (like NLMC Title 9's own text) defers entirely to the state's current list rather than asserting specific years.. Local amendments apply — see the North Logan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.