Required for installation of a residential or commercial photovoltaic (solar) system in North Logan. Unlike a standard standalone electrical permit, PV installations follow their own documented submittal process — a dedicated Permit Application, plans emailed directly to the Building Department, and a PV System Plan Check Worksheet used to verify NEC code compliance. The underlying permit fee itself is the same valuation-based Building Permit Fee plus the 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee documented in this file's electrical-mechanical-plumbing-permit entry — North Logan does not publish a separate dollar-amount solar fee tier — but the application path, required worksheet, and a $50 non-refundable deposit are solar-specific and distinct from other trade permits.

Verified 2026-07-20 · Source

When you need this permit

  • Permit Application identifying the primary contractor and any subcontractors, including contractor license numbers Contractor
  • Plans submitted electronically in PDF format, emailed to plans@northlogancity.org (per the city's dedicated PV permit process page, archived 2024-02-28; a stamped copy is returned by email once approved)
  • Structural plans required if the installation involves modification of a building or construction of any supporting structure for the PV system
  • PV System Plan Check Worksheet completed and submitted with the plans — covers site diagram, one-line diagram, array configuration, equipment/system grounding, disconnect and point-of-connection details, inverter listing/utility-interactivity status, PV module listing and Pmax voltage/current, ground-fault and DC arc-fault protection (NEC 690.7/690.8/690.11), and for roof-mounted arrays, structural calculations and roof-attachment details, or for ground-mounted arrays, foundation/footing and mounting-structure details
  • $50.00 non-refundable deposit due at submittal of the permit application and documents, applied toward the final calculated fees

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

PV System Application DepositNorth Logan City 'Permit Process for Photovoltaic (PV) Systems' page: 'A $50.00 deposit will be required when the permit application and documents are submitted. This deposit is nonrefundable, but will be applied toward the fees calculated during permit finalization.' Sourced from a Wayback Machine archive dated 2024-02-28 (web.archive.org/web/20240228111527/https://northlogancity.org/permit-process-for-photovoltaic-pv-sytems/); the live page at this URL returns HTTP 404 as of 2026-07-19 re-check on the city's current React-based website, but the city's live Building Department page (northlogancity.gov/building, checked 2026-07-19) still lists a 'PV System Plan Check Worksheet' as a current Forms & Resources item, corroborating that PV permitting remains an active, distinct process. Re-chased 2026-07-20: independently corroborated via the CURRENT LIVE North Logan Master Fee Schedule (northlogan.municipalcodeonline.com/book?type=fees#name=Building_Permit_Fees, most recently amended by Res. 25-02 on 2/19/2025, rendered and read directly since it is a JS-rendered page a prior pass could not access) -- the schedule's 'Building Permit Fee' down-payment table lists 'All other permits: $50' (and 'Single family home: $50'), matching this figure exactly under the general down-payment category a solar/PV retrofit permit would fall into. This is now a live, current, independently-corroborating source for the $50 figure, not solely an archived one.
$50.00 (non-refundable, applied toward final fees)
Building Permit Fee + Combined Electrical, Mechanical, Plumbing Permit FeePer the archived PV permit process page: 'The fees will include a building permit fee and impact fees. The amount of these fees will be calculated as part of the permit finalization process' — payment is due when the finalized permit is picked up, accepted only by check or cash. No PV-specific dollar-figure fee table is separately published; the underlying valuation-based Building Permit Fee (NLMC § 9-205) and 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee (North Logan Master Fee Schedule) are the applicable fees. Re-chased 2026-07-20: re-fetched the live current Master Fee Schedule directly (rendered via browser since the site is a JS-rendered civiclinq-style book) and confirmed verbatim: 'Building Permit Fee*** As established in the 1997 Uniform Building Code adjusted annually by the CPI' and 'Combined Electrical, Mechanical, Plumbing Permit Fee: 27.5% of the Building Permit Fee' (both under the still-current 'Building Permit Fees' section, most recently amended 2/19/2025). Also ran a full-text search of the entire fee schedule for 'solar' -- zero results -- and read the adjacent 'Other Construction Related Permits' section in full (sidewalk/driveway/excavation/right-of-way permits only) -- confirming no dedicated PV/solar fee line exists anywhere in the current schedule. The general valuation-based mechanism is therefore confirmed as the governing fee structure, not an unverified inference.
Building Permit Fee per 1997 UBC Table No. 3-A (adjusted annually by CPI) plus 27.5% of that fee for the combined electrical/mechanical/plumbing scope

Review timeline

Plan reviewTypical estimate — confirm current times with the North Logan building department
~10–10 business days

How long did your Photovoltaic (PV) System Permit permit actually take in North Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring, conduit, disconnects, and grounding verified before enclosure or energizing, consistent with the combined trade inspection process documented elsewhere in this file.

  2. 2

    Final / Structural (roof or ground mount)

    Module mounting, racking/foundation attachment, and completed electrical connections verified; structural inspection applies where roof or ground-mount structural work was part of the scope.

See the full North Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Email PV plans directly to plans@northlogancity.org in PDF format — this is a distinct submittal channel from the standard CityInspect portal used for other building permits.
  • The $50 deposit is non-refundable but is credited toward your final permit fee — budget for the balance due when picking up the finalized, stamped permit.
  • North Logan only accepts check or cash for building department payments, including PV permit fees — credit cards are not accepted.
  • Keep the stamped, approved copy of your plans on site (physical or electronic) for reference during construction and inspections.
  • If your PV installation requires modification of the building or a new supporting structure, budget extra time and cost for structural engineering plans.

Frequently asked questions

North Logan requires a photovoltaic (pv) system permit for: Permit Application identifying the primary contractor and any subcontractors, including contractor license numbers; Plans submitted electronically in PDF format, emailed to plans@northlogancity.org (per the city's dedicated PV permit process page, archived 2024-02-28; a stamped copy is returned by email once approved); Structural plans required if the installation involves modification of a building or construction of any supporting structure for the PV system; PV System Plan Check Worksheet completed and submitted with the plans — covers site diagram, one-line diagram, array configuration, equipment/system grounding, disconnect and point-of-connection details, inverter listing/utility-interactivity status, PV module listing and Pmax voltage/current, ground-fault and DC arc-fault protection (NEC 690.7/690.8/690.11), and for roof-mounted arrays, structural calculations and roof-attachment details, or for ground-mounted arrays, foundation/footing and mounting-structure details; $50.00 non-refundable deposit due at submittal of the permit application and documents, applied toward the final calculated fees. If your project isn't listed, confirm with North Logan City Building Department at (435) 752-1310 before starting work.

In North Logan, the published PV System Application Deposit is: $50.00 (non-refundable, applied toward final fees). Additional published fees: Building Permit Fee + Combined Electrical, Mechanical, Plumbing Permit Fee — Building Permit Fee per 1997 UBC Table No. 3-A (adjusted annually by CPI) plus 27.5% of that fee for the combined electrical/mechanical/plumbing scope. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

North Logan's stated goal (per the city's PV permit process page) is to review plans and issue a permit within 10 working days of receiving all necessary documents, though this is a goal rather than a guaranteed timeline and can be extended by a busy schedule or missing documents.

You'll need: Permit Application; PV System Plan Check Worksheet. Depending on your project, North Logan may also ask for: Structural Plans. See the required-documents checklist on this page for details on each.

North Logan requires 2 inspection(s) for a photovoltaic (pv) system permit, in order: Rough Electrical, Final / Structural (roof or ground mount). Schedule each through North Logan City Building Department ((435) 752-1310).

Apply through North Logan City Building Department at 2525 North 600 East, North Logan, UT 84341. Phone: (435) 752-1310, email: Mary@northlogancity.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.northlogancity.gov/building.

North Logan, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — North Logan Municipal Code § 9-401 adopts 'the building codes, adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(a), the 2024 IBC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here. Because NLMC § 9-401 is a blanket cross-reference to the state's adopted edition rather than a hardcoded year, North Logan's local ordinance tracks the statute automatically — no city ordinance amendment was needed for this transition. North Logan's own Building Codes & Design Criteria page links directly to the State Adopted Codes list rather than publishing a separate local list, and states 'there are no local amendments for North Logan' (live-checked 2026-07-16, unchanged).; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Adopted per NLMC § 9-401's blanket adoption of state-adopted building codes.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in NLMC Title 9, added here per statute.; 2024 International Plumbing Code (IPC) — NLMC § 9-600/§ 9-701 adopts 'the Uniform Plumbing Code, currently adopted by State of Utah'; per Utah Code § 15A-2-103(1)(d), the 2024 IPC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here (blanket cross-reference tracks the statute automatically).; 2024 International Mechanical Code (IMC) — NLMC § 9-705 adopts the mechanical code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(e), the 2024 IMC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — NLMC § 9-702 adopts the fuel gas code 'as adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(f), the 2024 IFGC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — NLMC § 9-707 adopts the energy conservation code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(h), the 2024 IECC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; NLMC § 9-500/§ 9-501 adopts 'the electrical code, adopted by the State of Utah'; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it (covered generally by NLMC § 9-401's blanket building-code adoption).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. North Logan's Building Codes & Design Criteria page (northlogancity.gov/building) was live-checked 2026-07-16: it still links generically to the state's 'State Adopted Codes' list rather than itemizing edition years itself, and still states 'there are no local amendments for North Logan' — no page-vs-statute lag was found because the page (like NLMC Title 9's own text) defers entirely to the state's current list rather than asserting specific years.. Local amendments apply — see the North Logan overview page for the full list.

Yes. While the underlying permit fee is the same valuation-based Building Permit Fee plus the 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee used for other trade work, North Logan documents a distinct PV-specific submittal process: plans are emailed directly to plans@northlogancity.org, a PV System Plan Check Worksheet must be completed to verify NEC code compliance, and a $50 non-refundable deposit is due at submittal.