Photovoltaic (PV) System Permit in North Logan, Utah

Required for installation of a residential or commercial photovoltaic (solar) system in North Logan. Unlike a standard standalone electrical permit, PV installations follow their own documented submittal process — a dedicated Permit Application, plans emailed directly to the Building Department, and a PV System Plan Check Worksheet used to verify NEC code compliance. The underlying permit fee itself is the same valuation-based Building Permit Fee plus the 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee documented in the electrical-mechanical-plumbing-permit entry — North Logan does not publish a separate dollar-amount solar fee tier — but the application path, required worksheet, and a $50 non-refundable deposit are solar-specific and distinct from other trade permits.

Verified 2026-07-20 · Source

When you need this permit

  • Permit Application identifying the primary contractor and any subcontractors, including contractor license numbers Contractor
  • Plans submitted electronically in PDF format, emailed to plans@northlogancity.org (per the city's dedicated PV permit process page, archived 2024-02-28; a stamped copy is returned by email once approved)
  • Structural plans required if the installation involves modification of a building or construction of any supporting structure for the PV system
  • PV System Plan Check Worksheet completed and submitted with the plans — covers site diagram, one-line diagram, array configuration, equipment/system grounding, disconnect and point-of-connection details, inverter listing/utility-interactivity status, PV module listing and Pmax voltage/current, ground-fault and DC arc-fault protection (NEC 690.7/690.8/690.11), and for roof-mounted arrays, structural calculations and roof-attachment details, or for ground-mounted arrays, foundation/footing and mounting-structure details
  • $50.00 non-refundable deposit due at submittal of the permit application and documents, applied toward the final calculated fees

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

PV System Application Deposit
North Logan City 'Permit Process for Photovoltaic (PV) Systems' page: 'A $50.00 deposit will be required when the permit application and documents are submitted. Show full citationNorth Logan City 'Permit Process for Photovoltaic (PV) Systems' page: 'A $50.00 deposit will be required when the permit application and documents are submitted. This deposit is nonrefundable, but will be applied toward the fees calculated during permit finalization.' Sourced from a Wayback Machine archive dated 2024-02-28 (web.archive.org/web/20240228111527/https://northlogancity.org/permit-process-for-photovoltaic-pv-sytems/); the page at this URL is no longer live on the city's current website, but the city's live Building Department page (northlogancity.gov/building) still lists a 'PV System Plan Check Worksheet' as a current Forms & Resources item, and PV permitting remains an active, distinct process. The current North Logan Master Fee Schedule (northlogan.municipalcodeonline.com/book?type=fees#name=Building_Permit_Fees, most recently amended by Res. 25-02 on 2/19/2025) corroborates the figure: its 'Building Permit Fee' down-payment table lists 'All other permits: $50' (and 'Single family home: $50'), the general down-payment category a solar/PV retrofit permit falls into.
$50.00 (non-refundable, applied toward final fees)
Building Permit Fee + Combined Electrical, Mechanical, Plumbing Permit Fee
Per the archived PV permit process page: 'The fees will include a building permit fee and impact fees. Show full citationPer the archived PV permit process page: 'The fees will include a building permit fee and impact fees. The amount of these fees will be calculated as part of the permit finalization process' — payment is due when the finalized permit is picked up, accepted only by check or cash. No PV-specific dollar-figure fee table is separately published; the underlying valuation-based Building Permit Fee (NLMC § 9-205) and 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee (North Logan Master Fee Schedule) are the applicable fees. The current Master Fee Schedule states verbatim: 'Building Permit Fee*** As established in the 1997 Uniform Building Code adjusted annually by the CPI' and 'Combined Electrical, Mechanical, Plumbing Permit Fee: 27.5% of the Building Permit Fee' (both under the 'Building Permit Fees' section, most recently amended 2/19/2025). The schedule contains no dedicated PV/solar fee line ('solar' does not appear anywhere in it), and its adjacent 'Other Construction Related Permits' section covers sidewalk/driveway/excavation/right-of-way permits only. The general valuation-based mechanism is the governing fee structure.
Building Permit Fee per 1997 UBC Table No. 3-A (adjusted annually by CPI) plus 27.5% of that fee for the combined electrical/mechanical/plumbing scope

Review timeline

Plan reviewTypical estimate — confirm current times with the North Logan building department
~10–10 business days

How long did your Photovoltaic (PV) System Permit permit actually take in North Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring, conduit, disconnects, and grounding verified before enclosure or energizing, consistent with the combined trade inspection process documented elsewhere in this record.

  2. 2

    Final / Structural (roof or ground mount)

    Module mounting, racking/foundation attachment, and completed electrical connections verified; structural inspection applies where roof or ground-mount structural work was part of the scope.

See the full North Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Email PV plans directly to plans@northlogancity.org in PDF format — this is a distinct submittal channel from the standard CityInspect portal used for other building permits.
  • The $50 deposit is non-refundable but is credited toward your final permit fee — budget for the balance due when picking up the finalized, stamped permit.
  • North Logan only accepts check or cash for building department payments, including PV permit fees — credit cards are not accepted.
  • Keep the stamped, approved copy of your plans on site (physical or electronic) for reference during construction and inspections.
  • If your PV installation requires modification of the building or a new supporting structure, budget extra time and cost for structural engineering plans.

Frequently asked questions

North Logan requires a photovoltaic (pv) system permit for: Permit Application identifying the primary contractor and any subcontractors, including contractor license numbers; Plans submitted electronically in PDF format, emailed to plans@northlogancity.org (per the city's dedicated PV permit process page, archived 2024-02-28; a stamped copy is returned by email once approved); Structural plans required if the installation involves modification of a building or construction of any supporting structure for the PV system; PV System Plan Check Worksheet completed and submitted with the plans — covers site diagram, one-line diagram, array configuration, equipment/system grounding, disconnect and point-of-connection details, inverter listing/utility-interactivity status, PV module listing and Pmax voltage/current, ground-fault and DC arc-fault protection (NEC 690.7/690.8/690.11), and for roof-mounted arrays, structural calculations and roof-attachment details, or for ground-mounted arrays, foundation/footing and mounting-structure details; $50.00 non-refundable deposit due at submittal of the permit application and documents, applied toward the final calculated fees. If your project isn't listed, confirm with North Logan City Building Department at (435) 752-1310 before starting work.

In North Logan, the published PV System Application Deposit is: $50.00 (non-refundable, applied toward final fees). Additional published fees: Building Permit Fee + Combined Electrical, Mechanical, Plumbing Permit Fee — Building Permit Fee per 1997 UBC Table No. 3-A (adjusted annually by CPI) plus 27.5% of that fee for the combined electrical/mechanical/plumbing scope. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

North Logan's stated goal (per the city's PV permit process page) is to review plans and issue a permit within 10 working days of receiving all necessary documents, though this is a goal rather than a guaranteed timeline and can be extended by a busy schedule or missing documents.

You'll need: Permit Application; PV System Plan Check Worksheet. Depending on your project, North Logan may also ask for: Structural Plans. See the required-documents checklist on this page for details on each.

North Logan requires 2 inspection(s) for a photovoltaic (pv) system permit, in order: Rough Electrical, Final / Structural (roof or ground mount). Schedule each through North Logan City Building Department ((435) 752-1310).

Apply through North Logan City Building Department at 2525 North 600 East, North Logan, UT 84341. Phone: (435) 752-1310, email: Mary@northlogancity.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.northlogancity.gov/building.

North Logan, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — North Logan Municipal Code § 9-401 adopts 'the building codes, adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(a), the 2024 IBC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition. Because NLMC § 9-401 is a blanket cross-reference to the state's adopted edition rather than a hardcoded year, North Logan's local ordinance tracks the statute automatically — no city ordinance amendment was needed for this transition. North Logan's own Building Codes & Design Criteria page links directly to the State Adopted Codes list rather than publishing a separate local list, and states 'there are no local amendments for North Logan.'; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Adopted per NLMC § 9-401's blanket adoption of state-adopted building codes.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in NLMC Title 9, added here per statute.; 2024 International Plumbing Code (IPC) — NLMC § 9-600/§ 9-701 adopts 'the Uniform Plumbing Code, currently adopted by State of Utah'; per Utah Code § 15A-2-103(1)(d), the 2024 IPC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition (the blanket cross-reference tracks the statute automatically).; 2024 International Mechanical Code (IMC) — NLMC § 9-705 adopts the mechanical code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(e), the 2024 IMC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition.; 2024 International Fuel Gas Code (IFGC) — NLMC § 9-702 adopts the fuel gas code 'as adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(f), the 2024 IFGC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — NLMC § 9-707 adopts the energy conservation code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(h), the 2024 IECC is current statewide as of 7/1/2026, superseding the 2021 edition.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; NLMC § 9-500/§ 9-501 adopts 'the electrical code, adopted by the State of Utah'; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it (covered generally by NLMC § 9-401's blanket building-code adoption).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it.; NOTE: Under Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are 2024 statewide; IRC (2021) and NEC (2023) did NOT change. North Logan's Building Codes & Design Criteria page (northlogancity.gov/building) links generically to the state's 'State Adopted Codes' list rather than itemizing edition years itself, and states 'there are no local amendments for North Logan' — the page (like NLMC Title 9's own text) defers entirely to the state's current list rather than asserting specific years.. Local amendments apply — see the North Logan overview page for the full list.

Yes. While the underlying permit fee is the same valuation-based Building Permit Fee plus the 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee used for other trade work, North Logan documents a distinct PV-specific submittal process: plans are emailed directly to plans@northlogancity.org, a PV System Plan Check Worksheet must be completed to verify NEC code compliance, and a $50 non-refundable deposit is due at submittal.

North Logan's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for North Logan yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when North Logan lands. Privacy.