Sign Permit in North Logan, Utah

Required in North Logan City to erect, construct, or alter any sign, per the same Zoning Clearance-then-Building Permit process used for other structures. North Logan's official Master Fee Schedule publishes a distinct 'Signs And Sign Permit Fees' category separate from the valuation-based Building Permit Fee: a flat $75.00 Sign Permit fee, plus a Sign Construction Inspection Fee that follows the Building Permit Fee schedule.

Verified 2026-07-20 · Source

When you need this permit

  • A Zoning Clearance (Step 1) must be obtained first via the CivicReview portal before a Sign Permit/Building Permit application can be submitted — North Logan Municipal Code lists signs among the structure types requiring Zoning Clearance, alongside primary structures, accessory structures, agricultural structures, fences, pools, and retaining walls over 3 feet in height
  • Written application accompanied by 2 sets of plans and specifications stating the specific nature of construction, per NLMC § 9-203 (the same general building-permit submittal requirement applied citywide)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign PermitNorth Logan City Master Fee Schedule, 'Signs And Sign Permit Fees' section: 'Sign Permit $75.00 plus any costs incurred by the city that exceed this amount.'
$75.00 plus any costs incurred by the city that exceed this amount
Sign Construction Inspection FeeNorth Logan City Master Fee Schedule: 'Sign Construction Inspection Fee — Construction Inspection Fee shall follow the Building Permit Fee, as stated above.'
Same as Building Permit Fee (valuation-based, per 1997 UBC Table No. 3-A, adjusted annually by CPI)

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in North Logan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Construction Inspection

    A construction inspection fee (following the Building Permit Fee schedule) is charged for sign construction, per the North Logan Master Fee Schedule.

See the full North Logan inspection guide — scheduling & re-inspection fees →

Tips

  • Signs require the same Zoning Clearance (Step 1) as other structures before a permit application can proceed — budget time for that step ahead of the sign permit itself.
  • The $75.00 flat Sign Permit fee is separate from the Sign Construction Inspection Fee, which instead follows the valuation-based Building Permit Fee schedule — confirm both cost components with the Building Department before budgeting.

Frequently asked questions

North Logan requires a sign permit for: A Zoning Clearance (Step 1) must be obtained first via the CivicReview portal before a Sign Permit/Building Permit application can be submitted — North Logan Municipal Code lists signs among the structure types requiring Zoning Clearance, alongside primary structures, accessory structures, agricultural structures, fences, pools, and retaining walls over 3 feet in height; Written application accompanied by 2 sets of plans and specifications stating the specific nature of construction, per NLMC § 9-203 (the same general building-permit submittal requirement applied citywide). If your project isn't listed, confirm with North Logan City Building Department at (435) 752-1310 before starting work.

North Logan City's Master Fee Schedule lists a flat $75.00 Sign Permit fee (plus any costs incurred by the city that exceed this amount), plus a separate Sign Construction Inspection Fee that follows the same valuation-based schedule as the Building Permit Fee.

North Logan does not publish a plan-review timeline for this permit. Contact North Logan City Building Department at (435) 752-1310 for current turnaround.

You'll need: Zoning Clearance Application (CivicReview portal); Plans and Specifications (2 sets). See the required-documents checklist on this page for details on each.

North Logan requires 1 inspection(s) for a sign permit, in order: Sign Construction Inspection. Schedule each through North Logan City Building Department ((435) 752-1310).

Apply through North Logan City Building Department at 2525 North 600 East, North Logan, UT 84341. Phone: (435) 752-1310, email: Mary@northlogancity.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.northlogancity.gov/building.

North Logan, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — North Logan Municipal Code § 9-401 adopts 'the building codes, adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(a), the 2024 IBC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here. Because NLMC § 9-401 is a blanket cross-reference to the state's adopted edition rather than a hardcoded year, North Logan's local ordinance tracks the statute automatically — no city ordinance amendment was needed for this transition. North Logan's own Building Codes & Design Criteria page links directly to the State Adopted Codes list rather than publishing a separate local list, and states 'there are no local amendments for North Logan' (live-checked 2026-07-16, unchanged).; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Adopted per NLMC § 9-401's blanket adoption of state-adopted building codes.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in NLMC Title 9, added here per statute.; 2024 International Plumbing Code (IPC) — NLMC § 9-600/§ 9-701 adopts 'the Uniform Plumbing Code, currently adopted by State of Utah'; per Utah Code § 15A-2-103(1)(d), the 2024 IPC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here (blanket cross-reference tracks the statute automatically).; 2024 International Mechanical Code (IMC) — NLMC § 9-705 adopts the mechanical code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(e), the 2024 IMC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — NLMC § 9-702 adopts the fuel gas code 'as adopted by the State of Utah'; per Utah Code § 15A-2-103(1)(f), the 2024 IFGC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — NLMC § 9-707 adopts the energy conservation code 'as adopted by State of Utah'; per Utah Code § 15A-2-103(1)(h), the 2024 IECC is CURRENT statewide as of 7/1/2026, superseding the 2021 edition previously listed here.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; NLMC § 9-500/§ 9-501 adopts 'the electrical code, adopted by the State of Utah'; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it (covered generally by NLMC § 9-401's blanket building-code adoption).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized as its own section in NLMC Title 9, added here per statute since North Logan's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. North Logan's Building Codes & Design Criteria page (northlogancity.gov/building) was live-checked 2026-07-16: it still links generically to the state's 'State Adopted Codes' list rather than itemizing edition years itself, and still states 'there are no local amendments for North Logan' — no page-vs-statute lag was found because the page (like NLMC Title 9's own text) defers entirely to the state's current list rather than asserting specific years.. Local amendments apply — see the North Logan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.