Unincorporated Cache County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Cache County, Utah.
Verified 2026-07-17 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 179 N Main St, Suite 305, Logan, UT 84321
- Phone
- (435) 755-1650
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM (permit pickup/payment ends at 4:45 PM)
- Website
- Official site
Published scheduling rules
- Inspections must be requested at least 24 hours in advance, with a 3:30 PM cutoff the prior business day. Calling 2–3 days in advance is recommended. (Residential Building Permit)
Inspection sequence
Applies to: Commercial Building Permit
- 1
Footings
After trenches are excavated, forms erected, and steel is in place and tied — before concrete pour. Same requirement published on Cache County's general Building Inspections page (no separate commercial-specific inspection list is published by the county).
- 2
Foundation
After forms are erected and steel is in place and tied
- 3
Underground Plumbing / Utilities
Before floor slab pour and after pressure testing of underground plumbing
- 4
Rough-In (Framing, Plumbing, Mechanical, Electrical)
After roof, framing members, and fire blocking are in place and all pipes, vents, ducts, and wiring are installed, before any of it is covered
- 5
Final
After the building is completed and prior to occupancy
Applies to: Accessory Dwelling Unit (ADU)
- 1
Foundation
Footings, forms, rebar — before concrete pour
- 2
Framing
Structure, fire separation, egress windows
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Final
All work complete, smoke/CO detectors, address posted
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts. Concrete inspections: notify staff when concrete truck is scheduled so inspector can arrive before truck.
- 2
Framing / 4-Way
After framing, sheathing, and rough-in MEP — before insulation or wall cover. Windows and flashing must be installed for the 4-way inspection.
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy. Do a final walk-through before scheduling — inspectors may assess $75 re-inspection fee if not ready.
Applies to: Swimming Pool Permit
- 1
Excavation / Steel
Pool shell excavation, rebar, and plumbing before gunite/shotcrete
- 2
Electrical / Bonding
Pool bonding grid, equipment connections, GFCI protection per NEC Article 680
- 3
Barrier
Pool fence/barrier — 48-inch minimum height, self-closing/self-latching gates per adopted IRC
- 4
Final
Pool complete, filled, equipment operational, all barriers in place
Applies to: Basement Finish Permit
- 1
Framing
Wall framing, fire blocking, egress window openings
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed
- 3
Final
Drywall, fixtures, smoke/CO detectors, and all finishes complete. NOTE: physical on-site inspection only if there is an outside entrance and owner/contractor is present.
Applies to: Deck Permit
- 1
Footings
Verify footing depth (30 inches below grade for frost protection in Cache Valley), diameter, and rebar before concrete pour
- 2
Framing
Posts, beams, joists, ledger connection, and hardware verified
- 3
Final
Decking, stairs, guards, and railings complete
Applies to: Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
Applies to: Plumbing Permit
- 1
Underground / Slab
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed, before walls closed — pressure test required
- 3
Final
All fixtures connected, water flowing, no leaks, proper venting verified
Applies to: Retaining Wall Permit
- 1
Footing
Footing excavation, rebar, and forms before concrete pour
- 2
Backfill / Drainage
Drainage gravel, pipe, and filter fabric before backfill
- 3
Final
Wall complete, drainage functional, site graded
Applies to: Zoning Clearance
- 1
Completeness Review
Development Services staff reviews the submitted application against the checklist with the applicant; incomplete applications are not accepted and are returned to the applicant, per the application form.
- 2
Department Review
Complete applications are forwarded to the necessary departments for review and comments, per the application form.
- 3
Land Use Authority Approval
Department reviews and comments are used to prepare the zoning clearance approval, which is presented to the county land use authority for approval, per the application form.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough-In (Framing, Plumbing, Mechanical, Electrical)
After framing and rough-in mechanical, electrical, and plumbing work for the tenant space are installed, before walls are closed. Based on Cache County's general published inspection sequence (no separate tenant-improvement-specific inspection list is published by the county).
- 2
Final
After the tenant space is completed and prior to occupancy
Applies to: Demolition Permit
- 1
Pre-Demolition
Verify utility disconnects and any required asbestos clearance before work begins
- 2
Final / Site Clear
Site cleared, foundation removed or capped
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
Applies to: Roofing Permit
- 1
Deck / Substrate
After tear-off — verify sheathing condition and replace damaged decking before proceeding
- 2
Final
Completed roof — verify ice and water shield, flashing, drip edge, and nailing pattern
Applies to: Solar Panel Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Cache County building permits
Get alerts for Unincorporated Cache County
We'll email you when Unincorporated Cache County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.