Mechanical / HVAC Permit — Unincorporated Cache County, Utah · Requirements sheet
Verified 2026-07-17 · Source: https://www.cachecounty.gov/assets/department/devserv/Building%20fees%20adopted%202024.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Unincorporated Cache County, Utah
Required for furnace/AC replacement and gas line/meter upgrades in unincorporated Cache County. The county FAQ indicates simple furnace replacements may use a utility permit — call to confirm. Governed by the 2024 International Mechanical Code (IMC) / 2024 International Fuel Gas Code (IFGC) as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (2021 editions governed through June 30, 2026).
Verified 2026-07-17 · Source
When you need this permit
- Furnace or AC replacement (residential)
- Gas line or meter upgrade
- New HVAC system installation
- Ductwork installation or major modification
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
See the full Unincorporated Cache County inspection guide — scheduling & re-inspection fees →
Tips
- Cache County's FAQ states: 'If you're just replacing a furnace or an electrical panel, contact our office for a utility permit.' Call (435) 755-1650 press 1 to confirm the exact permit type for your project.
- A Manual J&D form from your mechanical contractor is required when replacing a furnace in a remodel project.
- Unincorporated Cache County follows the 2024 IMC/IFGC, in effect since July 1, 2026 (2021 editions governed through June 30, 2026).
- High-efficiency furnaces require condensate drain lines — plan routing before installation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Cache County
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Cache County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Cache County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →