Electrical Permit in Unincorporated Cache County, Utah
Required for electrical meter upgrades, new service, generator installations, and other electrical work in unincorporated Cache County. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Note: the County's Building Code Information page shows '2020 NEC' but the statewide 2023 NEC is legally in force. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the county's Building Division Fee Schedule does not publish an EV-specific line item.
Verified 2026-07-17 · Source
When you need this permit
- Electrical meter or service upgrade
- Generator installation
- Generlink transfer switch installation
- New circuits, panel upgrades, rewiring (contact building office to confirm if utility permit applies)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
See the full Unincorporated Cache County inspection guide — scheduling & re-inspection fees →
Tips
- All electrical work in unincorporated Cache County must comply with the 2023 National Electrical Code (NEC), adopted statewide by Utah Code § 15A-2-103(1)(g) — despite the County website listing 2020 NEC, the 2023 edition is the in-force statewide law.
- Cache County's FAQ states: 'If you're just replacing a furnace or an electrical panel, contact our office for a utility permit.' Call (435) 755-1650 press 1 to confirm whether your specific project requires a full building permit or a utility-type permit.
- Homeowners may perform electrical work on their own primary residence but must obtain a permit and pass all inspections. Owner-builder
- AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC. GFCI required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
- Installing a home EV charger (new circuit or panel work) is covered under this general Electrical Permit — the county's fee schedule does not itemize a separate EV-charger fee the way it does for meter upgrades, generators, and Generlink switches.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Cache County
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →