Skip to main content
PermitBase

Unincorporated Cache County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Cache County, Utah.

Last verified 2026-07-17 · Source · Embed this page’s badge · Version history

Building department

Address
179 N Main St, Suite 305, Logan, UT 84321
Phone
(435) 755-1650
Office hours
Mon–Fri 8:00 AM – 5:00 PM (permit pickup/payment ends at 4:45 PM)

Inspection guide

See how inspections work in Unincorporated Cache County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both. NOTE (county page live-checked 2026-07-16): the Cache County Building Code Information page lists 2024 IECC in its main statewide-codes list but separately carries a 'Residential Code: 2021 IRC and the 2021 IECC' line for dwellings up to a duplex — that residential IECC carve-out lags the statute, which adopts a single 2024 IECC edition with no residential/commercial split; the statewide 2024 IECC governs.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision. NOTE: The Cache County Building Code Information page (last seen 2026-06-30) still lists '2020 NEC' — that page is not updated; the statewide 2023 NEC is the legally in-force edition.
  • NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
208units

105 buildings · $52.7M valuation

Trailing 12 months
1,290units

12 of 12 months reported · #7 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
634units

394 buildings · $184.8M valuation

Full year 2025
1,112units

864 buildings · $355.9M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities; county file row: 'Cache County' (co2605c.txt, 49/005); place file also carries 'Cache County Unincorporated Area' (place code 99990) as a possible Phase-1 alternative

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • The Cache County Building Division issues permits for unincorporated county areas AND many incorporated municipalities (Amalga, Avon, Benson, Cornish, Cove, Hyrum, Millville, Paradise, Petersboro, Providence, Richmond, River Heights, Smithfield, Trenton, Wellsville). Logan City, Clarkston, Hyde Park, Lewiston, Mendon, Newton, Nibley, North Logan issue their own permits.
  • ALL permit applications must be submitted digitally by email to cachecountyplanreview@gmail.com — all materials must be in ONE email; incomplete packets are deleted from the queue.
  • A Zoning Clearance from the Cache County Zoning/Planning & Zoning office (435-755-1640, devservices@cachecounty.gov) is required before most building permits can be processed.
  • Inspections require at least 24-hour advance notice with a 3:30 PM cutoff the prior business day. Calling 2–3 days in advance is recommended.
  • Environmental standards for Cache Valley: Roof Snow Load 35+ lbs/sq ft (valley), 100+ lbs/sq ft (canyon/mountain); Seismic Zone D; Wind 90 mph; Frost Depth 30 inches.
  • The County's Building Code Information page lists 2020 NEC, but the statewide in-force edition is 2023 NEC per Utah Code § 15A-2-103 — contractors and homeowners should use the 2023 NEC.
  • As of July 1, 2026 — 2024 IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect statewide (re-verified live against Utah Code § 15A-2-103 on 2026-07-16); 2021 IRC continues unchanged; 2023 NEC continues unchanged.
  • Cache County buildings cover Seismic Design Category D — structural design must account for this.
  • Re-inspection fee of $75 is charged when the inspector arrives and the project is not ready — complete a final walk-through before scheduling.

Comparable nearby cities

Logan
Both in Cache County13 shared permit types
Compare fees →
North Logan
Both in Cache County7 shared permit types
Compare fees →
Nibley
Both in Cache County6 shared permit types
Compare fees →