Required for new commercial construction, additions, and remodels in unincorporated Cache County. The Cache County Building Division Fee Schedule (Ord. 2024-18) contains a dedicated COMMERCIAL PERMITS section with its own 'New Construction, Addition & Remodel (Commercial)' valuation table, separate from the residential/unincorporated SFD table used for houses. Plan review on commercial permits is 65% of the base fee (versus 15% on most residential permit types), and the state adds its standard 1% surcharge.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial building construction, addition, or remodel on a properly zoned parcel
  • Approved Zoning Clearance and Site Plan from Cache County Planning & Zoning ((435) 755-1640) before the building permit application is processed
  • Complete set of construction plans/drawings covering the full scope of work
  • Application Commercial Plan Review Deposit due at submittal — $1,000 for projects valued under $5,000,000, $2,500 for projects valued $5,000,000 and over
  • Owner/Builder Certification does not apply — Cache County's Building Permit Applications page limits that form to 'Residential new construction, remodel, and addition only, no commercial' Owner-builder

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

New Construction, Addition & Remodel (Commercial) — valuation below $100,000Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024), COMMERCIAL PERMITS table 'New Construction, Addition & Remodel (Commercial)', row 'Total Valuation Below $100,000'; PDF fetched and confirmed live 2026-07-19.
$2,192
New Construction, Addition & Remodel (Commercial) — valuation $100,000–$250,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $100,000-$250,000'; confirmed live 2026-07-19.
$3,254
New Construction, Addition & Remodel (Commercial) — valuation $250,000–$500,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $250,000-$500,000'; confirmed live 2026-07-19.
$5,000
New Construction, Addition & Remodel (Commercial) — valuation $500,000–$1,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $500,000-$1,000,000'; confirmed live 2026-07-19.
$7,000
New Construction, Addition & Remodel (Commercial) — valuation $1,000,000–$2,500,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $1,000,000-$2,500,000'; confirmed live 2026-07-19.
$9,000
New Construction, Addition & Remodel (Commercial) — valuation $2,500,000–$5,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $2,500,000-$5,000,000'; confirmed live 2026-07-19.
$15,900
New Construction, Addition & Remodel (Commercial) — valuation $5,000,000–$7,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $5,000,000-$7,000,000'; confirmed live 2026-07-19.
$24,000
New Construction, Addition & Remodel (Commercial) — valuation $7,000,000–$10,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $7,000,000-$10,000,000'; confirmed live 2026-07-19.
$35,000
New Construction, Addition & Remodel (Commercial) — valuation $10,000,000–$15,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $10,000,000-$15,000,000'; confirmed live 2026-07-19.
$54,000
New Construction, Addition & Remodel (Commercial) — valuation $15,000,000–$20,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $15,000,000-$20,000,000'; confirmed live 2026-07-19.
$68,000
New Construction, Addition & Remodel (Commercial) — valuation $20,000,000–$30,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $20,000,000-$30,000,000'; confirmed live 2026-07-19.
$108,000
New Construction, Addition & Remodel (Commercial) — valuation $30,000,000–$40,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $30,000,000-$40,000,000'; confirmed live 2026-07-19.
$140,000
New Construction, Addition & Remodel (Commercial) — valuation $40,000,000–$50,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $40,000,000-$50,000,000'; confirmed live 2026-07-19.
$165,000
New Construction, Addition & Remodel (Commercial) — valuation $50,000,000–$60,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $50,000,000-$60,000,000'; confirmed live 2026-07-19.
$200,000
New Construction, Addition & Remodel (Commercial) — valuation over $60,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation Over $60,000,000'; confirmed live 2026-07-19.
Consult building department
Plan Review FeeCache County Building Division Fee Schedule, Ord. 2024-18 — every row of the 'New Construction, Addition & Remodel (Commercial)' table lists '65% of Base Fee' in its Plan Review Fees column, versus 15% used on most residential permit types; confirmed live 2026-07-19.
65% of base fee
State SurchargeCache County Building Division Fee Schedule, Ord. 2024-18, row 'State Regulated 1% toward all building permit fees - Commercial'; confirmed live 2026-07-19.
1% of base fee
Application Commercial Plan Review Deposit — valuation below $5,000,000Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Application Commercial Plan Review Deposit — Total Valuation Below $5,000,000'; confirmed live 2026-07-19.
$1,000
Application Commercial Plan Review Deposit — valuation $5,000,000 and overCache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Application Commercial Plan Review Deposit — Total Valuation Over $5,000,000'; confirmed live 2026-07-19.
$2,500
Building Permit RenewalCache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Building Permit Renewal'; confirmed live 2026-07-19.
$75
Re-Inspection FeeCache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Re-inspection Fee'; confirmed live 2026-07-19.
$75
Other Inspections, No Specific Fee NotedCache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Other Inspections, No Specific Fee Noted'; confirmed live 2026-07-19.
$75 per hour

Review timeline

Plan reviewUnincorporated Cache County’s published plan-review target
30–45 business days

How long did your Commercial Building Permit permit actually take in Unincorporated Cache County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    After trenches are excavated, forms erected, and steel is in place and tied — before concrete pour. Same requirement published on Cache County's general Building Inspections page (no separate commercial-specific inspection list is published by the county).

  2. 2

    Foundation

    After forms are erected and steel is in place and tied

  3. 3

    Underground Plumbing / Utilities

    Before floor slab pour and after pressure testing of underground plumbing

  4. 4

    Rough-In (Framing, Plumbing, Mechanical, Electrical)

    After roof, framing members, and fire blocking are in place and all pipes, vents, ducts, and wiring are installed, before any of it is covered

  5. 5

    Final

    After the building is completed and prior to occupancy

See the full Unincorporated Cache County inspection guide — scheduling & re-inspection fees →

Tips

  • Cache County uses a separate, higher-fee COMMERCIAL PERMITS valuation table from the residential/unincorporated SFD table — do not estimate a commercial project's fee using the residential tiers.
  • Plan review on commercial permits is 65% of the base fee, versus 15% for most residential permit types — budget accordingly.
  • An Application Commercial Plan Review Deposit ($1,000 or $2,500 depending on valuation) is due at submittal, in addition to the eventual permit fee.
  • The Owner/Builder Certification form does not apply to commercial projects per Cache County's Building Permit Applications page — that form is limited to residential new construction, remodels, and additions. Owner-builder
  • Cache County's own guidance flags commercial review as taking materially longer than residential — 30-45 working days versus 3-10 working days — so plan submittal timing accordingly.
  • Call the building office at (435) 755-1650 press 1 to confirm project-specific requirements before submitting.

Frequently asked questions

Unincorporated Cache County requires a commercial building permit for: New commercial building construction, addition, or remodel on a properly zoned parcel; Approved Zoning Clearance and Site Plan from Cache County Planning & Zoning ((435) 755-1640) before the building permit application is processed; Complete set of construction plans/drawings covering the full scope of work; Application Commercial Plan Review Deposit due at submittal — $1,000 for projects valued under $5,000,000, $2,500 for projects valued $5,000,000 and over; Owner/Builder Certification does not apply — Cache County's Building Permit Applications page limits that form to 'Residential new construction, remodel, and addition only, no commercial'. If your project isn't listed, confirm with Cache County Building Division at (435) 755-1650 before starting work.

Cache County's COMMERCIAL PERMITS fee table (Ord. 2024-18, adopted 11/6/2024) prices new construction, additions, and remodels by valuation: $2,192 below $100,000, scaling up through $200,000 for $50M–$60M valuation, with 'Consult building department' above $60,000,000. Plan review adds 65% of the base fee and the state adds a 1% surcharge. A Commercial Plan Review Deposit ($1,000 or $2,500) is also due at submittal.

Cache County's Building Permit Applications page states larger commercial projects may take 30-45 working days for approval, compared to 3-10 working days for typical (residential) projects. Contact the building office at (435) 755-1650 press 1 for a project-specific estimate.

You'll need: Building Permit Application; Approved Zoning Clearance and Site Plan; Complete Set of Construction Plans (PDF); Commercial Plan Review Deposit Payment. See the required-documents checklist on this page for details on each.

Unincorporated Cache County requires 5 inspection(s) for a commercial building permit, in order: Footings, Foundation, Underground Plumbing / Utilities, Rough-In (Framing, Plumbing, Mechanical, Electrical), Final. Schedule each through Cache County Building Division ((435) 755-1650).

Apply through Cache County Building Division at 179 N Main St, Suite 305, Logan, UT 84321. Phone: (435) 755-1650, email: cachecountyplanreview@gmail.com. Office hours: Mon–Fri 8:00 AM – 5:00 PM (permit pickup/payment ends at 4:45 PM). Official information: https://www.cachecounty.gov/building/.

Unincorporated Cache County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both. NOTE (county page live-checked 2026-07-16): the Cache County Building Code Information page lists 2024 IECC in its main statewide-codes list but separately carries a 'Residential Code: 2021 IRC and the 2021 IECC' line for dwellings up to a duplex — that residential IECC carve-out lags the statute, which adopts a single 2024 IECC edition with no residential/commercial split; the statewide 2024 IECC governs.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision. NOTE: The Cache County Building Code Information page (last seen 2026-06-30) still lists '2020 NEC' — that page is not updated; the statewide 2023 NEC is the legally in-force edition.; NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date..

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Cache County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.