How to schedule
Inspections are requested through the building department below.
- Address
- 751 East 100 North, Suite 2600, Price, UT 84501
- Phone
- (435) 636-3260 (Building Division main line / Administrative Assistant); (435) 636-3261 (Director of Building & Planning)
- Office hours
- Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM (Building Department-specific hours per the county's own Building Permits FAQ; distinct from general County Administration hours of Mon–Fri 8:00 AM – 5:00 PM)
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Home / Cabin)
- 1
Foundation Inspection
Footings, walls, structural slabs — prior to pouring concrete.
- 2
Concrete Slab or Under-Floor Inspection
Electrical and plumbing prior to concrete.
- 3
Shear Wall Fasteners
Before covering sheathing.
- 4
Lath and Flashing
Stucco — prior to covering.
- 5
4-Way Inspection
Frame, electrical, plumbing, mechanical.
- 6
Sheetrock Inspection
Only if living space is located above a garage.
- 7
Utility Connections
Gas meter and power connection verification.
- 8
Final Inspection
For occupancy. Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260; next-day inspections are not guaranteed if requested after 3 PM.
Applies to: Commercial Building Permit
- 1
Foundation Inspection
Footings, walls, structural slabs — prior to pouring concrete.
- 2
4-Way Inspection
Frame, electrical, plumbing, mechanical.
- 3
Fire Sprinkler
If a fire sprinkler system is required per the engineered plan set.
- 4
Utility Connections
Gas meter and power connection verification.
- 5
Final Inspection
For occupancy. Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough 4-Way
Rough electrical, plumbing, and mechanical as applicable to the tenant-improvement scope, before wall closure.
- 2
Final Inspection
Completed work verified before reoccupancy. Call at least 24-72 hours in advance at (435) 636-3260.
Applies to: EV Charger / EVSE Permit
- 1
Utility Connections
Electrical inspection of the new EV charger circuit and panel work; power connection verification, per Carbon County's standard inspection sequence.
- 2
Final Inspection
Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260.
Applies to: Fire Alarm System Permit / Plan Review
- 1
Utility/Electrical Connections (local)
Fire alarm wiring is verified as part of Carbon County's standard electrical inspection sequence for buildings not under State Fire Prevention Board jurisdiction — no fire-alarm-specific inspection line item is separately published.
- 2
State Fire Marshal Review / Acceptance (if applicable)
For buildings under State Fire Prevention Board jurisdiction (R710-4: public buildings, schools/colleges, institutional occupancies, assembly occupancies of 50+), the SFM or an authorized deputy additionally reviews plans for the fire alarm system.
Applies to: Fire Sprinkler System Permit / Plan Review
- 1
Fire Sprinkler Inspection (local)
Part of Carbon County's standard commercial building-permit inspection sequence for buildings not under State Fire Prevention Board jurisdiction — same inspection documented in this dataset's commercial-building-permit entry.
- 2
State Fire Marshal Review / Acceptance (if applicable)
For buildings under State Fire Prevention Board jurisdiction (R710-4: public buildings, schools/colleges, institutional occupancies, assembly occupancies of 50+), the SFM or an authorized deputy additionally reviews plans and may be involved in system acceptance.
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, grounding/bonding, and back-fed panel connections verified before the system is energized.
- 2
Final
Completed PV installation, panel mounting, and labeling verified for approval. Call (435) 636-3260 to schedule.
Final inspection only: Conditional Use Permit — Business Occupancy, Sign Permit
Re-inspection fees
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Price building permits
Get alerts for Price
We'll email you when Price's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.