Price building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Price, Utah.

Reviewed 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
751 East 100 North, Suite 2600, Price, UT 84501
Phone
(435) 636-3260 (Building Division main line / Administrative Assistant); (435) 636-3261 (Director of Building & Planning)
Office hours
Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM (Building Department-specific hours per the county's own Building Permits FAQ; distinct from general County Administration hours of Mon–Fri 8:00 AM – 5:00 PM)

Inspection sequence

Applies to: Residential Building Permit (New Home / Cabin)

  1. 1

    Foundation Inspection

    Footings, walls, structural slabs — prior to pouring concrete.

  2. 2

    Concrete Slab or Under-Floor Inspection

    Electrical and plumbing prior to concrete.

  3. 3

    Shear Wall Fasteners

    Before covering sheathing.

  4. 4

    Lath and Flashing

    Stucco — prior to covering.

  5. 5

    4-Way Inspection

    Frame, electrical, plumbing, mechanical.

  6. 6

    Sheetrock Inspection

    Only if living space is located above a garage.

  7. 7

    Utility Connections

    Gas meter and power connection verification.

  8. 8

    Final Inspection

    For occupancy. Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260; next-day inspections are not guaranteed if requested after 3 PM.

Applies to: Commercial Building Permit

  1. 1

    Foundation Inspection

    Footings, walls, structural slabs — prior to pouring concrete.

  2. 2

    4-Way Inspection

    Frame, electrical, plumbing, mechanical.

  3. 3

    Fire Sprinkler

    If a fire sprinkler system is required per the engineered plan set.

  4. 4

    Utility Connections

    Gas meter and power connection verification.

  5. 5

    Final Inspection

    For occupancy. Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Rough 4-Way

    Rough electrical, plumbing, and mechanical as applicable to the tenant-improvement scope, before wall closure.

  2. 2

    Final Inspection

    Completed work verified before reoccupancy. Call at least 24-72 hours in advance at (435) 636-3260.

Applies to: EV Charger / EVSE Permit

  1. 1

    Utility Connections

    Electrical inspection of the new EV charger circuit and panel work; power connection verification, per Carbon County's standard inspection sequence.

  2. 2

    Final Inspection

    Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260.

Applies to: Fire Alarm System Permit / Plan Review

  1. 1

    Utility/Electrical Connections (local)

    Fire alarm wiring is verified as part of Carbon County's standard electrical inspection sequence for buildings not under State Fire Prevention Board jurisdiction — no fire-alarm-specific inspection line item is separately published.

  2. 2

    State Fire Marshal Review / Acceptance (if applicable)

    For buildings under State Fire Prevention Board jurisdiction (R710-4: public buildings, schools/colleges, institutional occupancies, assembly occupancies of 50+), the SFM or an authorized deputy additionally reviews plans for the fire alarm system.

Applies to: Fire Sprinkler System Permit / Plan Review

  1. 1

    Fire Sprinkler Inspection (local)

    Part of Carbon County's standard commercial building-permit inspection sequence for buildings not under State Fire Prevention Board jurisdiction — the same inspection applies to the commercial building permit.

  2. 2

    State Fire Marshal Review / Acceptance (if applicable)

    For buildings under State Fire Prevention Board jurisdiction (R710-4: public buildings, schools/colleges, institutional occupancies, assembly occupancies of 50+), the SFM or an authorized deputy additionally reviews plans and may be involved in system acceptance.

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, grounding/bonding, and back-fed panel connections verified before the system is energized.

  2. 2

    Final

    Completed PV installation, panel mounting, and labeling verified for approval. Call (435) 636-3260 to schedule.

Re-inspection fees

Sign Permit
Re-inspection Fee · Price City Land Use Development and Management Code § 4.10: a re-inspection fee is charged to defray re-inspection costs after a notice of violation, 'for each inspection required until compliance... Show full citationRe-inspection Fee · Price City Land Use Development and Management Code § 4.10: a re-inspection fee is charged to defray re-inspection costs after a notice of violation, 'for each inspection required until compliance... has occurred.' Amount 'established by resolution of the City Council' — not found in a published fee schedule.
Amount not published; charged per notice-of-violation re-inspection

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Price building permits

Get alerts for Price

We'll email you when Price's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.