Sign Permit in Price, Utah
Required for erecting, reconstructing, or remodeling most signs in Price City, per Chapter 4 (Sign Regulations / Sign Code) of the Price City Land Use Development and Management Code, § 4.9 (Sign Permit and Permit Fee Required). Applications go to the Zoning Administrator, who must issue the permit within 60 days of receipt if the proposed sign complies with the code. PermitBase could not locate the specific dollar fee amount in any Price City fee schedule published online — the code states only that the fee is 'established by resolution of the City Council' and identified in 'the approved fee schedule of Price City'; Price's own online Planning and Zoning Permit Fee Schedule (effective 1-1-2026) covers subdivision, rezoning, and conditional-use fees but does not list a sign line item, and no separate building-permit fee schedule with a sign line item was found on either priceutah.gov or Carbon County's building-permit pages (Price contracts building inspection to Carbon County).
Reviewed 2026-07-20 · Source
When you need this permit
- All signs must comply with current International Electric Code and International Building Code standards as adopted by Price City, plus city ordinances and Utah law (§ 4.5.2)
- Signs requiring inspection of electrical connections or structural attachments must be installed under inspection of the Price City Building Inspector (§ 4.5.4)
- No permit required for sign maintenance or a change of copy alone (§ 4.5.1)
- Anyone erecting, altering, relocating, constructing, or maintaining signs near/upon public right-of-way must hold a valid Utah contractor license and valid business license, and carry liability insurance of at least $3,000,000 (§ 4.5.8) Contractor
- Sign type, dimensions, number, and location are regulated by one of three sign overlay districts — S-1 (Residential), S-2 (Downtown/Shopping Centers), S-3 (Arterial/State Highways) — per §§ 4.11–4.13
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Initial / Completion Inspection
Per § 4.6, the Building Official or Zoning Administrator makes an initial inspection upon completion, erection, reconstruction, or remodeling of a sign to verify compliance.
See the full Price inspection guide — scheduling & re-inspection fees →
Tips
- Price City's Land Use Development and Management Code § 4.9 sets a hard issuance deadline: the Zoning Administrator must issue a compliant sign permit within 60 days of receiving the application.
- PermitBase could not confirm the actual dollar fee for a Price City sign permit from any published source — the ordinance points to a Council-set fee schedule that doesn't appear to be published online with a sign line item. Confirm the fee directly with Price City Planning & Zoning before budgeting.
- Some sign types and activities are exempt from the permit requirement entirely, including small temporary on-premise signs (≤14 days), real estate 'for sale'/'for rent' signs, temporary election/yard-sale signs, interior signs, and construction signs (≤45 sq ft, up for 10 days pre-construction to 1 day post-completion) — see § 4.5.9 for the full exemption list.
- Price contracts its building permit review and inspection to Carbon County (carbon.utah.gov) — but the Sign Permit itself is administered by the Price City Zoning Administrator per the city's own Land Use code, not by the county.
- Sign regulations vary by overlay district: S-1 (Residential), S-2 (Downtown/Shopping Centers), S-3 (Arterial/State Highways) — confirm which district your site falls in before designing a sign.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Price
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Price project checklist
Describe your project once and get every permit, document, and fee it triggers in Price — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →