Residential Building Permit (New Home / Cabin) — Price, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.carbon.utah.gov/service/building-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Home / Cabin) in Price, Utah
Required for new single-family home and cabin construction on property within Price City limits (as well as unincorporated Carbon County and the county's other incorporated cities/towns). Issued exclusively by Carbon County's Building & Planning Department — Price City has no independent building-permit function and instead requires proof of separate city zoning approval as a prerequisite. Reviewed under the state-mandated 2024 IBC (incl. Appendix J) and 2021 IRC (incl. Appendix Q), per Utah Code § 15A-2-103, effective 7/1/2026; plus 2024 IPC/IMC/IFGC and 2023 NEC. Carbon County's own FAQ still lists the pre-flip 2021 IBC/IPC/IMC/IFGC and 2020 NEC as of live re-check 2026-07-16 — see codesAdopted for the governing-law citations.
Reviewed 2026-07-20 · Source
When you need this permit
- Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect/install/enlarge/alter/repair/remove/convert/replace any electrical, gas, mechanical or plumbing system, must first apply to the Building Department and obtain the required permit (per Carbon County Building Permits page, quoting the adopted code's permit-requirement section)
- Proof of city zoning approval required for property within Price City limits, in addition to the county building permit — per both Price City's own Planning & Zoning page and Carbon County's Building Permits FAQ ('If you are building in East Carbon, Helper, Price City, Wellington, or Scofield Town, you must provide proof of city zoning approval')
- Completed and signed Building Permit Application, including contractor's name(s) and license number(s), or a signed Owner/Builder Certification Form if the owner is completing any of the work Owner-builder
- A complete plan set (PDF only — jpgs and other file types not accepted) including site plan, footing/foundation plan, wall framing/columns/beams, floor framing, roof framing or stamped truss sheets, electrical plan, plumbing plan, HVAC plans with heating/cooling load calculations (Manual J & D), and gas pipe sizing calculations
- Proof of fees paid for water connection (PRWID or city water authority) and sewer hook-up (PRWID, city sewer authority, or Scofield Reservoir Special Service District) or, where unserved, spring/well approval from the Utah Division of Water Rights and/or Individual Wastewater (septic) approval from the Southeast Utah Health District
- Engineered WET-stamped plans (no copies accepted) required for all structures in the Scofield area D0 seismic zone, and may be required elsewhere for unusual shapes/sizes, foundation/basement walls over 9 feet, walkout basements, basements with a garage, or non-rectangular log structures
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation Inspection
Footings, walls, structural slabs — prior to pouring concrete.
- 2
Concrete Slab or Under-Floor Inspection
Electrical and plumbing prior to concrete.
- 3
Shear Wall Fasteners
Before covering sheathing.
- 4
Lath and Flashing
Stucco — prior to covering.
- 5
4-Way Inspection
Frame, electrical, plumbing, mechanical.
- 6
Sheetrock Inspection
Only if living space is located above a garage.
- 7
Utility Connections
Gas meter and power connection verification.
- 8
Final Inspection
For occupancy. Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260; next-day inspections are not guaranteed if requested after 3 PM.
See the full Price inspection guide — scheduling & re-inspection fees →
Tips
- Price City has no building-permit process of its own — do not attempt to apply for a building permit at Price City Hall. All building permits for property within Price City limits are applied for at Carbon County's Building & Planning Office (751 E 100 N, Suite 2600, Price, UT 84501) or online at carbon.utah.gov.
- Property within Price City limits still needs a SEPARATE city zoning sign-off from Price City's own Planning & Zoning office (Nick Tatton, 435-636-3184, City Hall, 185 East Main) before or alongside the county building permit — budget extra time for this step, which the county's own New Home Checklist explicitly flags as adding to the timeline.
- The county's New Home or Cabin Checklist packet warns: 'NO APPLICATIONS WILL BE ACCEPTED WITHOUT ALL OF THE ITEMS THAT ARE LISTED' — incomplete submittals (missing proof of water/sewer fees paid, missing zoning approval, etc.) will not start the review clock.
- As of January 1, 2025, New Construction and Solar permit applications require a non-refundable $250 deposit, credited toward the final permit fee.
- Plans must be submitted as PDF only — jpgs and other file formats are explicitly not accepted by the county Building Department.
- Carbon County could not be confirmed to publish a dollar-amount valuation-based fee table for building permits anywhere on its official website as of this review — contact the Building Department directly at (435) 636-3260 or planning@carbon.utah.gov for a current fee quote before applying. Re-chased again 2026-07-23 (Wayback CDX sweep, Business License page/Ordinance 281 trace, Utah PMN full-text search API) with no new figure found — see localAmendments for the full 2026-07-23 chase log; this is a county-wide gap, not specific to residential permits.
- EV charger/EVSE installation in Price City falls under Carbon County's standard building permit process, not a distinct EV category — the county's official Building Permits page (carbon.utah.gov/service/building-permits/) lists 'Altering electrical, gas, or plumbing systems' among the reasons a permit is required under its 'When do I need a permit?' FAQ, with no EV-charger-specific or electric-vehicle mention found anywhere on carbon.utah.gov as of a direct check on 2026-07-20.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Price
Residential Building Permit (New Home / Cabin) in other cities
Compare residential building permit (new home / cabin) fees across Utah →
Look up this fee in a different city →
Now live
Build your Price project checklist
Describe your project once and get every permit, document, and fee it triggers in Price — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →