Commercial Building Permit in Price, Utah
Required for new commercial and industrial construction on property within Price City limits. Issued exclusively by Carbon County's Building & Planning Department — Price City has no independent building-permit function and requires proof of separate city zoning approval as a prerequisite (and, if the site is in an Industrial Zone, a Conditional Use Permit that can take up to 2 months). Carbon County publishes a dedicated 'Commercial and Industrial Structures' checklist distinct from its residential New Home/Cabin packet.
Reviewed 2026-08-02 · Source
When you need this permit
- Approval from Price City's Zoning Administrator (or the relevant zoning authority) — proof of city zoning approval is required before/alongside the county building permit
- If the property is in an Industrial Zone: all uses require a Conditional Use Permit, and the building permit cannot be approved until that process is complete; approval may take up to 2 months
- Completed and signed Building Permit Application with contractor name(s) and Utah license number(s), applied online at carbon.utah.gov/department/building/
- Site plan drawn to scale showing lot shape/dimensions, street, front of lot, setbacks to property lines, utilities, and septic system if applicable
- 2 sets of engineered WET-stamped plans (PDF, not less than 1/4" = 1'), sealed and signed by registered Utah Architects and/or Professional Engineers trained in the specific discipline (electrical, plumbing, mechanical, or structural) being sealed
- Fire sprinkler system plans, if required
- Proof of fees paid for water connection (PRWID or city water authority) and sewer hook-up (PRWID, city sewer authority, or Scofield Reservoir Special Service District), or spring/well and septic approval where unserved
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Foundation Inspection
Footings, walls, structural slabs — prior to pouring concrete.
- 2
4-Way Inspection
Frame, electrical, plumbing, mechanical.
- 3
Fire Sprinkler
If a fire sprinkler system is required per the engineered plan set.
- 4
Utility Connections
Gas meter and power connection verification.
- 5
Final Inspection
For occupancy. Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260.
See the full Price inspection guide — scheduling & re-inspection fees →
Tips
- Carbon County (carbon.utah.gov) publishes no dollar-amount valuation-based commercial fee table — not on the Building Permits page (carbon.utah.gov/service/building-permits/), the Building Department page, or the Commercial and Industrial Structures checklist, which is a document checklist only, with zero fee figures. The only published dollar figures countywide are a $250 new-construction/solar deposit and $30 GIS deposit. This is a county-wide gap, not specific to commercial permits. Contact the Building Department at (435) 636-3260 or planning@carbon.utah.gov for a current commercial fee quote. Related sources confirm the absence: the Commercial and Industrial Structures Packet PDF contains no fee table; the Commercial Site Plan requirements PDF is a document-requirements sheet only, with zero dollar figures; the Business License page and Ordinance 281 supply no commercial building-permit fee figure; a Feb 2026 'Consolidated Fee Schedule' PDF at utah.gov/pmn/files/1391965.pdf belongs to the Town of Dutch John in a different Utah county (the document nowhere mentions Carbon County, and a Utah Public Meeting Notice entity-filtered full-text search for 'Consolidated Fee Schedule' under Carbon County returns zero results), so it must not be misattributed to Carbon County; carbonutah.com/service/building-applications-agreements/ returns a 404; Carbon County has no publicly indexed searchable code site on library.municode.com or elsewhere (unlike Price City's code, which is on amlegal.com); and the Carbon County Commission's public-body notice feed (utah.gov/pmn/sitemap/publicbody/1148.html), including the July 15, 2026 agenda (utah.gov/pmn/files/1461077.pdf) and the full 4-page July 1, 2026 minutes (utah.gov/pmn/files/1464027.pdf), contains no building-permit fee, fee-schedule, or fee-resolution agenda item.
- Commercial and industrial projects require engineered WET-stamped plans from a Utah-registered Architect or Professional Engineer for EVERY discipline involved (structural, electrical, plumbing, mechanical) — this is a hard, unconditional requirement, unlike residential permits where engineering is only conditionally triggered.
- If your property is in an Industrial Zone, budget up to 2 months for the required Conditional Use Permit process BEFORE the building permit itself can be approved — this is separate from and in addition to the 21-business-day building-permit plan review.
- Property within Price City limits still needs separate city zoning sign-off (Nick Tatton, 435-636-3184) — the county's Commercial and Industrial checklist explicitly flags 'additional time may be necessary for city zoning approval and a zoning fee may be required' for Price City, Scofield Town, Helper, East Carbon, or Wellington.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Price.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Price's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Price yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Price lands. Privacy.
Other permits in Price
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →