Commercial Tenant Improvement / Tenant Finish Permit — Price, Utah · Requirements sheet
Reviewed 2026-07-19 · Source: https://www.carbon.utah.gov/wp-content/uploads/2026/05/Commercial-_-Industrial-Structures-Packet-2026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Tenant Finish Permit in Price, Utah
Required for interior tenant-improvement and tenant-finish work within existing commercial space on property within Price City limits. Carbon County does not publish a fee category or checklist distinct from new commercial construction — the same Commercial and Industrial Structures checklist and unconditional engineered-plan requirement apply, scoped to the actual work performed. Price City zoning approval is still required for the underlying property/use unless the TI is a pure interior scope not implicating zoning.
Reviewed 2026-07-19 · Source
When you need this permit
- Interior tenant-improvement or tenant-finish work inside existing commercial space within Price City limits
- Completed and signed Building Permit Application with contractor name(s) and license number(s)
- Engineered WET-stamped plans for any structural, electrical, plumbing, or mechanical work involved in the tenant finish, sealed by a Utah-registered Architect or Professional Engineer in the relevant discipline
- Fire sprinkler system plans, if the tenant improvement affects or requires fire suppression coverage
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough 4-Way
Rough electrical, plumbing, and mechanical as applicable to the tenant-improvement scope, before wall closure.
- 2
Final Inspection
Completed work verified before reoccupancy. Call at least 24-72 hours in advance at (435) 636-3260.
See the full Price inspection guide — scheduling & re-inspection fees →
Tips
- No dollar-amount fee table for tenant improvements is published on carbon.utah.gov — contact the Building Department at (435) 636-3260 for a project-specific quote. Re-chased again 2026-07-23 (Wayback CDX sweep, Business License page/Ordinance 281 trace, Utah PMN full-text search API) with no new figure found — see this jurisdiction's residential-building-permit localAmendments for the full 2026-07-23 chase log; this is a county-wide gap shared with the general commercial-building-permit entry, not specific to tenant improvements.
- Even an interior-only tenant finish that changes structural, electrical, plumbing, or mechanical systems requires stamped engineering from a Utah-registered Architect or Professional Engineer per discipline, per the county's unconditional commercial engineering requirement.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Price.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Price
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Price project checklist
Describe your project once and get every permit, document, and fee it triggers in Price — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →