EV Charger / EVSE Permit — Price, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.carbon.utah.gov/service/building-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Price, Utah
EV charger/EVSE installation for property within Price City limits falls under Carbon County's standard building permit process (Carbon County Building & Planning Department issues all building permits for Price City — Price City has no independent building-permit function; see the residential-building-permit entry's department/localAmendments notes). Carbon County's official Building Permits page (carbon.utah.gov/service/building-permits/) lists 'Altering electrical, gas, or plumbing systems' among the reasons a permit is required under its 'When do I need a permit?' FAQ, with no EV-charger-specific or electric-vehicle mention found anywhere on carbon.utah.gov as of a direct check on 2026-07-20. No dollar-amount valuation-based fee table (for building permits generally, let alone EV/electrical specifically) could be located on Carbon County's official website after an exhaustive search — matching the same fee-table gap already documented for Price's other Carbon-County-administered permit types in this dataset. Per the zero-tolerance data policy, this entry is left with fees:[] and confidence:'partial' rather than fabricated or borrowed from a non-Carbon-County source.
Reviewed 2026-07-20 · Source
When you need this permit
- Any owner or owner's authorized agent who intends to erect/install/enlarge/alter/repair/remove/convert/replace an electrical system (including EV charger/EVSE circuits) must first apply to Carbon County's Building Department and obtain the required permit
- Proof of city zoning approval required for property within Price City limits, in addition to the county building/electrical permit — per both Price City's own Planning & Zoning page and Carbon County's Building Permits FAQ
- New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Utility Connections
Electrical inspection of the new EV charger circuit and panel work; power connection verification, per Carbon County's standard inspection sequence.
- 2
Final Inspection
Call at least 24-72 hours in advance to schedule inspections at (435) 636-3260.
See the full Price inspection guide — scheduling & re-inspection fees →
Tips
- Price City has no building-permit process of its own — EV charger/EVSE permits for property within Price City limits are applied for at Carbon County's Building & Planning Office (751 E 100 N, Suite 2600, Price, UT 84501) or online at carbon.utah.gov, not at Price City Hall.
- Carbon County's Building Permits page lists 'Altering electrical, gas, or plumbing systems' as a reason a permit is required, with no distinct EV-charger or electric-vehicle category found anywhere on the county's site.
- Carbon County could not be confirmed to publish a dollar-amount valuation-based fee table for building or electrical permits anywhere on its official website — contact the Building Department directly at (435) 636-3260 or planning@carbon.utah.gov for a current fee quote before applying. Re-chased again 2026-07-23 (Wayback CDX sweep, Business License page/Ordinance 281 trace, Utah PMN full-text search API) with no new figure found — see this jurisdiction's residential-building-permit localAmendments for the full 2026-07-23 chase log; this is a county-wide gap, not specific to EV charger permits.
- Property within Price City limits still needs a separate city zoning sign-off from Price City's own Planning & Zoning office (435-636-3184) before or alongside the county electrical permit.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Price
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Price project checklist
Describe your project once and get every permit, document, and fee it triggers in Price — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →