Moab building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Moab, Utah.

Verified 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
217 East Center Street, Moab, UT 84532
Phone
(435) 259-5129
Office hours
Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 12:00 PM

Published scheduling rules

  • 24-hour advance notice is required to schedule any inspection — call (435) 259-5129. (Residential Building Permit)

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Building Department

    Core building inspection and final Building Department approval sign-off, one of seven routing lines on the official Building Permit Application. Inspections scheduled by phone at (435) 259-5129; 24-hour advance notice required.

  2. 2

    Zoning Administrator

    Zoning compliance sign-off, a required routing line on the official Building Permit Application.

  3. 3

    Engineering

    Engineering review and approval sign-off, a required routing line on the official Building Permit Application.

  4. 4

    Public Works & Utility

    Public Works and Utility sign-off, a required routing line on the official Building Permit Application.

  5. 5

    Health Department

    Health Department sign-off, a required routing line on the official Building Permit Application (applicable to septic, water systems, and similar).

  6. 6

    Fire Department

    Fire Department review, marked 'REQUIRED ON ALL COMMERCIAL APPLICATIONS' on the official form; included as a routing line for residential applications as well.

  7. 7

    Floodplain Administrator

    Floodplain Administrator sign-off and comments, required when the Floodplain Status field on the application indicates the parcel is within a mapped floodplain; an Elevation Certificate field is also present on the form.

Applies to: Commercial Building Permit

  1. 1

    Fire Department

    Fire Department review is marked 'REQUIRED ON ALL COMMERCIAL APPLICATIONS' on the official Building Permit Application — a mandatory routing/approval step not required on all residential applications.

  2. 2

    Building Department

    Core building inspection and final Building Department approval sign-off. Inspections scheduled by phone at (435) 259-5129; 24-hour advance notice required.

  3. 3

    Zoning Administrator

    Zoning compliance sign-off.

  4. 4

    Engineering

    Engineering review and approval sign-off.

  5. 5

    Health Department

    Applicable to commercial food service, septic, or water systems.

  6. 6

    Final Inspection

    Completed work verified before occupancy.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Fire Department

    Required on all commercial applications, including tenant-finish projects, per the official Building Permit Application form.

  2. 2

    Rough Electrical / Plumbing / Mechanical

    As applicable to the tenant-improvement scope, before wall closure.

  3. 3

    Final Inspection

    Completed work verified before reoccupancy.

Applies to: Change of Use / Change of Occupancy Permit

  1. 1

    Code Analysis / Occupancy Classification Review

    A change in use or occupancy classification is reviewed as part of the standard Building Permit plan review process, per Moab Municipal Code § 17.06.020's definition of 'building permit.'

  2. 2

    Certificate of Occupancy Sign-off Chain

    Per the official Release for Certificate of Occupancy form: Zoning Director, City Engineer, Public Works Director, and Waste Water/Grand Water Sewer Services approval required for both residential and commercial; Moab Valley Fire Inspector and Southeast Utah Health Department approval additionally required for commercial, before the Building Inspector issues the Certificate of Occupancy.

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Fire Alarm Inspection and Acceptance Test

    Pre-system inspection and acceptance test, billed at $115.00 per hour with a one-hour minimum, per MVFD's fee schedule.

  2. 2

    Moab Valley Fire Inspector — Certificate of Occupancy Sign-off

    Required approval line ('Moab Valley Fire Inspector or Designee: Approved/Denied') on the City's official Release for Certificate of Occupancy form, for all commercial projects.

Re-inspection fees

Residential Building PermitRe-inspection Fee · Moab Municipal Code § 3.50.165, 'Reinspection fees assessed under provisions of Section 305.8 due prior to the reinspection' — 2-hour minimum added by Ordinance #2025-08.
Actual costs plus 10%, 2-hour minimum

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.