Commercial Building Permit in Moab, Utah
Required for new commercial construction in Moab. Uses the same generic valuation-based Building Permit Fee table (Moab Municipal Code § 3.50.165) as residential, but the Master Fee Schedule publishes a dedicated 'Plan review — commercial' section with its own nonrefundable plan-review deposit (10% of the building permit fee, $260 minimum — vs. the residential deposit's flat $170), plus a distinct hourly rate for additional commercial plan reviews. Fire Department review is required on all commercial applications.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction
- Any work regulated by the current-statewide 2024 IBC (Utah Code § 15A-2-103(1)(a))
- Site plan submittal showing lot dimensions and building placement
- COMcheck energy code compliance documentation
- Utah State Contractor's License and Moab municipal business license for the general contractor and any subcontractors Contractor
- Fire Department review — marked 'REQUIRED ON ALL COMMERCIAL APPLICATIONS' on the official Building Permit Application form
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Fire Department
Fire Department review is marked 'REQUIRED ON ALL COMMERCIAL APPLICATIONS' on the official Building Permit Application — a mandatory routing/approval step not required on all residential applications.
- 2
Building Department
Core building inspection and final Building Department approval sign-off. Inspections scheduled by phone at (435) 259-5129; 24-hour advance notice required.
- 3
Zoning Administrator
Zoning compliance sign-off.
- 4
Engineering
Engineering review and approval sign-off.
- 5
Health Department
Applicable to commercial food service, septic, or water systems.
- 6
Final Inspection
Completed work verified before occupancy.
See the full Moab inspection guide — scheduling & re-inspection fees →
Tips
- Moab's commercial plan-review deposit (10% of the building permit fee, $260 minimum) explicitly covers 'new construction, tenant finish, and/or major remodel' — the SAME deposit line item applies to both new commercial construction and commercial tenant improvements, per Moab Municipal Code § 3.50.165.
- Fire Department review is mandatory on every commercial application in Moab, per the official Building Permit Application form — budget time for this sign-off, which residential applications do not universally require.
- Additional commercial plan reviews (beyond the initial one covered by the 10% deposit) are billed hourly at $85/hr with a 1-hour minimum — plan for extra cost if your project needs multiple correction/revision cycles.
- A site-specific soils report is not separately called out in Moab's own materials the way it is in Brigham City's or Box Elder County's — confirm directly with the Building Department whether one will be required for your specific commercial project under the state-adopted 2024 IBC.
- No distinct fire sprinkler or fire alarm system permit/plan-review fee is published by either the City of Moab or Moab Valley Fire Protection District (the special district that provides fire service to the Moab area, separate from the City). Moab's own Master Fee Schedule (Chapter 3.50) lists only a water-utility 'Fire sprinkler system connection fee,' billed at 'actual cost to perform the connection' — this is a water-tap fee for connecting a fire sprinkler system to the culinary water main, not a fire-code plan-review or system-installation permit fee. Fire suppression/alarm work is understood to be reviewed as part of the mandatory Fire Department sign-off on the commercial Building Permit Application (see above) rather than through a separately-priced permit; confirm current requirements directly with Moab Valley Fire Protection District (435-259-5557) before budgeting.
- Moab has no standalone Change of Use or Change of Occupancy permit, and no CO-verification/re-issuance fee separate from new construction: the City's own definition of 'building permit' (Moab Municipal Code § 17.06.020) already covers work to 'alter or change the use of a building or other structure,' the Master Fee Schedule (Ordinance #2025-08, moabcity.gov/DocumentCenter/View/5083) has no 'change of use,' 'change of occupancy,' or 'existing building' fee line, and the City's own Release for Certificate of Occupancy form (moabcity.gov/DocumentCenter/View/3009/C-of-O-Release-Form) requires an active Building Permit No. to be issued — confirming a Certificate of Occupancy in Moab is tied to a live building permit, not a standalone existing-building verification process. A use/occupancy classification change is expected to be processed as a standard Commercial Building Permit review; confirm with the Building Department at (435) 259-5129 for project-specific scope.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Moab.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Moab
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Moab project checklist
Describe your project once and get every permit, document, and fee it triggers in Moab — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →