Change of Use / Change of Occupancy Permit in Moab, Utah
Moab does not publish a standalone Change of Use, Change of Occupancy, or Certificate of Occupancy re-issuance permit or fee. Moab Municipal Code § 17.06.020 defines 'building permit' to explicitly include work that would 'erect, construct, reconstruct, grade, excavate for a foundation, alter or change the use of a building or other structure or improvements of land' — folding a use/occupancy classification change into the standard Building Permit process rather than a distinct application. This is corroborated by the City's official Release for Certificate of Occupancy form, which requires an active Building Permit No. on its face and has no standalone change-of-use track, and by the Master Fee Schedule (current through Ordinance 25-01, Jan 28, 2025, as amended by Ordinance #2025-08), which has no 'change of use,' 'change of occupancy,' or 'existing building' fee line. Separately, and not to be conflated with a building-code occupancy change: Moab Municipal Code § 5.04.060 requires an existing licensed business that relocates to file a 'business change of address' before operating at the new location, billed at a distinct, governing $50.00 Administration Fee per the Master Fee Schedule § 3.50.050 (excluding home-occupation licenses, which are $0) — a real fee, but scoped to a business's street address, not an IBC occupancy-classification change to a building.
Verified 2026-07-22 · Source
When you need this permit
- A change in use or occupancy classification for an existing building in Moab is evaluated through the standard Commercial Building Permit process, not a separate application, per Moab Municipal Code § 17.06.020's definition of 'building permit'
- If the use/occupancy change involves construction or tenant-improvement scope, it is processed and fee'd as a Commercial Building Permit or Commercial Tenant Improvement Permit (see those entries)
- A Certificate of Occupancy is tied to an active Building Permit No.: the official Release for Certificate of Occupancy form requires one on its face and, for commercial occupancies, requires Moab Valley Fire Inspector and Southeast Utah Health Department sign-off in addition to Zoning, Engineering, Public Works, and Waste Water approval
- An existing licensed business that changes its physical location (a distinct event from a building's occupancy classification changing) must file a business change of address per Moab Municipal Code § 5.04.060 prior to conducting business at the new location
- Home-occupation business licenses are excluded from the $50.00 change-of-address administration fee per the Master Fee Schedule's own table
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Master Fee Schedule (Moab Municipal Code § 3.50.165, current through Ordinance 25-01 as amended by Ordinance #2025-08) has no 'change of use,' 'change of occupancy,' or 'certificate of occupancy' fee line item. Show full citationHide
The Master Fee Schedule (Moab Municipal Code § 3.50.165, current through Ordinance 25-01 as amended by Ordinance #2025-08) has no 'change of use,' 'change of occupancy,' or 'certificate of occupancy' fee line item. Where the change involves construction or tenant-improvement scope, the standard valuation-based Building Permit Fee applies — see the Commercial Building Permit and Commercial Tenant Improvement Permit entries.Moab Municipal Code § 3.50.050 Master Fee Schedule (current through Ordinance 25-01, passed January 28, 2025), 'Business licenses' table — per the current codified Chapter 3.50 PDF. Show full citationHide
Moab Municipal Code § 3.50.050 Master Fee Schedule (current through Ordinance 25-01, passed January 28, 2025), 'Business licenses' table — per the current codified Chapter 3.50 PDF. This fee governs an existing licensed business relocating to a new address under § 5.04.060; it is a real, distinct, itemized fee, but it is not a building-code change-of-use/occupancy fee and should not be conflated with one.Review timeline
Inspection process
- 1
Code Analysis / Occupancy Classification Review
A change in use or occupancy classification is reviewed as part of the standard Building Permit plan review process, per Moab Municipal Code § 17.06.020's definition of 'building permit.'
- 2
Certificate of Occupancy Sign-off Chain
Per the official Release for Certificate of Occupancy form: Zoning Director, City Engineer, Public Works Director, and Waste Water/Grand Water Sewer Services approval required for both residential and commercial; Moab Valley Fire Inspector and Southeast Utah Health Department approval additionally required for commercial, before the Building Inspector issues the Certificate of Occupancy.
See the full Moab inspection guide — scheduling & re-inspection fees →
Tips
- Do not look for a standalone 'Change of Use Permit' or 'Change of Occupancy Permit' application on moabcity.gov — none exists. A use/occupancy change is captured within the standard Building Permit definition (Moab Municipal Code § 17.06.020: a building permit covers work to 'alter or change the use of a building or other structure').
- Do not confuse the $50.00 'business change of address' administration fee (Moab Municipal Code § 5.04.060 / Master Fee Schedule § 3.50.050) with a building-code change-of-use or change-of-occupancy review — the former applies only when an existing licensed business physically relocates; the latter (no distinct fee) applies when a building's occupancy classification changes and is processed through the standard Building Permit.
- Moab Valley Fire Inspector and Southeast Utah Health Department sign-off are both required on every commercial Certificate of Occupancy, per the City's official Release for Certificate of Occupancy form — budget time for both in addition to Zoning, Engineering, Public Works, and Waste Water approval.
- The § 17.06.020 and § 5.04.060 code text cited here is drawn from the official code pages at moab.municipal.codes.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fee schedules
Applications & forms
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Moab's permit history is searchable by address
2,776 permits on record for Moab, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
97% of Moab's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Moab
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Utah →
Look up this fee in a different city →