Solar PV Permit in Moab, Utah
Required for rooftop-mounted or ground-mounted solar photovoltaic (PV) systems, including battery backup, in Moab. Moab runs a genuinely distinct solar permitting track from its general Building Permit: a dedicated digital-only Solar PV Plan Review Packet (compiled from the 2014 NEC and 2015 IRC) and its own flat, non-valuation-based fee line items in the Master Fee Schedule (Moab Municipal Code § 3.50.165), most recently raised by Ordinance #2025-08 (adopted June 24, 2025). Moab holds a SolSmart Bronze designation for streamlining residential/commercial solar permitting.
Verified 2026-07-19 · Source
When you need this permit
- Roof-mounted or ground-mounted solar PV system installation, using micro-inverters or a string inverter (with or without battery backup)
- Digital-only submittal of the Solar PV Plan Review Packet to inspections@moabcity.org — incomplete or non-digital submittals are returned to the contractor
- Rapid-shutdown disconnect per NEC 690.12, with location shown on the site plan
- Design to Moab/Grand County's local structural criteria: 115 mph wind load; ground snow load 36 psf below 5,000 ft or 65 psf at/above 5,000 ft; roof snow load 25 psf below 5,000 ft or 45 psf at/above 5,000 ft
- Rocky Mountain Power net metering interconnection work order number, if applicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
Per Moab's Solar page, listed as two separate steps: 'Install panels' and 'Have them inspected to ensure they are safe.' Scheduled by calling (435) 259-5129 (24 hours notice required, per the Solar PV Plan Review Packet's building permit application header).
See the full Moab inspection guide — scheduling & re-inspection fees →
Tips
- Ground-mount solar systems cost more to permit than roof-mount: $255/permit vs. $170/permit, per Ordinance #2025-08 (both up from $130/$195 pre-amendment — verify you're not being quoted the stale pre-2025-08 figures still floating on some older City agenda-archive PDFs).
- Moab's Solar PV Plan Review Packet is built specifically for MICRO-INVERTER and STRING INVERTER systems (with or without battery backup) — the packet uses green text for micro-inverter-specific items and blue text for string-inverter-specific items.
- Only digital submittals are accepted; incomplete or paper submittals are returned to the contractor. Many installers submit the permit application on behalf of the homeowner.
- Moab holds a SolSmart Bronze designation, a national recognition for communities that have streamlined their solar permitting, inspection, and zoning processes.
- Battery backup systems (Attachment 10) trigger substantially more plan-review documentation than a grid-tied-only system — budget extra lead time if adding storage.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Moab
Solar PV Permit in other cities
Compare solar pv permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Moab project checklist
Describe your project once and get every permit, document, and fee it triggers in Moab — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →