Commercial Tenant Improvement / Tenant Finish Permit in Moab, Utah

Required for interior tenant-finish and tenant-improvement work within existing commercial space in Moab. Moab Municipal Code § 3.50.165 explicitly names 'tenant finish' in its commercial plan-review deposit line — the SAME 10%-of-building-permit-fee ($260 minimum) deposit and $85/hr additional-review rate documented for the Commercial Building Permit apply directly to tenant-improvement projects, making this one of the more explicitly-verified TI fee structures in this batch of jurisdictions.

Verified 2026-07-19 · Source

When you need this permit

  • Interior tenant-improvement or tenant-finish work within existing commercial space
  • Site plan submittal (may be marked N/A for interior-only work with no exterior changes)
  • Fire Department review — required on all commercial applications, including tenant-finish projects
  • COMcheck energy code compliance documentation for any envelope, lighting, or mechanical changes

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation-basedMoab Municipal Code § 3.50.165 — same generic Building Permit Fee table applies; Moab does not publish a separate TI-specific base fee table.
Same sliding-scale table as new commercial construction, based on the tenant-improvement project's declared valuation
Nonrefundable Commercial Plan Deposit (initial plan review — tenant finish)Moab Municipal Code § 3.50.165, 'Plan review — commercial' section, re-verified 2026-07-19 by direct PDF text extraction: 'Nonrefundable commercial plan deposit for initial plan review only for new construction, tenant finish, and/or major remodel — 10% building permit fee; $260.00 minimum.' 'Tenant finish' is explicitly named in this fee line, making this one of the most directly-confirmed TI fees found across this batch of jurisdictions.
10% of building permit fee; $260.00 minimum
Commercial Plan Review — Additional Review(s)Moab Municipal Code § 3.50.165, 'Plan review — commercial' section — applies to tenant-improvement projects the same as new commercial construction.
$85.00/hr; 1-hour minimum charge
State Building Code Training Fund Surcharge ('State 1%')Statutory pass-through per Utah Code Title 58-56.
1% of the building permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Moab?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Department

    Required on all commercial applications, including tenant-finish projects, per the official Building Permit Application form.

  2. 2

    Rough Electrical / Plumbing / Mechanical

    As applicable to the tenant-improvement scope, before wall closure.

  3. 3

    Final Inspection

    Completed work verified before reoccupancy.

See the full Moab inspection guide — scheduling & re-inspection fees →

Tips

  • Moab is one of the few jurisdictions in this batch with an explicitly-named 'tenant finish' fee line — the 10%-of-building-permit-fee ($260 minimum) commercial plan deposit applies by name to tenant finish, not just inferred from a generic commercial category.
  • Fire Department review is required on every commercial application, including interior-only tenant-finish work with no exterior changes — budget time for this sign-off.
  • If your tenant improvement requires multiple rounds of plan corrections, additional review time beyond the initial deposit is billed at $85/hr with a 1-hour minimum.

Frequently asked questions

Moab requires a commercial tenant improvement / tenant finish permit for: Interior tenant-improvement or tenant-finish work within existing commercial space; Site plan submittal (may be marked N/A for interior-only work with no exterior changes); Fire Department review — required on all commercial applications, including tenant-finish projects; COMcheck energy code compliance documentation for any envelope, lighting, or mechanical changes. If your project isn't listed, confirm with Moab City Building Safety / Building Inspection Division (Community Development Department) at (435) 259-5129 before starting work.

Yes — Moab Municipal Code § 3.50.165 explicitly names 'tenant finish' in its commercial plan-review deposit line: a nonrefundable 10%-of-building-permit-fee deposit with a $260.00 minimum, the same deposit used for new commercial construction and major remodels. Additional plan reviews are billed at $85/hr with a 1-hour minimum.

Moab does not publish a plan-review timeline for this permit. Contact Moab City Building Safety / Building Inspection Division (Community Development Department) at (435) 259-5129 for current turnaround.

You'll need: Building Permit Application; Scope-Appropriate Plan Set. See the required-documents checklist on this page for details on each.

Moab requires 3 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Fire Department, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through Moab City Building Safety / Building Inspection Division (Community Development Department) ((435) 259-5129).

Apply through Moab City Building Safety / Building Inspection Division (Community Development Department) at 217 East Center Street, Moab, UT 84532. Phone: (435) 259-5129, email: permitting@moabcity.gov. Office hours: Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 12:00 PM. Official information: https://www.moabcity.gov/500/Building-Inspection.

Moab, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Moab City's official Building Inspection page (moabcity.gov/500/Building-Inspection) embeds a hidden 'BUILDING CODE' tab whose content is the verbatim text of an old snapshot of Utah Code § 15A-2-103 — live-inspected via DOM extraction 2026-07-16, that embedded text lists only 'Appendix J' (not C and J) and links frozen statute-version pages from 2014-2019, indicating the city's page predates even the pre-7/1/2026 code cycle, let alone the current one. The statute controls regardless of the city page's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches the (otherwise stale) statute text embedded on Moab's page.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); Moab's embedded page text instead cites 'Appendix Q of the 2021 edition of the International Residential Code' (an older statute numbering, live-inspected 2026-07-16) — reproduced verbatim as history; the current statute's Appendix AQ is added here as the operative citation.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Moab's embedded page text still shows the 2021 IPC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Moab's embedded page text still shows the 2021 IMC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Moab's embedded page text still shows the 2021 IFGC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Moab's embedded page text still shows the 2021 IEBC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Moab's embedded page text still shows the 2020 NEC — live-inspected 2026-07-16, one edition behind the statewide-mandatory floor. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law), superseding Moab's residential/commercial split. Moab's embedded page text still cites 'Residential provisions of the 2015 edition' and 'Commercial provisions of the 2021 edition' of the IECC — live-inspected 2026-07-16, preserved as history — both are now collapsed into the single current 2024 IECC. The statute controls.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not present anywhere in the statute text Moab's own page embeds (live-inspected 2026-07-16 — that embedded text predates the ISPSC's addition to § 15A-2-103 and instead references now-superseded mobile/manufactured-home provisions), added here per the current statute.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not present in the statute text Moab's own page embeds, added here per the current statute.; All per Moab City's official Building Inspection Department page (moabcity.gov/500/Building-Inspection), consistent with Utah Code § 15A-2-103 statewide code adoption.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Moab's Building Inspection page (moabcity.gov/500/Building-Inspection) was live-inspected 2026-07-16 via DOM extraction of its hidden 'BUILDING CODE' tab panel, which turns out to embed the raw text of an old snapshot of § 15A-2-103 itself (with hyperlinks to frozen statute-version pages dated 2014-2019) rather than a city-authored summary — meaning Moab's page is not merely one cycle behind but reflects a substantially older statute snapshot (pre-dating even the introduction of the residential ISPSC provision). The current statewide statute, read live at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html, controls over this stale embedded text.. Local amendments apply — see the Moab overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Moab.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.