Skip to main content
PermitBase

EV Charger / EVSE Permit in Moab, Utah

Moab does not publish a distinct EV-charger fee line item. Per the Moab Municipal Code Chapter 3.50 Master Fee Schedule, a standalone EV charger/EVSE installation is electrical work billed under the city's 'Separate mechanical, electrical, and/or plumbing permits' fee — $65.00 per inspection — rather than the valuation-based Building Permit fee, which applies to work tied to new construction.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated circuit and/or panel/service capacity to serve the charger
  • Building Permit Application submitted to the City of Moab Building Official (permitting@moabcity.gov) or via the City of Moab online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Separate mechanical, electrical, and/or plumbing permits (standalone)Moab Municipal Code, Chapter 3.50 Master Fee Schedule (current through Ordinance 23-16, passed December 12, 2023), 'Building permit (by total valuation)' section. Applies to standalone electrical work, including an EV charger circuit or panel install, not tied to a new-construction valuation-based building permit.
$65.00 per inspection
Inspections for which no fee is specifically listedMoab Municipal Code, Chapter 3.50 Master Fee Schedule — general fallback inspection fee, applicable if additional inspections beyond the standard scope are required.
$65.00 per inspection

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Moab?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Inspection of the installed circuit, panel work, and EVSE equipment; billed at $65.00 under the Separate mechanical/electrical/plumbing permits fee.

See the full Moab inspection guide — scheduling & re-inspection fees →

Tips

  • Moab has no distinct EV charger permit category — a standalone charger circuit/panel install is billed as a 'Separate mechanical, electrical, and/or plumbing permit' at $65.00 per inspection.
  • The City of Moab operates its own public EV charging infrastructure (Lions Park NEVI fast chargers, downtown Level 2 chargers), but this is a separate program from the private-property EV charger permitting process.

Frequently asked questions

Moab requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; New dedicated circuit and/or panel/service capacity to serve the charger; Building Permit Application submitted to the City of Moab Building Official (permitting@moabcity.gov) or via the City of Moab online portal. If your project isn't listed, confirm with Moab City Building Safety / Building Inspection Division (Community Development Department) at (435) 259-5129 before starting work.

No EV-specific fee is published. Per the Moab Municipal Code Chapter 3.50 Master Fee Schedule, a standalone EV charger/EVSE install is billed under the 'Separate mechanical, electrical, and/or plumbing permits' fee at $65.00 per inspection, rather than the valuation-based Building Permit fee used for new construction.

Moab does not publish a plan-review timeline for this permit. Contact Moab City Building Safety / Building Inspection Division (Community Development Department) at (435) 259-5129 for current turnaround.

You'll need: City of Moab Building Permit Application. See the required-documents checklist on this page for details on each.

Moab requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Moab City Building Safety / Building Inspection Division (Community Development Department) ((435) 259-5129).

Apply through Moab City Building Safety / Building Inspection Division (Community Development Department) at 217 East Center Street, Moab, UT 84532. Phone: (435) 259-5129, email: permitting@moabcity.gov. Office hours: Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 12:00 PM. Official information: https://www.moabcity.gov/500/Building-Inspection.

Moab, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Moab City's official Building Inspection page (moabcity.gov/500/Building-Inspection) embeds a hidden 'BUILDING CODE' tab whose content is the verbatim text of an old snapshot of Utah Code § 15A-2-103 — live-inspected via DOM extraction 2026-07-16, that embedded text lists only 'Appendix J' (not C and J) and links frozen statute-version pages from 2014-2019, indicating the city's page predates even the pre-7/1/2026 code cycle, let alone the current one. The statute controls regardless of the city page's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches the (otherwise stale) statute text embedded on Moab's page.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); Moab's embedded page text instead cites 'Appendix Q of the 2021 edition of the International Residential Code' (an older statute numbering, live-inspected 2026-07-16) — reproduced verbatim as history; the current statute's Appendix AQ is added here as the operative citation.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Moab's embedded page text still shows the 2021 IPC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Moab's embedded page text still shows the 2021 IMC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Moab's embedded page text still shows the 2021 IFGC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Moab's embedded page text still shows the 2021 IEBC — live-inspected 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Moab's embedded page text still shows the 2020 NEC — live-inspected 2026-07-16, one edition behind the statewide-mandatory floor. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law), superseding Moab's residential/commercial split. Moab's embedded page text still cites 'Residential provisions of the 2015 edition' and 'Commercial provisions of the 2021 edition' of the IECC — live-inspected 2026-07-16, preserved as history — both are now collapsed into the single current 2024 IECC. The statute controls.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not present anywhere in the statute text Moab's own page embeds (live-inspected 2026-07-16 — that embedded text predates the ISPSC's addition to § 15A-2-103 and instead references now-superseded mobile/manufactured-home provisions), added here per the current statute.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not present in the statute text Moab's own page embeds, added here per the current statute.; All per Moab City's official Building Inspection Department page (moabcity.gov/500/Building-Inspection), consistent with Utah Code § 15A-2-103 statewide code adoption.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Moab's Building Inspection page (moabcity.gov/500/Building-Inspection) was live-inspected 2026-07-16 via DOM extraction of its hidden 'BUILDING CODE' tab panel, which turns out to embed the raw text of an old snapshot of § 15A-2-103 itself (with hyperlinks to frozen statute-version pages dated 2014-2019) rather than a city-authored summary — meaning Moab's page is not merely one cycle behind but reflects a substantially older statute snapshot (pre-dating even the introduction of the residential ISPSC provision). The current statewide statute, read live at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html, controls over this stale embedded text.. Local amendments apply — see the Moab overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.