Residential Building Permit in Moab, Utah
Required for new single-family and two-family residential construction, additions, remodels, and any work regulated by the 2021 IRC and the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026) in Moab, including detached accessory dwelling units (Type 1 ADUs) built under Moab Municipal Code Chapter 17.70. Fees are valuation-based per the City's Master Fee Schedule (Moab Municipal Code § 3.50.165), most recently amended by Ordinance #2025-08 (effective June 24, 2025).
Verified 2026-07-08 · Source
When you need this permit
- New single-family or two-family residential construction, or an accessory dwelling unit (ADU) permitted under Moab Municipal Code Chapter 17.70
- Any work regulated by the 2021 IRC
- Structural modifications regulated by the current-statewide 2024 IBC and the 2021 IRC (Utah Code § 15A-2-103(1)(a)/(b))
- Site plan submittal (required per the official Building Permit Application; may be marked N/A for interior-only work)
- Utah State Contractor's License and Moab municipal business license for the general contractor and any subcontractors (electrical, plumbing, mechanical), per the official Building Permit Application form Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Department
Core building inspection and final Building Department approval sign-off, one of seven routing lines on the official Building Permit Application. Inspections scheduled by phone at (435) 259-5129; 24-hour advance notice required.
- 2
Zoning Administrator
Zoning compliance sign-off, a required routing line on the official Building Permit Application.
- 3
Engineering
Engineering review and approval sign-off, a required routing line on the official Building Permit Application.
- 4
Public Works & Utility
Public Works and Utility sign-off, a required routing line on the official Building Permit Application.
- 5
Health Department
Health Department sign-off, a required routing line on the official Building Permit Application (applicable to septic, water systems, and similar).
- 6
Fire Department
Fire Department review, marked 'REQUIRED ON ALL COMMERCIAL APPLICATIONS' on the official form; included as a routing line for residential applications as well.
- 7
Floodplain Administrator
Floodplain Administrator sign-off and comments, required when the Floodplain Status field on the application indicates the parcel is within a mapped floodplain; an Elevation Certificate field is also present on the form.
See the full Moab inspection guide — scheduling & re-inspection fees →
Tips
- Moab's Building Department is open Mon–Thu 8:00 AM–5:00 PM and Fri 8:00 AM–noon (half-day Friday, unlike Murray's full Friday hours).
- Applications can be submitted in person at 217 E Center Street, emailed to permitting@moabcity.gov, or filed online via the City's iworq portal (moab.portal.iworq.net/portalhome/moab); a separate Contractor's Portal exists at portal.iworq.net/MOAB/permits/600.
- 24-hour advance notice is required to schedule any inspection — call (435) 259-5129.
- The Master Fee Schedule's $1–$500 valuation tier fee was raised from $65 to $85 by Ordinance #2025-08 (June 24, 2025); a competing staff proposal to convert the entire small-project tier to a flat $865 'actual cost to process' fee was floated in the June 2025 hearing redline but was NOT adopted — the valuation-tiered table survives essentially intact.
- A 1% state surcharge (Utah Building Code Training Fund, Utah Code Title 58-56) is added to every building permit fee statewide, not unique to Moab — it appears as its own 'STATE 1%' line on Moab's fee routing sheet.
- Moab allows Type 1 (external/detached), Type 2, and Type 3 (internal, owner-occupied) accessory dwelling units as a permitted use in most residential zones under Municipal Code Chapter 17.70 — ADUs are permitted via this same Residential Building Permit process and valuation-based fee table; there is no separate ADU permit fee line in the Master Fee Schedule. Owner-builder
- Moab has no distinct EV charger / EVSE permit type or fee: a full-text check of the Master Fee Schedule (Ordinance ORD-CC-2025-08, moabcity.gov/DocumentCenter/View/5083, PDF fetched and searched directly 2026-07-20) found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE.' Moab also has no standalone electrical-trade permit fee line, so a residential EV charger install is expected to route through this same valuation-based Building Permit fee (plus the statewide 1% surcharge) as standard electrical work; confirm directly with the Building Department at (435) 259-5129 before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Moab
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Moab project checklist
Describe your project once and get every permit, document, and fee it triggers in Moab — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →