Residential Building Permit in Unincorporated Piute County, Utah

Required for new residential construction, additions, alterations, and any structural modification in unincorporated Piute County. The Piute County Building Inspector's office administers building permits under Piute County Code Title 7, Chapter 7-1D (Ord. 10-286, adopted January 31, 2011), which requires 'any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure ... shall first make application to the building official and obtain the required permit.'

Reviewed 2026-07-08 · Source

When you need this permit

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Any structural modification, alteration, repair, or change of occupancy
  • Moving or demolishing a structure
  • Installation, enlargement, alteration, repair, removal, conversion, or replacement of any electrical, gas, mechanical, or plumbing system regulated under Piute County Code Title 7

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan reviewUnincorporated Piute County’s published plan-review target
14–21 business days

How long did your Residential Building Permit permit actually take in Unincorporated Piute County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Piute County has not published a fee schedule, application form, or adopted local amendments online — the county's 'Building Ordinance,' 'Printable Forms,' and 'Pre 1976 Manufactured Housing' subpages on piute.gov are all unpopulated template placeholder text as of 2026-07-08. Contact the Building Inspector's office directly at (435) 577-2840 for current forms and fees.
    • Violation of the building-permit requirement is a Class B Misdemeanor under Piute County Code, punishable by up to a $1,000 fine (Utah Code § 76-3-301) or 6 months in jail (Utah Code § 76-3-204(2)), with each day of violation treated as a separate offense.
    • Piute County is reported by outside legal research (BYU Law Library guide to Utah county codes online, checked 2026-07-08) as the only Utah county with no ordinances published on a code-hosting platform (e.g., American Legal Publishing / Sterling Codifiers) — the full text of Title 7 is not publicly available online; only the permit-requirement citation is quoted on the county's own site.
    • Under Utah Code § 17-79-810(4)(a) (effective 11/6/2025), for a one- or two-family dwelling or townhome, the county must complete plan review within 14 business days after the 3-business-day application-completeness screening period ends — giving an effective statutory floor of roughly 14-21 business days total, absent a county-published faster SLA.
    • Solar PV installations would fall under this same general Building Permit — the county's Obtaining a Building Permit page lists 'electrical, gas, mechanical, or plumbing system work' among the categories requiring a permit, but Piute County has published no solar-specific fee, form, or process online (consistent with the broader lack of a published fee schedule for any permit type in this county as of 2026-07-19).
    • EV charger / EVSE installation would fall under this same general Building Permit — Piute County's Obtaining a Building Permit page (re-checked 2026-07-20) lists 'electrical, gas, mechanical, or plumbing system work' among the categories requiring a permit, but Piute County has published no EV-specific fee, form, or process online, consistent with the county's broader lack of any published dollar-amount fee schedule for any permit type.
    • RE-CHASED 2026-07-23, still no fee/form found: the Building Inspector's 'Printable Forms' and 'Building Ordinance' subpages were re-verified live at their current URLs (piute.gov silently renamed the page slugs since the last check, e.g. the old '/printable-forms/' path now 404s and redirects visitors through a 'rename-04' slug) — content is unchanged, still unpopulated Hipster-Ipsum placeholder text. New statutory root cause found: Utah Code § 17-53-211 requires every county commission to adopt an ordinance establishing a consolidated fee schedule (confirmed via a parallel Grand County ordinance's recital quoting the statute), which is the state-law hook behind the Commission-resolution requirement already documented in this file's Certificate-of-Occupancy and Sign Permit entries — but no such ordinance or resulting dollar figure was found published for Piute County after a Utah Public Notice Website (utah.gov/pmn) search, a piute.gov site search for 'fee' (surfaced only property-tax payment fees), a direct check of the county's own 'Budget' page (general-fund boilerplate only, no attached fee-schedule PDF), and direct checks of Municode/American Legal/Sterling Codifiers (Piute County not hosted on any). Contact the Building Inspector's office directly at (435) 577-2840 for current forms and fees.

    Frequently asked questions

    Unincorporated Piute County requires a residential building permit for: New single-family dwelling construction; Additions to existing residential structures; Any structural modification, alteration, repair, or change of occupancy; Moving or demolishing a structure; Installation, enlargement, alteration, repair, removal, conversion, or replacement of any electrical, gas, mechanical, or plumbing system regulated under Piute County Code Title 7. If your project isn't listed, confirm with Piute County Building Inspector at (435) 577-2840 before starting work.

    Piute County has not published its own review-timeline SLA. Under the statutory floor at Utah Code § 17-79-810(4)(a) (effective 11/6/2025), the county must complete plan review of a one- or two-family dwelling or townhome application within 14 business days after the 3-business-day completeness-screening period ends.

    You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

    Apply through Piute County Building Inspector at 550 N Main, Junction, UT 84740. Phone: (435) 577-2840. Official information: https://piute.gov/your-government/county-departments/building-inspector/.

    Unincorporated Piute County, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective since July 1, 2026, superseding the 2021 IBC; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update, remains in force; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective since July 1, 2026, superseding the 2021 IPC; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective since July 1, 2026, superseding the 2021 IMC; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective since July 1, 2026, superseding the 2021 IFGC; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective since July 1, 2026, superseding the 2021 IEBC; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); effective since July 1, 2026, superseding the 2021 ISPSC; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 update; NOTE (updated 2026-07-16): These are the statewide-mandated codes under Utah Code § 15A-2-103; Piute County has not published any county-specific code amendments online (live-checked again 2026-07-16 — the county's 'Obtaining a Building Permit' page still cites no code editions at all, consistent with the prior 2026-07-08 finding). The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026, superseded 1/1/2027) took effect 15 days ago; the next statute version's editions were diffed and confirmed identical. 2021 IRC and 2023 NEC are unchanged. The International Fire Code is NOT adopted by § 15A-2-103 (it lives in Title 15A Chapter 5) and is not referenced elsewhere in this file.. Local amendments apply — see the Unincorporated Piute County overview page for the full list.

    Yes. Piute County lists a standing 'Building Inspector' department (550 N Main, Junction, UT 84740, (435) 577-2840) distinct from Building & Grounds (facilities) and Planning & Zoning. Piute County Code Title 7, Chapter 7-1D (Ord. 10-286, adopted January 31, 2011) requires a building permit for construction, alteration, or change of occupancy of any building or structure.

    Piute County has not published a fee schedule online. Contact the Building Inspector's office directly at (435) 577-2840 for current fees.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-07-08.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Piute County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.