Required in Midvale prior to installation or modification of any new signage. Submitted as a building permit application per the city's Sign Permit Procedure; fees are based on the valuation of the proposed sign, per Resolution 2/26/02C, applying the city's own Building Permit Fees valuation table published in the Municipal Fee Schedule.

Verified 2026-07-20 · Source

When you need this permit

  • Installation or modification of any new signage
  • Allowable sign types, areas, heights, and setbacks are governed by the applicable sign ordinance for the property's zoning district in the Midvale City Zoning Ordinance
  • An inspection is required after the sign is installed

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit FeeRe-chased 2026-07-20: Midvale's FY2026 Approved Municipal Fee Schedule (cms1files.revize.com/midvale/Document%20Center/Government/Departments/Administrative%20Services/Finance/2026/Midvale%20City%20Municipal%20Fee%20Schedule%20FY%202026%20updated.pdf), Community Development Fees section, lists 'Sign Permit ... Based on Sign Value Per Resolution 2/26/02C' — i.e., a specific city resolution (Feb 26, 2002, Exhibit/Item C) governs the valuation-based calculation. The same fee-schedule document's Building Permit Fees table (page 1) is: $0-$100,000 valuation uses a base Building Permit Fee tier; $100,001-$125,000: $48 + $9.30 per additional $1,000; $125,001-$150,000: $978 for first $100,000 + $14 per additional $1,000; $150,001-$200,000: $1,328 for first $125,000 + $10.10 per additional $1,000; $200,001-$600,000: $1,580 for first $150,000 + $7 per additional $1,000; $600,001-$1,100,000: $1,930 for first $200,000 + $5.60 per additional $1,000; over $1,100,001: $6,545 for first $1,100,000 + $3.65 per additional $1,000. This is the table Resolution 2/26/02C applies to sign valuation.
Based on Sign Value Per Resolution 2/26/02C — uses the same Building Permit Fees valuation table published in the city's own Municipal Fee Schedule

Review timeline

Plan reviewTypical estimate — confirm current times with the Midvale building department
~5–14 business days

How long did your Sign Permit permit actually take in Midvale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Installation Inspection

    Required after the sign is installed; schedule via midvale.utah.gov (Building & Safety webpage)

See the full Midvale inspection guide — scheduling & re-inspection fees →

Tips

  • Sign permits are valid for six (6) months from the date of issuance — any sign not installed within six months requires a new sign permit, and permit fees for expired permits are not refundable.
  • Incomplete applications will not be accepted — examples of elevation plans, construction drawings, and site plans may be inspected in the Planning & Zoning office before you submit.
  • Allowable sign area, height, and setbacks vary by zoning district — check the Midvale City Zoning Ordinance and zoning map for the specific property before designing the sign.
  • No flat sign-permit fee is published; the city invoices based on sign valuation after the application is approved (per Resolution 2/26/02C, applying the city's own Building Permit Fees valuation table), so budget for that step before ordering signage.

Frequently asked questions

Yes. A sign permit is required prior to installation or modification of any new signage in Midvale, submitted as a building permit application. Fees are based on the valuation of the proposed sign and invoiced after approval.

In Midvale, the published Sign Permit Fee is: Based on Sign Value Per Resolution 2/26/02C — uses the same Building Permit Fees valuation table published in the city's own Municipal Fee Schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a sign permit in Midvale typically runs 5–14 business days. This is an estimate, not a published figure — confirm current review times with Midvale City Community Development — Building & Safety Division at (801) 567-7200 ext. 1016.

You'll need: Sign Permit Application Form; Sign Elevation Plans; Construction Drawings; Site Plan. See the required-documents checklist on this page for details on each.

Midvale requires 1 inspection(s) for a sign permit, in order: Sign Installation Inspection. Schedule each through Midvale City Community Development — Building & Safety Division ((801) 567-7200 ext. 1016).

Apply through Midvale City Community Development — Building & Safety Division at 7505 S Holden Street, 2nd Floor, Midvale, UT 84047. Phone: (801) 567-7200 ext. 1016, email: buildingpermit@midvaleut.gov. Office hours: Mon–Thu 8:00 AM – 6:00 PM; closed Friday–Sunday. Official information: https://www.midvale.utah.gov/government/departments/community_development/building___safety.php.

Midvale, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026.; 2024 International Energy Conservation Code (IECC), covering both commercial and residential provisions in a single edition — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026.; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Midvale's own published sources, but applies statewide.; Midvale City is a compliance agency under Utah Code § 15A-1-202 and enforces these statewide codes through its own Building & Safety Division, per the Midvale Building & Safety FAQ (midvale.utah.gov), which references ICC standards, DOPL requirements, and Statewide Amendments to the State Construction Code.. Local amendments apply — see the Midvale overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Midvale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.