Commercial Building Permit — Midvale, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://cms1files.revize.com/midvale/Document%20Center/Government/Departments/Administrative%20Services/Finance/2026/Midvale%20City%20Municipal%20Fee%20Schedule%20FY%202026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Midvale, Utah
Required for new commercial building construction in Midvale, valuation-based per the FY2026 Approved Fee Schedule (Ordinance 2026-O-14, adopted May 20, 2026), using the same Building Permit Fees table applied to all building permits. A pre-construction meeting is required on all new commercial buildings, per the city's Building & Safety page.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction
- Building Permit Application submitted online via forms.midvaleut.gov (document uploads limited to 4 MB each; larger files emailed to Building & Safety)
- Pre-construction meeting required on all new commercial buildings
- Commercial Construction Completion Checklist signed off before occupancy
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour, per standard IBC inspection sequence.
- 2
Framing
After framing, sheathing, and roof installed.
- 3
Final
All work complete before occupancy; requires the signed Commercial Construction Completion Checklist.
See the full Midvale inspection guide — scheduling & re-inspection fees →
Tips
- A pre-construction meeting is required on all new commercial buildings in Midvale (and may be required for some remodels).
- Midvale bills Electrical, Mechanical, and Plumbing each at 5% of the Building Permit Fee when included with the building permit, plus a 1% state surcharge on the combined total.
- A Pre-Plan Check Fee (credited toward the building permit fee) applies above $100,000 in valuation and becomes non-refundable once plan review begins.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Midvale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Midvale.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Midvale
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Midvale project checklist
Describe your project once and get every permit, document, and fee it triggers in Midvale — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →