EV Charger / EVSE Permit — Midvale, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://cms1files.revize.com/midvale/Document%20Center/Government/Departments/Administrative%20Services/Finance/2026/Midvale%20City%20Municipal%20Fee%20Schedule%20FY%202026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Midvale, Utah
Midvale does not publish a distinct EV-charger fee line item. Per the Midvale City FY2026 Approved Fee Schedule, installing an EV charger (EVSE) is electrical work billed under the city's general Electrical Permit — as a standalone Service Charge (over-the-counter permit) or, if tied to a new building permit, at 5% of the Building Permit Fee.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated circuit and/or panel/service capacity to serve the charger
- Compliance with the 2023 NEC, adopted statewide by Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Midvale inspection guide — scheduling & re-inspection fees →
Tips
- Midvale does not have a distinct EV charger permit category — a standalone charger install is billed as the $47 + $0.47 surcharge Service Charge over-the-counter permit.
- All electrical work must comply with the 2023 National Electrical Code (NEC) adopted statewide per Utah Code § 15A-2-103(1)(g).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Midvale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Midvale
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →