Electrical Permit in Midvale, Utah

Required for standalone electrical work in Midvale not covered under a residential building permit, including electrical service charges and panel work billed as an over-the-counter permit. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Midvale FY2026 Fee Schedule does not publish an EV-specific line item, so a charger install is billed under the standard Service Charge (over-the-counter) or Electrical Fee category depending on scope.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical service upgrades or panel changes (standalone, over-the-counter)
  • New electrical circuits or wiring not part of a new-construction building permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Fee (part of a new building permit)Midvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Electrical Fee — 5% of Building Fee.'
5% of the Building Permit Fee
Service Charge (over-the-counter permit)Midvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'Service Charge — $47 electrical fee + 0.47 surcharge.'
$47 electrical fee + $0.47 surcharge

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Midvale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Midvale inspection guide — scheduling & re-inspection fees →

    Tips

    • Service-charge electrical work (panel/service changes) is billed as an over-the-counter permit at $47 + $0.47 surcharge, separate from full building-permit-based electrical fees.
    • All electrical work must comply with the 2023 National Electrical Code (NEC) adopted statewide per Utah Code § 15A-2-103(1)(g).
    • EV charger (EVSE) installation is not a separate permit category in Midvale — a standalone panel/circuit install for a charger is billed as the $47 + $0.47 surcharge Service Charge over-the-counter permit.

    Frequently asked questions

    Midvale requires an electrical permit for: Electrical service upgrades or panel changes (standalone, over-the-counter); New electrical circuits or wiring not part of a new-construction building permit. If your project isn't listed, confirm with Midvale City Community Development — Building & Safety Division at (801) 567-7200 ext. 1016 before starting work.

    Per the Midvale FY2026 Fee Schedule's Over the Counter Permit Fees table, a Service Charge permit costs $47 (electrical fee) plus a $0.47 surcharge.

    Midvale does not publish a plan-review timeline for this permit. Contact Midvale City Community Development — Building & Safety Division at (801) 567-7200 ext. 1016 for current turnaround.

    You'll need: Building Permit Application (online). Depending on your project, Midvale may also ask for: Contractor Verification Form. See the required-documents checklist on this page for details on each.

    Apply through Midvale City Community Development — Building & Safety Division at 7505 S Holden Street, 2nd Floor, Midvale, UT 84047. Phone: (801) 567-7200 ext. 1016, email: buildingpermit@midvaleut.gov. Office hours: Mon–Thu 8:00 AM – 6:00 PM; closed Friday–Sunday. Official information: https://www.midvale.utah.gov/government/departments/community_development/building___safety.php.

    Midvale, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026.; 2024 International Energy Conservation Code (IECC), covering both commercial and residential provisions in a single edition — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026.; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Midvale's own published sources, but applies statewide.; Midvale City is a compliance agency under Utah Code § 15A-1-202 and enforces these statewide codes through its own Building & Safety Division, per the Midvale Building & Safety FAQ (midvale.utah.gov), which references ICC standards, DOPL requirements, and Statewide Amendments to the State Construction Code.. Local amendments apply — see the Midvale overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Midvale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.