Temporary Structure & Event Permit in Lehi, Utah
Required for temporary tents, stages, bleachers, and structures used for events or construction in Lehi.
Verified 2026-06-27 · Source
When you need this permit
- Tents or canopies over 400 sq ft
- Temporary stages or platforms
- Bleachers or grandstands
- Construction trailers and temporary offices
- Seasonal sales structures (fireworks stands, Christmas tree lots)
Required documents
- Req
Temporary Structure Application
Structure type, size, duration, and location
- Req
Site Plan
Structure placement, exits, fire lanes, and parking
- Req
Fire Safety Plan
Fire extinguishers, exit signage, and flame-retardant certification for tents
- Opt
Event Permit
Required for public events — separate from structure permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Temporary Structure Permit | $50-$200 | — |
| Event Permit | $50-$300 (separate, if public event) | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the Lehi building department
Inspection process
- 1
Setup Inspection
Structure erected, anchored, exits clear, fire extinguishers in place
- 2
Removal Verification
Structure removed by permit expiration date, site restored
Tips
- Tents over 400 sq ft in Lehi require a permit and flame-retardant certification.
- Temporary structures in Lehi are typically limited to 180 days — extensions may be available.
- Construction dumpsters and pods in the public right-of-way may require a separate encroachment permit.
- Public events with temporary structures require both a building permit and an event permit from Lehi.
Frequently asked questions
- Do I need a permit for a tent in Lehi?
- Yes, for tents over 400 sq ft. Lehi requires a temporary structure permit that covers fire safety, anchoring, and exit requirements. Smaller tents for personal use typically do not need a permit.
- How long can a temporary structure stay up in Lehi?
- Temporary structure permits in Lehi are typically valid for up to 180 days. The structure must be removed by the permit expiration date. Extensions may be available with a new application.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Lehi City Building and Inspections — official building department
- Lehi City Code 10-2-2 — Building Permit & Plan Review Fees
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lehi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lehi
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.