Provo building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Provo, Utah.
Verified 2026-06-29 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 445 W Center Street, Suite 200, Provo, UT 84601
- Phone
- (801) 852-6428
- building@provo.gov
- Office hours
- Mon–Thu 7:00 AM – 6:00 PM (building permits issued until 5:30 PM); closed Fridays
- Website
- Official site
Published scheduling rules
- Provo City offices are Mon–Thu only (7 AM–6 PM) — closed Fridays. Plan accordingly for permit submittals and inspection scheduling. (Residential Building Permit)
- Apply online at provo.org/portal. Inspections are scheduled at provo.gov/1019/Schedule-Building-Inspection. (Residential Building Permit)
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Before concrete pour — footings, forms, rebar.
- 2
Framing
Framing, fire separation, and egress window verification.
- 3
Insulation
After insulation installed, before drywall.
- 4
Final / Certificate of Occupancy
All work complete, egress windows verified, smoke detectors in every bedroom and on every floor, certificate of occupancy issued.
Applies to: Basement Finish Permit
- 1
Framing
Wall framing, fire blocking, egress window openings and well depths.
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed.
- 3
Insulation
Insulation on exterior walls, vapor barrier placement.
- 4
Final
Drywall, fixtures, smoke detectors in every bedroom and on every floor, all finishes complete. Combustion air to appliances verified per Provo final inspection checklist (Doc 833).
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Before concrete pour — forms, rebar, anchor bolts, and hold-down locations verified.
- 2
Framing
After framing, sheathing, and roof installed — before insulation or wall cover.
- 3
Rough Electrical / Mechanical / Plumbing
Conduit, ductwork, and piping rough-in verified before walls are closed.
- 4
Final / Certificate of Occupancy
All work complete, fire and health department approvals obtained where applicable, before occupancy.
Applies to: Fire Sprinkler System Permit
- 1
Underground Flush
Underground piping flush test before backfill or concealment.
- 2
Hydrostatic / Rough Test
Hydrostatic pressure testing of above-ground piping before concealment.
- 3
Acceptance Testing
Formal acceptance of the completed system by the Fire Marshal's Office; contractors should have the installation permit number available when scheduling. First 2 tests included in the acceptance-testing fee.
- 4
Final / Certificate of Occupancy Coordination
No Certificate of Occupancy will be scheduled until all required fire permits and acceptance testing are complete, per Provo's Contractor's Corner guidance.
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — forms, rebar, anchor bolts, and hold-down locations verified.
- 2
Framing
After framing, sheathing, and roof installed — before insulation or wall cover. Includes MEP rough-in verification.
- 3
Insulation
After insulation installed, before drywall. Includes insulation certification card which must be installed in the attic, visible through the access opening.
- 4
Final / Certificate of Occupancy
All work complete per the Residential Occupancy Final Inspection Checklist (Doc 833): smoke detectors in each bedroom and on each floor; GFCI protection at exterior, bathrooms, kitchen counter, garage, and unfinished basement outlets; seismic strapping on water heater; bedroom egress windows of adequate size and openable; combustion air to appliances; safety glazing; garage fire separation complete.
Applies to: Deck Permit
- 1
Footings
Verify footing depth (below frost line — 30 inches in Provo per Design Criteria), diameter, and rebar before concrete pour.
- 2
Framing
Posts, beams, joists, ledger connection, and hardware.
- 3
Final
Decking, stairs, guards, and railings complete — guards required when deck surface is 30 inches or more above grade.
Applies to: Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support.
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors.
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled, circuits identified.
Applies to: Plumbing Permit
- 1
Underground / Slab
Before concrete pour — verify pipe slope, materials, and cleanouts.
- 2
Rough-In
After pipes installed, before walls closed — pressure test required.
- 3
Final
All fixtures connected, water flowing, no leaks, proper venting. Water pressure below 80 psi, water closets maximum 1.6 gpf per Provo final inspection checklist (Doc 833). Water heater P&T relief valve drain and seismic anchorage required.
Applies to: Change of Use / Certificate of Occupancy and Zoning Compliance
- 1
Zoning Compliance Review
The Planning Commission reviews the use/occupancy information submitted under § 14.01.090(3) — employee count, parking, restroom facilities, and occupancy square footage for commercial/industrial/institutional uses — before issuing a new Certificate of Occupancy and Zoning Compliance.
- 2
Final / Certificate of Occupancy and Zoning Compliance Issuance
A new Certificate must be issued before the space may be occupied under its new use; if construction accompanied the change of use, this is coordinated with the Building Division's final inspection on the underlying building or tenant-improvement permit.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough Electrical / Mechanical / Plumbing
Interior rough-in for tenant space verified before walls/ceiling are closed.
- 2
Final / Certificate of Occupancy
All finish work complete, fire sprinkler and Fire Marshal approvals confirmed where applicable, before occupancy.
Applies to: Demolition Permit
- 1
Pre-Demolition
Verify utility disconnects are complete and any required asbestos clearance is obtained before work begins.
- 2
Final / Site Clear
Site cleared, foundation removed or capped, site conditions verified.
Applies to: Fire Alarm System Permit
- 1
Acceptance Testing
Formal acceptance testing of the completed alarm system by the Fire Marshal's Office; first two tests included in the acceptance-testing fee. Per Orem-style Fire Marshal practice referenced elsewhere in this dataset, the fire alarm final is often coordinated with the sprinkler final where both systems are present — not separately documented for Provo but noted here as a scheduling consideration.
- 2
Final / Certificate of Occupancy Coordination
No Certificate of Occupancy will be scheduled until all required fire permits and acceptance testing are complete, per Provo's Contractor's Corner guidance.
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support.
- 2
Final
Equipment operational, combustion air verified per Provo final inspection checklist (Doc 833), gas pressure tested, thermostat functional.
Applies to: Roofing Permit
- 1
Deck / Substrate
After tear-off — verify sheathing condition and replace damaged decking before proceeding.
- 2
Final
Completed roof — verify ice and water shield, flashing, drip edge, nailing pattern, and ventilation.
Applies to: Sign Permit
- 1
Footing / Foundation (freestanding signs)
Before concrete pour on pole or monument sign foundations.
- 2
Final
Completed sign matches approved plans — dimensions, placement, and attachment verified.
Applies to: Solar Panel Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing.
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, electrical connections, and 3-foot fire department access pathways verified.
Final inspection only: EV Charger / EVSE Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Provo building permits
Get alerts for Provo
We'll email you when Provo's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.