Skip to main content
PermitBase

Deck Permit in Provo, Utah

Required for new deck construction, replacement, or structural modifications to existing decks in Provo. Fees are valuation-based per the 1997 UBC table.

Verified 2026-07-01 · Source

When you need this permit

  • New deck construction attached to or detached from the house
  • Decks more than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Deck Permit Fee (building permit, valuation-based)Provo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-15 passed May 26, 2026; confirmed live 2026-07-01), Inspection Fees: building permit 'Based on the 1997 UBC Fee Chart,' Building Valuation 'Based upon International Code Council Building Valuation Data'; 'Plan review — 65% of the Building Permit Fee.' Fee schedule was checked directly and contains no distinct 'Deck' line item — decks are confirmed permitted and charged solely as a valuation-based building permit, which is a grounded fee.
Charged as a building permit per the 1997 UBC Fee Chart (no separate deck line item in the fee schedule). Plan review 65% of the building permit fee.

Review timeline

Plan reviewTypical estimate — confirm current times with the Provo building department
~5–14 business days

How long did your Deck Permit permit actually take in Provo?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Verify footing depth (below frost line — 30 inches in Provo per Design Criteria), diameter, and rebar before concrete pour.

  2. 2

    Framing

    Posts, beams, joists, ledger connection, and hardware.

  3. 3

    Final

    Decking, stairs, guards, and railings complete — guards required when deck surface is 30 inches or more above grade.

See the full Provo inspection guide — scheduling & re-inspection fees →

Tips

  • Deck footings in Provo must extend below the 30-inch frost line per Provo Design Criteria (provo.gov/800/Design-Criteria).
  • Deck guards are required when the deck surface is 30 inches or more above grade per the adopted IRC.
  • Ledger boards must be positively attached with lag screws or through-bolts — nails are not allowed per IRC.

Frequently asked questions

Yes, in most cases. Provo requires a permit for decks over 30 inches above grade and any deck attached to the house. Apply via provo.org/portal and contact Building Division at (801) 852-6428.

In Provo, the published Deck Permit Fee (building permit, valuation-based) is: Charged as a building permit per the 1997 UBC Fee Chart (no separate deck line item in the fee schedule). Plan review 65% of the building permit fee.. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a deck permit in Provo typically runs 5–14 business days. This is an estimate, not a published figure — confirm current review times with Provo City Development Services — Building Division at (801) 852-6428.

You'll need: Permit Application and Plans. Depending on your project, Provo may also ask for: Ledger Detail. See the required-documents checklist on this page for details on each.

Provo requires 3 inspection(s) for a deck permit, in order: Footings, Framing, Final. Schedule each through Provo City Development Services — Building Division ((801) 852-6428).

Apply through Provo City Development Services — Building Division at 445 W Center Street, Suite 200, Provo, UT 84601. Phone: (801) 852-6428, email: building@provo.gov. Office hours: Mon–Thu 7:00 AM – 6:00 PM (building permits issued until 5:30 PM); closed Fridays. Official information: https://www.provo.gov/200/Building.

Provo, Utah has adopted: 2024 International Building Code (IBC) — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); Provo's own Building FAQ still lists 2021 IBC as of 2026-07-16 — see NOTE below.; 2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)).; 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)).; 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)).; 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)).; 2021 International Fire Code (IFC) — per Provo City Building FAQ (provo.gov/Faq.aspx?QID=88) listing codes adopted as of July 1, 2021 (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period beyond this FAQ citation).; 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); superseding the 2021 IECC (commercial and residential editions) that Provo's Building FAQ had cited and that was in effect through June 30, 2026.; 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)).; 2023 National Electrical Code (NEC) — currently in effect (Utah Code § 15A-2-103(1)(g)); unchanged by the July 1, 2026 statewide code-edition update. NOTE: Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88) still listed 'National Electric Code 2020 Edition' as of 2026-07-16 (re-confirmed live) — this is STALE and always has been, independent of the 7/1/2026 transition; the statewide statute mandates the 2023 NEC, which supersedes the city FAQ.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)).; NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88), re-fetched live 2026-07-16, still lists every code at its pre-transition July 1, 2021 edition (2021 IBC/IMC/IPC/IFGC/IRC/IFC, 2021 commercial and residential IECC, plus the already-stale 2020 NEC) — the city FAQ has not been updated to reflect either the 2023 NEC statewide mandate or the 7/1/2026 edition change; the state statute governs regardless.. Local amendments apply — see the Provo overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.