Electrical Permit in Provo, Utah
Required for electrical work in Provo. For residential structures with four or fewer dwelling units, electrical is included in the building permit fee — a separate electrical permit is not required when pulled alongside a building permit for those structures. Standalone electrical permits (e.g., panel upgrades, service changes) require a separate permit with valuation-based fees per the 1997 UBC table. Provo does not publish a document naming EV charger/EVSE installation as a covered scope explicitly — this classification is PermitBase's own inference that an EV charger circuit is electrical work and would fall under this general Electrical Permit like any other standalone circuit addition, not a documented city line item. The city's Consolidated Fee Schedule publishes no separate EV-specific fee — the standard $75.00 residential electrical inspection fee would apply if this classification holds.
Reviewed 2026-07-20 · Source
When you need this permit
- New electrical circuits or wiring installations (standalone, not part of a building permit for ≤4-unit residential)
- Electrical panel upgrades or service entrance changes
- EV charger circuit installation on existing structure (PermitBase inference — not an explicitly documented city line item; see description)
- Solar PV electrical connections
- Generator connections
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support.
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors.
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled, circuits identified.
See the full Provo inspection guide — scheduling & re-inspection fees →
Tips
- For residential structures with four or fewer units, electrical is included in the building permit — do not pay a separate electrical permit when pulling a residential building permit.
- All electrical work in Provo must comply with the 2023 National Electrical Code (NEC) as adopted by Utah Code § 15A-2-103(1)(g).
- Utah allows homeowners to perform electrical work on their own primary residence — a permit and inspection are still required.
- Provo City Power is the electric utility for Provo — not Rocky Mountain Power. For solar and net metering, contact Provo City Power.
- Installing a Level 2 EV charger (240V circuit) on an existing home likely requires this standalone Electrical Permit as ordinary electrical work — Provo does not publish a document confirming this explicitly, and does not publish a separate EV-specific permit or fee; budget the standard $75.00 residential electrical inspection fee if this classification holds, and confirm with the city before relying on it.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Provo
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Provo project checklist
Describe your project once and get every permit, document, and fee it triggers in Provo — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →