Demolition Permit in Provo, Utah

Required for partial or complete demolition of structures in Provo. Federal NESHAP requirements apply for pre-1980 structures. Utah DEQ Air Quality must be contacted prior to any demolition (asbestos removal).

Verified 2026-06-29 · Source

When you need this permit

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Structures built before approximately 1980 require NESHAP asbestos inspection

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeeProvo City Consolidated Fee Schedule (provo.municipal.codes/Code/CFS, current through Ordinance 2026-13 passed April 28, 2026), Development Fees: 'Demolition Permit $100.00.' (Relocation of a Building is likewise $100.00.)
$100.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Provo building department
~3–10 business days

How long did your Demolition Permit permit actually take in Provo?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Demolition

    Verify utility disconnects are complete and any required asbestos clearance is obtained before work begins.

  2. 2

    Final / Site Clear

    Site cleared, foundation removed or capped, site conditions verified.

See the full Provo inspection guide — scheduling & re-inspection fees →

Tips

  • Prior to demolishing any structure, contact the Utah Division of Air Quality at (801) 535-4000 or airquality.utah.gov for asbestos removal requirements — this is required per Provo's own remodel checklist.
  • Utilities must be formally disconnected by the respective utility companies before demolition begins.
  • Provo's electric utility is Provo City Power — coordinate electric disconnect with them.

Frequently asked questions

Yes. Provo requires a demolition permit for all complete and partial structural demolitions. The demolition permit fee is $100.00 per Provo's Consolidated Fee Schedule. Contact the Utah Division of Air Quality before demolishing any structure that may contain asbestos. Building Division: (801) 852-6428.

In Provo, the published Demolition Permit Fee is: $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a demolition permit in Provo typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with Provo City Development Services — Building Division at (801) 852-6428.

You'll need: Demolition Application; Utility Disconnect Confirmation. Depending on your project, Provo may also ask for: Asbestos / NESHAP Documentation. See the required-documents checklist on this page for details on each.

Provo requires 2 inspection(s) for a demolition permit, in order: Pre-Demolition, Final / Site Clear. Schedule each through Provo City Development Services — Building Division ((801) 852-6428).

Apply through Provo City Development Services — Building Division at 445 W Center Street, Suite 200, Provo, UT 84601. Phone: (801) 852-6428, email: building@provo.gov. Office hours: Mon–Thu 7:00 AM – 6:00 PM (building permits issued until 5:30 PM); closed Fridays. Official information: https://www.provo.gov/200/Building.

Provo, Utah has adopted: 2024 International Building Code (IBC) — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); Provo's own Building FAQ still lists 2021 IBC as of 2026-07-16 — see NOTE below.; 2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)).; 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)).; 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)).; 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)).; 2021 International Fire Code (IFC) — per Provo City Building FAQ (provo.gov/Faq.aspx?QID=88) listing codes adopted as of July 1, 2021 (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period beyond this FAQ citation).; 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); superseding the 2021 IECC (commercial and residential editions) that Provo's Building FAQ had cited and that was in effect through June 30, 2026.; 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)).; 2023 National Electrical Code (NEC) — currently in effect (Utah Code § 15A-2-103(1)(g)); unchanged by the July 1, 2026 statewide code-edition update. NOTE: Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88) still listed 'National Electric Code 2020 Edition' as of 2026-07-16 (re-confirmed live) — this is STALE and always has been, independent of the 7/1/2026 transition; the statewide statute mandates the 2023 NEC, which supersedes the city FAQ.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)).; NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88), re-fetched live 2026-07-16, still lists every code at its pre-transition July 1, 2021 edition (2021 IBC/IMC/IPC/IFGC/IRC/IFC, 2021 commercial and residential IECC, plus the already-stale 2020 NEC) — the city FAQ has not been updated to reflect either the 2023 NEC statewide mandate or the 7/1/2026 edition change; the state statute governs regardless.. Local amendments apply — see the Provo overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.