Basement Finish Permit — Provo, Utah · Requirements sheet
Verified 2026-07-01 · Source: https://provo.municipal.codes/Code/CFS
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Basement Finish Permit in Provo, Utah
Required for finishing or remodeling an unfinished basement in Provo, including framing, electrical, plumbing, and mechanical work.
Verified 2026-07-01 · Source
When you need this permit
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window)
- Adding a bathroom or wet bar (requires plumbing permit if standalone)
- Electrical wiring for new rooms
- Structural modifications
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing
Wall framing, fire blocking, egress window openings and well depths.
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed.
- 3
Insulation
Insulation on exterior walls, vapor barrier placement.
- 4
Final
Drywall, fixtures, smoke detectors in every bedroom and on every floor, all finishes complete. Combustion air to appliances verified per Provo final inspection checklist (Doc 833).
See the full Provo inspection guide — scheduling & re-inspection fees →
Tips
- Every basement bedroom requires an egress window — minimum 5.7 sq ft net clear opening, sill height no more than 44 inches above the floor per Provo final inspection checklist (Doc 833) and the adopted IRC.
- Window wells deeper than 44 inches require a permanently attached ladder or steps.
- The furnace/water heater room needs combustion air — do not fully enclose it without an air supply.
- Smoke detectors must be installed in every bedroom, outside sleeping areas, and on every level of the home.
- One-half inch gypboard must be installed under all stairs if accessible, per Provo final inspection checklist.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Provo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Provo
Basement Finish Permit in other cities
Compare basement finish permit fees across Utah →
Look up this fee in a different city →