Skip to main content
PermitBase

Provo building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Provo, Utah.

Last verified 2026-06-29 · Source · Embed this page’s badge · Version history

Building department

Address
445 W Center Street, Suite 200, Provo, UT 84601
Phone
(801) 852-6428
Office hours
Mon–Thu 7:00 AM – 6:00 PM (building permits issued until 5:30 PM); closed Fridays

Inspection guide

See how inspections work in Provo — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); Provo's own Building FAQ still lists 2021 IBC as of 2026-07-16 — see NOTE below.
  • 2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)).
  • 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)).
  • 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)).
  • 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)).
  • 2021 International Fire Code (IFC) — per Provo City Building FAQ (provo.gov/Faq.aspx?QID=88) listing codes adopted as of July 1, 2021 (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period beyond this FAQ citation).
  • 2024 International Energy Conservation Code (IECC) — currently in effect statewide as of July 1, 2026, a single edition with no residential/commercial split under current law (Utah Code § 15A-2-103(1)(h)); superseding the 2021 IECC (commercial and residential editions) that Provo's Building FAQ had cited and that was in effect through June 30, 2026.
  • 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)).
  • 2023 National Electrical Code (NEC) — currently in effect (Utah Code § 15A-2-103(1)(g)); unchanged by the July 1, 2026 statewide code-edition update. NOTE: Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88) still listed 'National Electric Code 2020 Edition' as of 2026-07-16 (re-confirmed live) — this is STALE and always has been, independent of the 7/1/2026 transition; the statewide statute mandates the 2023 NEC, which supersedes the city FAQ.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)).
  • NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88), re-fetched live 2026-07-16, still lists every code at its pre-transition July 1, 2021 edition (2021 IBC/IMC/IPC/IFGC/IRC/IFC, 2021 commercial and residential IECC, plus the already-stale 2020 NEC) — the city FAQ has not been updated to reflect either the 2023 NEC statewide mandate or the 7/1/2026 edition change; the state statute governs regardless.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
29units

29 buildings · $9.8M valuation

Trailing 12 months
405units

12 of 12 months reported · #23 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
136units

57 buildings · $55.2M valuation

5 month(s) reported to Census

Full year 2025
351units

109 buildings · $64.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Provo City offices are open Monday through Thursday 7 AM – 6 PM ONLY — closed Fridays. Building permits are issued until 5:30 PM. Plan accordingly for permit submittals and inspections.
  • Provo has its own municipal electric utility — Provo City Power. This matters for solar/net metering: contact Provo City Power, not Rocky Mountain Power.
  • For residential structures with four or fewer dwelling units, the building permit fee INCLUDES plumbing, electrical, and mechanical — no separate MEP permits are required when pulling a building permit.
  • Building permit fees use the 1997 UBC Fee Chart (valuation per ICC Building Valuation Data) plus a plan review fee of 65% of the permit fee, per Provo's Consolidated Fee Schedule. Standalone trade-permit minimums: electrical $75, mechanical $75, plumbing $75 + $20 first fixture / $6 each additional. Demolition $100, single ADU $100.
  • All contractors must be licensed with Utah DOPL. Owner-builders must submit the DOPL Owner/Builder Certification form with their permit application.
  • Provo is a college town — ADU and rental property regulations are actively enforced.
  • Homes on the east side of Provo (hillside/mountain areas) require a soils report for all new construction due to landslide potential and fault proximity.
  • As of July 1, 2026, the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC (residential provisions) are currently in effect, superseding the 2021 editions per Utah Code § 15A-2-103; the IRC remains 2021 and the NEC remains 2023. Provo's own Building FAQ has not been updated to reflect this (see codesAdopted).

Comparable nearby cities

Orem
Both in Utah County17 shared permit types~5 mi away
Compare fees →
Spanish Fork
Both in Utah County16 shared permit types~9 mi away
Compare fees →
Lehi
Both in Utah County16 shared permit types~17 mi away
Compare fees →