EV Charger / EVSE Permit in Vineyard, Utah

Vineyard has not published a distinct EV-charger permit category or fee line item. The city's Consolidated Fee Schedule has no separate 'Electrical Permit' fee table at all — Building Permit Fees (a single valuation-based schedule) cover all permit types, including generator and solar PV installations per the city's own published entries for those permit types, and EV charger/EVSE installation is billed the same way as any other electrical work under that same valuation-based table.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • Electrical diagram showing connection to the existing electrical system and, per the Solar Submittal Requirements template used for other electrical work, a picture of the existing electrical panel

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based table)Vineyard City Consolidated Fee Schedule, 2025-2026 Fiscal Year, p.14 — no separate EV-charger or general electrical-permit fee line item is published; all permit types (including generator and solar PV) use this same valuation-based Building Permit Fees table per the city's own schedule.
Same valuation-based table as general Building Permit Fees (see Residential Building Permit entry)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Vineyard?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Scheduled Inspections (Building/Electrical)

    Requested through the online permitting system or by calling (801) 226-1929; Monday–Friday 8:00 AM–5:00 PM; no same-day scheduling.

See the full Vineyard inspection guide — scheduling & re-inspection fees →

Tips

  • Vineyard has no dedicated EV-charger permit, fee category, or submittal packet (unlike its Solar and Generator Submittal Requirements documents) — file as a standard Residential or Commercial Building Permit, valuation-based.

Frequently asked questions

Vineyard requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; Electrical diagram showing connection to the existing electrical system and, per the Solar Submittal Requirements template used for other electrical work, a picture of the existing electrical panel. If your project isn't listed, confirm with Vineyard Building Department at (801) 226-1929 before starting work.

No. Vineyard's Consolidated Fee Schedule does not list a distinct EV-charger or general electrical-permit fee category; an EV charger install is billed under the same valuation-based Building Permit Fee table used for all other permit types.

Vineyard does not publish a plan-review timeline for this permit. Contact Vineyard Building Department at (801) 226-1929 for current turnaround.

You'll need: Building Permit Application (Residential or Commercial, per project type). See the required-documents checklist on this page for details on each.

Vineyard requires 1 inspection(s) for an ev charger / evse permit, in order: Scheduled Inspections (Building/Electrical). Schedule each through Vineyard Building Department ((801) 226-1929).

Apply through Vineyard Building Department at 707 E Mill Rd, Suite 202, Vineyard, UT 84058. Phone: (801) 226-1929, email: building@vineyardutah.gov. Office hours: Mon–Thu 8:00 AM – 5:00 PM; Fri 8:00 AM – 12:00 PM, per the city's official Building Department page. Inspections are conducted Monday through Friday, 8:00 AM–5:00 PM; same-day inspection requests are not accepted; inspections can be requested through the online permitting system or by calling (801) 226-1929 during normal business hours (voicemail requests are not honored).. Official information: https://www.vineyardutah.gov/government/building.php.

Vineyard, Utah has adopted: 2021 Utah State Residential Code (Utah's amended version of the 2021 IRC), adopted statewide under Utah Code § 15A-2-103(1)(b) — REMAINS CURRENT, UNCHANGED by the 7/1/2026 statewide amendment. Vineyard City's own official 'Climatic and Geographic Design Criteria for Residential Construction in Vineyard' document (live-checked 2026-07-16, unchanged) states: 'Vineyard City utilizes the following building codes for residential construction: 2021 Utah State Residential Code Building Code as adopted by Utah Code Title 15A,' with online code reference https://codes.iccsafe.org/content/UTRC2021P1.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Vineyard's own Design Criteria document, added here per statute.; 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. Vineyard's own 'Special Inspection Agreement (2021 IBC)' form title still references the 2021 IBC by name — that form's title has not been confirmed updated as of this re-verification, but the statute governs the applicable construction-code edition regardless of the form's title.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); not previously itemized in this file, added here per statute since Vineyard's own materials do not separately publish trade-code editions.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); not previously itemized in this file, added here per statute.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); not previously itemized in this file, added here per statute.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment. CORRECTED: this file previously stated the statewide NEC edition as '2020 NEC' in a summary paragraph describing the pre-7/1/2026 code cycle — that figure was not sourced from any Vineyard city document (no Vineyard page or form found referencing an NEC edition at all) and is superseded here by the statute's actual current 2023 edition.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously referenced in this file's summary paragraph.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not previously itemized in this file, added here per statute.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not previously itemized in this file, added here per statute.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not previously itemized in this file, added here per statute.; Vineyard's official Design Criteria document additionally publishes the city's own climatic/geographic design parameters used alongside the adopted residential code: 31 psf± ground snow load, 100 mph wind speed, Seismic Design Category D, Severe weathering, 30" frost line depth, Zone 1,500-or-less air freezing index, and ice-barrier underlayment required.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021 Utah State Residential Code) and NEC (2023) did NOT change. This re-verification corrected two genuine defects: (1) the prior entry's undated summary paragraph asserted a bare '2020 NEC,' which was not traceable to any Vineyard source and is corrected to the statute's actual 2023 edition; (2) IPC, IMC, IFGC, IEBC, and residential ISPSC were entirely absent from this file's prior codesAdopted list despite being statute-mandated statewide, and are added here. Vineyard's own Design Criteria document was re-fetched live 2026-07-16 and is unchanged — it lists only the 2021 Utah State Residential Code and does not itemize IBC/IPC/IMC/IFGC/IECC/IEBC/NEC editions, so it presents no page-vs-statute conflict for those codes beyond the 'Special Inspection Agreement (2021 IBC)' form-title lag noted above.. Local amendments apply — see the Vineyard overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vineyard building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.