Accessory Dwelling Unit (ADU) Conditional Use Permit — Santa Clara, Utah · Requirements sheet
Verified 2026-07-08 · Source: https://cdn.santaclarautah.gov/file/scweb-prod/2025/08/ADU-Application_August-2025.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Conditional Use Permit in Santa Clara, Utah
Required for construction of an Accessory Dwelling Unit in Santa Clara, in addition to the standard building permit. Governed by Zoning Ordinance #2022-04; reviewed by a weekly Technical Review Committee (TRC) as an Administrative Conditional Use.
Verified 2026-07-08 · Source
When you need this permit
- ADU must be located on the same lot as an existing single-family owner-occupied dwelling on residentially zoned property Owner-builder
- ADU must contain complete cooking and bathroom facilities independent from the primary dwelling
- ADU must maintain the single-family appearance and character of the neighborhood
- ADU must be served by the same power and culinary water meters as the primary dwelling
- ADU must be rented for periods of 30 consecutive days or more (short-term rental use is prohibited)
- One ADU per property is permitted
- One additional off-street parking space required
- Building permit required for all new, remodel, and finish work associated with the ADU; compliance with the adopted IRC and state amendments is required
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Technical Review Committee (TRC) Review
Weekly TRC meeting reviews the ADU Conditional Use Application for zoning compliance prior to approval, per the official ADU application form.
- 2
Building Permit Inspections
Standard building, electrical, mechanical, and plumbing inspections apply to ADU construction once the associated building permit is issued (see residential-building-permit entry).
See the full Santa Clara inspection guide — scheduling & re-inspection fees →
Tips
- An ADU requires two separate approvals: the $100 Conditional Use Application (zoning/TRC) and a standard building permit (construction) — no ADU construction work may begin until the building permit itself is approved and issued, per the application form.
- ADUs cannot be used as short-term rentals — the minimum rental period is 30 consecutive days, per the official application.
- An Internal Accessory Dwelling Unit (IADU) uses a separate application (IADU Application) from the standalone/detached ADU form — confirm which form applies to your project type on the Building Department's document library.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santa Clara building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Santa Clara
Compare accessory dwelling unit (adu) conditional use permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Santa Clara project checklist
Describe your project once and get every permit, document, and fee it triggers in Santa Clara — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.