Residential Building Permit — Santa Clara, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://cdn.santaclarautah.gov/file/scweb-prod/2026/02/Building-Permit-Fees-Effective-Jan-2026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Santa Clara, Utah
Required for new single-family residential construction and any work regulated by the statewide-adopted 2021 IRC and 2024 IBC with Utah amendments (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged). Santa Clara's Building Fee is valuation-based (current ICC rates) plus a 10% Plan Review Fee and 1% Utah State Surcharge, and the city's own municipal code sets a 10-day plan-review return requirement.
Verified 2026-07-20 · Source
When you need this permit
- New single-family residential construction
- Any work regulated by the adopted 2021 IRC with Utah state amendments
- Building permit application with plans/specifications submitted in duplicate plus one PDF digital copy, verified by the person performing or in charge of the work (waivable by the building official), per Santa Clara City Code § 15.04.020
- Exempt only where retail material cost is under $500 AND the work does not enlarge the structure or affect its walls, per § 15.04.010(B)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Permit Application Review
Application and plans forwarded to the Building Official for review against adopted building codes and city ordinances; plans are returned to city staff within 10 days marked 'approved' or 'disapproved' (with reasons attached if disapproved), per Santa Clara City Code § 15.04.030.
- 2
Field Inspections
Building, electrical, mechanical, and plumbing field inspections conducted by the Santa Clara Building Department during construction; scheduled via the city's online permit portal (utah.cityinspect.com).
- 3
Final Inspection
Final inspection required prior to occupancy. The Building Official may revoke a permit at any time for work that violates any city ordinance, per Santa Clara City Code § 15.04.030.
See the full Santa Clara inspection guide — scheduling & re-inspection fees →
Tips
- Santa Clara's Building Official (as of this verification) is Cody Mitchell.
- Plans must be submitted in duplicate plus one PDF digital copy — not digital-only — per City Code § 15.04.020.
- Permits expire if work has not commenced within 180 days of issuance, or is suspended/abandoned for 180 days; resuming within 1 year of suspension costs half the original permit fee (if no plan changes), but renewing after a full year requires paying the entire fee again, per City Code § 17.04.060.
- Building Department office hours are shorter on Fridays (8:00 AM – 1:00 PM only) versus Monday–Thursday (8:00 AM – 5:00 PM).
- The fee sheet's phone number for the Building Department, (435) 656-4690, differs from the city's general/after-hours utility line, (435) 673-6712 — use the department-specific number for permit questions.
- Santa Clara operates its own municipal Power department; verify whether a project's electrical service falls within Santa Clara Power's service territory versus a neighboring provider before assuming standard connect fees apply.
- EV charger/EVSE installation is electrical work covered under this Residential Building Permit — Santa Clara's Building Permit Fees sheet (effective January 2026) lists 'Electrical Connect' and 'Electrical Impact' only as new-service utility hookup fees tied to meter/amperage size, not a permit category; no EV-charger-specific or electric-vehicle line item was found anywhere in the fee sheet as of a direct check on 2026-07-20.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santa Clara building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Santa Clara
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →