Commercial Building Permit in Santa Clara, Utah
Required for new commercial construction in Santa Clara, regulated by the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026). Santa Clara City's own 'Building Permit Fees' schedule (effective January 2026) sets Building Fees as valuation-based per current ICC rates, with a 10% Plan Review Fee and a 1% Utah State Surcharge — the schedule does not publish a separate residential/commercial split or a dedicated commercial valuation table distinct from these generic rates.
Reviewed 2026-07-19 · Source
When you need this permit
- New commercial construction regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a))
- Application submitted through the Santa Clara City Inspect online portal (utah.cityinspect.com)
- Project valuation stated on the application, based on current ICC Building Valuation Data rates per the city's own fee schedule
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Standard IBC inspection sequence before concrete pour, scheduled through the CityInspect portal.
- 2
Structural / Framing
Framing and structural elements verified before close-in.
- 3
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 4
Final
All work complete before occupancy.
See the full Santa Clara inspection guide — scheduling & re-inspection fees →
Tips
- Santa Clara's fee schedule does not publish a separate commercial valuation table (unlike Hurricane's or Washington City's occupancy-classification square-foot tables) — Building Fees are simply 'Based on current ICC rates,' so the exact per-square-foot rate for a given occupancy classification should be confirmed with the Building Department, (435) 656-4690.
- Santa Clara's 10% Plan Review Fee is notably lower than St. George's 65% and Ivins' 10% (same rate, different valuation base) — always compute both fees off the same declared valuation before comparing jurisdictions.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santa Clara building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Santa Clara.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Santa Clara
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →