Sign Permit in Farr West, Utah

Required for commercial and permanent signs (Planning Commission approval plus a permit issued by the City Recorder) and for temporary signs needing a permit (City Recorder approval only) under City Code Chapter 17.56 (Signs). The Fee Schedule (§ 3.30.010) sets the Sign Site Plan Application fee at $25.00; installing a sign before approval doubles the fee.

Verified 2026-07-20 · Source

When you need this permit

  • All commercial and permanent signs require approval by the Farr West City Planning Commission and a permit issued by the City Recorder (City Code § 17.56.020)
  • Temporary signs (including banner signs) that require a permit are approved by the City Recorder and may be displayed for up to 30 days or until the advertised event ends, whichever is shorter (§§ 17.56.020, 17.56.080.J)
  • If sign work is part of a commercial construction or exterior remodeling project, the sign application is included in the required site plan application; if a sign is being added to an existing structure or site, a separate sign application is required (§ 17.56.070.A)
  • Freestanding signs in C-2 Commercial zones are limited to one per building (regardless of tenant count), sized at 1 sq ft per linear foot of property frontage, max 25 ft height; in commercial zones with freeway access the cap rises to 3 sq ft per linear foot of frontage (max 300 sq ft) and 80 ft height (§ 17.56.070.B-C)
  • On-building signs may not exceed 15% of the aggregate surface area of the building elevation they're mounted on (§ 17.56.070.E)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Site Plan Application FeeFarr West City Fee Schedule, City Code § 3.30.010 — 'Sign Site Plan Application fee $25.00,' listed alongside the Commercial Site Plan Application fee ($100.00) and Conditional Use Application fee ($100.00). Fetched and confirmed live 2026-07-20.
$25.00
Unpermitted Sign PenaltyCity Code § 17.56.020: 'If any sign is installed on any property prior to a sign or site plan approval, the sign permit fee shall be doubled... Payment of the doubled fee does not relieve the sign owner of any other requirements or penalties prescribed in this title.'
Sign permit fee doubled

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Farr West?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Farr West inspection guide — scheduling & re-inspection fees →

    Tips

    • Off-premises advertising for another business is generally prohibited except for I-15 outdoor advertising structures and permitted construction signs (§ 17.56.070.A) — confirm before assuming a billboard-style sign is allowed.
    • Installing a sign before it is approved doubles the sign permit fee under § 17.56.020, on top of any other penalties in the sign chapter — always get approval before installation.
    • Freestanding commercial signs must be set back 10 feet from the front curb/property line and side property lines, keep 10 feet of clearance above walkways (14 feet above vehicle ways), and stay out of the clear view triangle at intersections (§ 17.56.080.A-D).
    • Political signs are allowed on private property, including the park strip, in any zone without a permit (§ 17.56.070.G); temporary/banner signs still go through the normal sign application process even though they're capped at 30 days (§ 17.56.080.J).
    • The city council can issue a special permit for a sign that doesn't otherwise conform to Chapter 17.56 for a limited special use or occasion (§ 17.56.080.H).

    Frequently asked questions

    Farr West requires a sign permit for: All commercial and permanent signs require approval by the Farr West City Planning Commission and a permit issued by the City Recorder (City Code § 17.56.020); Temporary signs (including banner signs) that require a permit are approved by the City Recorder and may be displayed for up to 30 days or until the advertised event ends, whichever is shorter (§§ 17.56.020, 17.56.080.J); If sign work is part of a commercial construction or exterior remodeling project, the sign application is included in the required site plan application; if a sign is being added to an existing structure or site, a separate sign application is required (§ 17.56.070.A); Freestanding signs in C-2 Commercial zones are limited to one per building (regardless of tenant count), sized at 1 sq ft per linear foot of property frontage, max 25 ft height; in commercial zones with freeway access the cap rises to 3 sq ft per linear foot of frontage (max 300 sq ft) and 80 ft height (§ 17.56.070.B-C); On-building signs may not exceed 15% of the aggregate surface area of the building elevation they're mounted on (§ 17.56.070.E). If your project isn't listed, confirm with Farr West City Building Department at (801) 731-4187 before starting work.

    The Sign Site Plan Application fee is $25.00 per the Fee Schedule (City Code § 3.30.010). If a sign is installed before it receives sign or site plan approval, the fee is doubled per § 17.56.020.

    Farr West does not publish a plan-review timeline for this permit. Contact Farr West City Building Department at (801) 731-4187 for current turnaround.

    You'll need: Sign Application. See the required-documents checklist on this page for details on each.

    Apply through Farr West City Building Department at 1896 North 1800 West, Farr West, UT 84404. Phone: (801) 731-4187, email: nate@farrwestcity.gov. Office hours: Mon–Thu 8:30 AM – 4:00 PM, Fri 8:30 AM – Noon; closed Sat–Sun. Inspections conducted Mon–Thu 7:30 AM–3:30 PM only (no Friday inspections); 24 hours' notice required to schedule.. Official information: https://farrwestcity.net/building-department.html.

    Farr West, Utah has adopted: International Building Code (IBC), promulgated by the International Code Council and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(1).; International Residential Code (IRC), promulgated by the International Code Council and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(1) (adopted jointly with the IBC in the same subsection).; National Electrical Code (NEC), promulgated by the National Fire Protection Association and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(2).; International Plumbing Code (IPC), promulgated by the International Code Council and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(3).; International Mechanical Code (IMC), amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(4).; International Fuel Gas Code, amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(5).; International Energy Conservation Code (IECC), amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(6).; International Existing Building Code (IEBC), amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(7). Farr West City Code does not enumerate specific edition years in § 15.04.010 itself; per Utah Code § 15A-1-403, code editions and effective dates are set statewide by the Utah Uniform Building Code Commission (the 2021 I-Code family was in force statewide as of verification date, with the 2024 family scheduled to take effect statewide July 1, 2026).. Local amendments apply — see the Farr West overview page for the full list.

    Commercial and permanent signs require Planning Commission approval plus a permit issued by the City Recorder. Temporary signs that need a permit are approved by the City Recorder alone (City Code § 17.56.020).

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farr West building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.