Commercial Building Permit — Farr West, Utah · Requirements sheet
Reviewed 2026-07-19 · Source: https://farrwestcity.net/building-permit-required.html
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Farr West, Utah
Required for new commercial construction in Farr West. Farr West's official Building Permit Required page lists 'New Commercial Projects' as a distinct permit-triggering category, but the city's only published fee page (farrwestcity.net/building-permit-fees.html) explicitly scopes its entire fee list — building/plan-check fee, sewer connection, storm water, park, fire, garbage-can, and state fees — to 'new residential homes.' No commercial-specific fee figure, valuation table, or impact-fee bundle was located after an exhaustive search of farrwestcity.net as of 2026-07-19.
Reviewed 2026-07-19 · Source
When you need this permit
- New commercial construction, per Farr West's official Building Permit Required page ('New Commercial Projects')
- Site plan approval must be obtained prior to building permit submittal for any commercial and/or residential development — site plan applications are submitted separately to the main office, not through the online iworq building permit portal, per Farr West's New Home Building Permit Process Packet (the same site-plan-first sequence documented for the Residential Building Permit in this file)
- Contractor information and license numbers (general, electrical, plumbing, mechanical contractors), per the standard Farr West City Building Permit Application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sewer & Water
Per Farr West's official Building Inspection Information sheet, which does not publish a separate commercial inspection sequence — the same list applies citywide. Contact (801) 731-4187 at least 24 hours in advance; no Friday inspections.
- 2
Footing/Setbacks
Per the Building Inspection Information sheet.
- 3
Foundation
Per the Building Inspection Information sheet.
- 4
4-Way (Framing, Plumbing, Electrical & HVAC) and Gas Clearance
Combined trade inspection plus gas clearance, per the Building Inspection Information sheet.
- 5
Final
Final inspection; the city's own list notes required inspections 'may not be all inclusive for all projects.'
See the full Farr West inspection guide — scheduling & re-inspection fees →
Tips
- Farr West's published fee page explicitly scopes its entire fee list — building/plan-check fee, sewer connection, storm water, park, fire, garbage-can, and state fees — to 'new residential homes.' No commercial fee figure is published anywhere on farrwestcity.net; call the Building Department at (801) 731-4187 for a commercial quote before budgeting.
- Site plan approval (processed at the main office, separately from the online iworq permit portal) is a prerequisite to building permit submittal for commercial and residential development alike, per the city's New Home Building Permit Process Packet.
- Farr West's Building Official/Combination Inspector Nate Carver (801-731-4187) is the single point of contact for both commercial and residential plan review and field inspections — there is no separate commercial plans examiner.
- Farr West has no separate Change of Use, Change of Occupancy, or standalone Certificate of Occupancy verification process on its published code or forms. Title 15.04.010 of the city code adopts the IBC/IRC by reference without a local change-of-occupancy fee schedule, and the city's business license application (business_license.pdf) does not reference or require a certificate of occupancy. A use or occupancy change on an existing building is handled as a standard commercial building permit review through this same process — call the Building Department at (801) 731-4187 to confirm scope before applying.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farr West building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Farr West.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Farr West
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Farr West project checklist
Describe your project once and get every permit, document, and fee it triggers in Farr West — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →