EV Charger / EVSE Permit in Farr West, Utah

Farr West City does not publish a separate EV-charger/EVSE permit or fee. The city's official Building Permit Fees page lists building-permit fees based on square footage/valuation, plus a 50% plan check fee, sewer/storm water/park/fire impact fees, a garbage can fee, and a state fee — with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Farr West
  • Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g)) and enforced through Weber County/Farr West building code adoption
  • Building permit application submitted per the Farr West City Building Department process

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeFarr West City official Building Permit Fees page. No distinct EV-charger or standalone-electrical dollar figure is published; a 50% plan check fee also applies.
Based on square footage/valuation; no static dollar figure published

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Farr West?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Field inspection of the EV charger circuit and installation, scheduled through the Farr West City Building Department, (801) 731-4187. Inspections are conducted Monday-Thursday 7:30 AM-3:30 PM only (no Friday inspections); 24 hours' notice required.

See the full Farr West inspection guide — scheduling & re-inspection fees →

Tips

  • Farr West has no separate EV-charger permit or fee category — the city's official Building Permit Fees page bases all building-permit work, including electrical, on square footage/valuation plus a 50% plan check fee.
  • Farr West does not conduct inspections on Fridays, and requires 24 hours' notice to schedule — plan an EV charger install's inspection accordingly.
  • Confirm the exact fee for a standalone electrical/EV-charger permit with the Building Department before applying, since no EV-specific dollar figure is published.

Frequently asked questions

Farr West requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Farr West; Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g)) and enforced through Weber County/Farr West building code adoption; Building permit application submitted per the Farr West City Building Department process. If your project isn't listed, confirm with Farr West City Building Department at (801) 731-4187 before starting work.

No. Farr West's official Building Permit Fees page publishes no distinct EV-charger line item — building permit fees, including electrical work, are based on square footage/valuation plus a 50% plan check fee. Confirm the exact cost with the Building Department, (801) 731-4187.

Farr West does not publish a plan-review timeline for this permit. Contact Farr West City Building Department at (801) 731-4187 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Farr West requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Farr West City Building Department ((801) 731-4187).

Apply through Farr West City Building Department at 1896 North 1800 West, Farr West, UT 84404. Phone: (801) 731-4187, email: nate@farrwestcity.gov. Office hours: Mon–Thu 8:30 AM – 4:00 PM, Fri 8:30 AM – Noon; closed Sat–Sun. Inspections conducted Mon–Thu 7:30 AM–3:30 PM only (no Friday inspections); 24 hours' notice required to schedule.. Official information: https://farrwestcity.net/building-department.html.

Farr West, Utah has adopted: International Building Code (IBC), promulgated by the International Code Council and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(1).; International Residential Code (IRC), promulgated by the International Code Council and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(1) (adopted jointly with the IBC in the same subsection).; National Electrical Code (NEC), promulgated by the National Fire Protection Association and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(2).; International Plumbing Code (IPC), promulgated by the International Code Council and amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(3).; International Mechanical Code (IMC), amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(4).; International Fuel Gas Code, amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(5).; International Energy Conservation Code (IECC), amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(6).; International Existing Building Code (IEBC), amended and adopted by the Utah State Legislature — per Farr West City Code § 15.04.010(7). Farr West City Code does not enumerate specific edition years in § 15.04.010 itself; per Utah Code § 15A-1-403, code editions and effective dates are set statewide by the Utah Uniform Building Code Commission (the 2021 I-Code family was in force statewide as of verification date, with the 2024 family scheduled to take effect statewide July 1, 2026).. Local amendments apply — see the Farr West overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farr West building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.