Do I Need a Permit to Replace a Furnace in Washington?

Furnace replacement permit requirements. Even same-model swaps need a mechanical permit. What inspectors check.

Yes — even a like-for-like furnace swap requires a mechanical permit.

Why Even a Swap Needs a Permit

Furnace replacements involve gas connections, venting, and combustion air — all safety-critical systems. Most jurisdictions require a mechanical permit to verify the new furnace is properly vented, has adequate combustion air, and the gas connections are leak-free. This is true even for exact same-model replacements.

High-Efficiency Conversions

Upgrading from a standard-efficiency (80%) to high-efficiency (90%+) furnace changes the venting requirements: standard units use metal B-vent, high-efficiency units use PVC/CPVC. The old metal vent chase may need to be sealed. A condensate drain line is also required for high-efficiency units.

What Inspectors Check

The final inspection covers: gas piping and drip leg, venting type and clearances, combustion air supply (especially in confined spaces), condensate drain (high-efficiency units), thermostat operation, and CO detector presence on every level.

Bundled with AC?

If you're replacing both the furnace and AC unit at the same time, one mechanical permit typically covers both. The inspector will check the AC refrigerant lines, electrical disconnect, and condenser pad in addition to the furnace items.

Yes, always. The permit is $40-$75 and your HVAC contractor handles it. One final inspection. Don't skip it — CO poisoning from bad venting is real.

Permit fees by city in Washington

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

20 rows

Permit fees by city in Washington
Permit feeSource
Bonney LakeSet by city council resolutionVerifiedvia Residential building permitResidential building permit
Des MoinesSet by the City Manager or designeeVerifiedvia Residential building permitResidential building permit
EdmondsSet by council resolution; not in codeVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Issaquah$33.26 minimum, tiered by valuationVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
KenmoreSet by adopted fee scheduleVerifiedvia Residential building permitResidential building permit
Lake StevensSet by city council resolutionVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
LongviewSet in the master fee scheduleVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
LynnwoodSet by city council fee ordinanceVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Maple ValleySet by Development Fee ScheduleVerifiedvia Residential building permitResidential building permit
Mercer IslandSet by city council resolutionVerifiedvia Residential building permitResidential building permit
Moses LakeSet by city council resolutionVerifiedvia Residential building permitResidential building permit
Mountlake TerraceSet by annually adopted fee scheduleVerifiedvia Residential building permitResidential building permit
PullmanSet by city council resolutionVerifiedvia Residential building permitResidential building permit
PuyallupSet by city manager executive orderVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
SammamishSee city page for the current Residential Building Permit feeResidential Building Permit
SeaTacSet by City of SeaTac Fee ScheduleVerifiedvia Residential building permitResidential building permit
TumwaterSet by city council resolutionVerifiedvia Residential building permitResidential building permit
University PlaceSet by city council fee resolutionVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Walla WallaFrom $30.00, tiered by valuationVerifiedvia Residential building permitResidential building permit
WenatcheeNot published in code; ask the cityVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)

See the national overview for this permit →