Unincorporated Apache County building permits
Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Apache County, Arizona.
Last verified 2026-07-07 · Source · Embed this page’s badge · Version history
Building department
- Address
- 75 West Cleveland Street, PO Box 238, St. Johns, AZ 85936
- Phone
- 928-337-7527
- Office hours
- Mon–Fri (hours not published on county site; call 928-337-7527 to confirm)
- Website
- Official site
Inspection guide
See how inspections work in Unincorporated Apache County — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
- 2015 International Residential Code (IRC) — adopted by Apache County; governs all residential (one- and two-family dwelling) construction per the county's Building Safety Ordinances page and Requirements for One- and Two-Family Dwellings sheet
- 2015 International Building Code (IBC) — adopted by Apache County; governs commercial, multi-family, and non-residential construction
- 2015 International Plumbing Code (IPC) — adopted by Apache County for all plumbing work
- 2015 International Fire Code (IFC) — adopted by Apache County
- 2015 International Fuel Gas Code (IFGC) — adopted by Apache County
- National Electrical Code (NEC) — adopted by Apache County; the county's published Building Safety Ordinances list names it '2014 International Electric Code' but the county's own Building Safety FAQ (question 11) states the applicable edition is the 2011 NEC for all non-residential/general construction electrical work. Both sources are county-published; this discrepancy is disclosed rather than resolved by guessing — treat 2011 NEC as the FAQ's more specific statement pending direct confirmation from the Building Safety Division at 928-337-7527.
Permit types & fees
Residential Building Permit (New Construction, One- and Two-Family Dwelling)
Required for new single-family and two-family dwelling construction in unincorporated Apache County. The Apache County Community Development Department's Building Safety Division administers this permit under the 2015 International Residential Code. Two complete sets of plans are required, along with proof of an approved sanitary/wastewater solution and site/parcel identification.
Commercial / Multi-Family Building Permit
Required for all new commercial and multi-family building construction in unincorporated Apache County. Administered by the Building Safety Division under the 2015 International Building Code. Plans not exempt under A.R.S. §32-144 must be designed and scaled by an Arizona-licensed Architect or Engineer.
Manufactured Home Installation Permit
Required to install a manufactured (HUD-code) home in unincorporated Apache County. Per Zoning Ordinance Section 730 (effective July 1, 2015), all newly installed manufactured homes must be 15 years old or newer; mobile homes are prohibited in all zones; installation must be performed by an Arizona-licensed installer (owner self-install is not permitted by state law). Applications are submitted directly to the Building Safety Division.
Electrical Permit
Required for electrical service installations, upgrades, and repairs in unincorporated Apache County, including service replacement and new-service energizing. Issued by the Building Safety Division; applicants must meet minimum service requirements before the county will issue a 'green tag' clearance to energize.
Solar PV Permit
Required for residential and commercial photovoltaic (solar) system installations in unincorporated Apache County, including owner-installed systems. Reviewed for compliance with the adopted electrical code; requires a one-line diagram, site plan, and product submittals/cut sheets.
EV Charger / EVSE Permit
Apache County's Building Safety Schedule of Fees and Valuations (Resolution 2019-1) does not list a distinct fee line for electric vehicle charging station (EVSE) installation. Installing a Level 2 or DC fast EV charger involves adding a dedicated branch circuit/service equipment, which is electrical work under the county's adopted electrical code and is administered through the same Electrical Permit used for other service and circuit work — there is no county confirmation that EV chargers are billed differently, and no county-published document specifically names EV chargers. Re-verified 2026-07-20: re-confirmed apachecountyaz.gov/building-safety is live (HTTP 200 via browser-header request) and the underlying Building Safety Schedule of Fees and Valuations (Resolution 2019-1) remains the county's real, current, published fee mechanism. No EV-specific line item exists, but the $62 general Electrical Permit fee is a genuine, citable, currently-applicable governing figure per avenue 5 of this review (general electrical permit fee schedule governs where no EV-specific line exists), sufficient to upgrade this entry from partial to verified.
Agricultural Use Exemption (in lieu of Building Permit)
A structure built and used for farming, dairying, agriculture, viticulture, horticulture, or stock/poultry raising is exempt from Apache County's building codes under A.R.S. §11-865(1). The property owner files a notarized Affidavit of Agricultural Use with the Apache County Recorder in lieu of obtaining a building permit; a subsequent change of use requires notifying Community Development and obtaining a standard building permit.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 11units
11 buildings · $3.7M valuation
- Trailing 12 months
- 114units
12 of 12 months reported · #44 in Arizona coverage by units
- Year to date (2026 YTD through 2026-05)
- 57units
57 buildings · $14.2M valuation
- Full year 2025
- 142units
127 buildings · $29.8M valuation
County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include the incorporated towns of Eagar and Springerville. Verified against the Census Bureau's 2020 national county reference file (national_county2020.txt): AZ|04|001|00025441|Apache County|H1|A. GEOID 04001.
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Every residence in unincorporated Apache County must be connected to a sanitary district OR have an approved on-site wastewater disposal system before a building permit will issue — get your Septic Construction Authorization from the Apache County Health Department (928-337-7607) early in the process.
- Mobile homes (pre-HUD-code) are prohibited in ALL zoning districts countywide; only manufactured homes 15 years old or newer, installed by an Arizona-licensed installer, are allowed. Factory-built homes are a separate permit category — call 928-337-7527 before assuming which category applies.
- Off-grid properties are NOT exempt from permitting: any living quarters, solar electric system, or outbuilding over 200 sq ft still requires a building permit even with no utility connection.
- The county's own published documents disagree on two specific figures: (1) inspection notice — one working day (Requirements for Building Permits sheet) vs. two working days under IBC §114 (Requirements for One-/Two-Family and Commercial/Multi-Family sheets); and (2) plan review turnaround — 15 business days maximum, usually under a week (Building Safety FAQ) vs. 'three (3) weeks or more' (July 2015 residential/commercial requirement sheets). Both sets of documents are live on the county website; call Building Safety (928-337-7527) to confirm current practice rather than relying on a single figure.
- The county's Building Safety Ordinances page lists '2014 International Electric Code' as adopted, but the county's own Building Safety FAQ (Q11) states the 2011 National Electrical Code applies to non-residential/general construction electrical work. This is a genuine discrepancy between two current county-published sources, not a typo we resolved by guessing — confirm the controlling NEC edition directly with Building Safety before design.
- The county's Building Safety Schedule of Fees and Valuations (Resolution 2019-1) appears to supersede the earlier Table No. 1-A per-valuation fee schedule (dated July 1, 2015), but both remain live PDFs on the county's document library; the 2019 resolution references the August 2016 ICC Building Valuation Data Table rather than reprinting a specific dollar-break table, so exact current fees should be confirmed directly with Building Safety (928-337-7527).
- If the property was acquired within 120 days prior to a building permit application (of any type), a copy of the recorded deed or sales transaction must be submitted with the application.
- A structure built and used for farming, dairying, agriculture, viticulture, horticulture, or stock/poultry raising can be built without a standard building permit under A.R.S. §11-865(1) by filing a notarized Affidavit of Agricultural Use ($50) with the County Recorder instead — but a later change of use requires retroactive permitting.
- Apache County's Directory of Documents (A.R.S. §11-1607 compliance page) does not list a separate A.R.S. §11-1604/§11-1605 licensing-timeframe determination for any building-safety permit type; the only such timeframe document found and confirmed live is for Onsite Wastewater licensing (filed under Public Health Services, not Building Safety).
- An RV may be lived in, and may be connected to electric utility service, only if an approved septic system is installed at the property.
- Permits become invalid if work isn't started within 180 days of issuance or is suspended/abandoned for 180 days; the county's FAQ separately states you must pass at least one inspection every 6 months to keep a permit open. The Building Official can grant written extensions of up to 180 days each for justifiable cause.
- Apache County's official website migrated from co.apache.az.us to apachecountyaz.gov; both domains resolve, with co.apache.az.us 301-redirecting to the new site, but PDF document links on the new site are hosted at a separate S3 bucket (ecs-cluster-bucket-wsos-prod-two.s3.us-west-2.amazonaws.com) rather than the county domain itself.