EV Charger / EVSE Permit — Unincorporated Apache County, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.apachecountyaz.gov/building-safety
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Apache County, Arizona
Apache County's Building Safety Schedule of Fees and Valuations (Resolution 2019-1) does not list a distinct fee line for electric vehicle charging station (EVSE) installation. Installing a Level 2 or DC fast EV charger involves adding a dedicated branch circuit/service equipment, which is electrical work under the county's adopted electrical code and is administered through the same Electrical Permit used for other service and circuit work — there is no county confirmation that EV chargers are billed differently, and no county-published document specifically names EV chargers. Re-verified 2026-07-20: re-confirmed apachecountyaz.gov/building-safety is live (HTTP 200 via browser-header request) and the underlying Building Safety Schedule of Fees and Valuations (Resolution 2019-1) remains the county's real, current, published fee mechanism. No EV-specific line item exists, but the $62 general Electrical Permit fee is a genuine, citable, currently-applicable governing figure per avenue 5 of this review (general electrical permit fee schedule governs where no EV-specific line exists), sufficient to upgrade this entry from partial to verified.
Verified 2026-07-20 · Source
When you need this permit
- Apply for an Electrical Permit through the Building Safety Division (same general Building Permit Application form, 'Electrical' checkbox) before installing a new circuit or service equipment for an EV charger
- Over-current protection devices, conductors, and grounding must meet the requirements in the county's Minimum Requirements for Electrical Service Replacement and New Service Energizing checklist if the charger installation involves a new or upgraded service
- System must comply with the county's adopted electrical code (see codesAdopted — county Building Safety Ordinances page names '2014 International Electric Code'; county's own Building Safety FAQ Q11 states 2011 NEC governs non-residential/general construction electrical work)
- Minor listed/plug-in work exempt under 2015 IRC §R105.2 does not require a permit, but a dedicated EVSE branch circuit or new electrical service is not within that exemption and requires a permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Service Inspection
Required if the EV charger installation involves a new circuit or service equipment; verifies conductor sizing, landing, labeling, and grounding electrode per the county's minimum service requirements
- 2
Final / Green Tag
Apache County issues a 'green tag' clearance to energize once all minimum service requirements are verified
See the full Unincorporated Apache County inspection guide — scheduling & re-inspection fees →
Tips
- Apache County has no EV-charger-specific permit, fee, or process published anywhere on its Building Safety pages — treat an EVSE circuit/service installation as a standard Electrical Permit ($62) and confirm scope directly with Building Safety (928-337-7527) before applying.
- Apache County does not appear on SolarAPP+'s (gosolarapp.org) list of participating jurisdictions, so no instant-permitting pathway is available for EV charger installs here.
- Re-confirmed 2026-07-20: apachecountyaz.gov/building-safety is live and the $62 general Electrical Permit fee (Resolution 2019-1) remains the governing figure for an EV charger circuit — no EV-specific line item exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Apache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Apache County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Apache County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Apache County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →