EV Charger / EVSE Permit — Unincorporated Apache County, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.apachecountyaz.gov/building-safety
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Apache County, Arizona
Apache County's Building Safety Schedule of Fees and Valuations (Resolution 2019-1) does not list a distinct fee line for electric vehicle charging station (EVSE) installation. Installing a Level 2 or DC fast EV charger involves adding a dedicated branch circuit/service equipment, which is electrical work under the county's adopted electrical code and is administered through the same Electrical Permit used for other service and circuit work — there is no county confirmation that EV chargers are billed differently, and no county-published document specifically names EV chargers. The county's Building Safety page (apachecountyaz.gov/building-safety) is live, and the Building Safety Schedule of Fees and Valuations (Resolution 2019-1) remains the county's real, current, published fee mechanism. With no EV-specific line item, the $62 general Electrical Permit fee is the genuine, citable, currently-applicable governing figure, since the general electrical permit fee schedule governs where no EV-specific line exists.
Verified 2026-07-20 · Source
When you need this permit
- Apply for an Electrical Permit through the Building Safety Division (same general Building Permit Application form, 'Electrical' checkbox) before installing a new circuit or service equipment for an EV charger
- Over-current protection devices, conductors, and grounding must meet the requirements in the county's Minimum Requirements for Electrical Service Replacement and New Service Energizing checklist if the charger installation involves a new or upgraded service
- System must comply with the county's adopted electrical code (see codesAdopted — county Building Safety Ordinances page names '2014 International Electric Code'; county's own Building Safety FAQ Q11 states 2011 NEC governs non-residential/general construction electrical work)
- Minor listed/plug-in work exempt under 2015 IRC §R105.2 does not require a permit, but a dedicated EVSE branch circuit or new electrical service is not within that exemption and requires a permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Building Safety Schedule of Fees and Valuations, Resolution 2019-1. Show full citationHide
Building Safety Schedule of Fees and Valuations, Resolution 2019-1. The fee table contains no 'EV', 'electric vehicle', or 'EVSE' line item — it lists only a general 'Electrical Permit... 62' line, and EV charger circuit or service work is administered under that general electrical permit. It is a scanned-image PDF with no text layer, so read the figures from the page as published.Review timeline
Inspection process
- 1
Rough-In / Service Inspection
Required if the EV charger installation involves a new circuit or service equipment; verifies conductor sizing, landing, labeling, and grounding electrode per the county's minimum service requirements
- 2
Final / Green Tag
Apache County issues a 'green tag' clearance to energize once all minimum service requirements are verified
See the full Unincorporated Apache County inspection guide — scheduling & re-inspection fees →
Tips
- Apache County has no EV-charger-specific permit, fee, or process published anywhere on its Building Safety pages — treat an EVSE circuit/service installation as a standard Electrical Permit ($62) and confirm scope directly with Building Safety (928-337-7527) before applying.
- Apache County does not appear on SolarAPP+'s (gosolarapp.org) list of participating jurisdictions, so no instant-permitting pathway is available for EV charger installs here.
- : apachecountyaz.gov/building-safety is live and the $62 general Electrical Permit fee (Resolution 2019-1) remains the governing figure for an EV charger circuit — no EV-specific line item exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Apache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Apache County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Apache County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Apache County lands. Privacy.
Other permits in Unincorporated Apache County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →