Residential Building Permit (New Construction, Addition, Accessory Structure) — Unincorporated Cochise County, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.cochise.az.gov/868/Residential-Projects
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction, Addition, Accessory Structure) in Unincorporated Cochise County, Arizona
Required for new single-family dwellings, additions, alterations, and accessory structures in unincorporated Cochise County. The Development Services Department's Building Safety Division enforces the 2015 IBC/IRC with local amendments. Applications and plan submittals are completed online through the county's Citizenserve permitting portal.
Verified 2026-07-23 · Source
When you need this permit
- Required for new single-family dwellings, additions, alterations, replacements, and accessory structures in unincorporated Cochise County
- Confirm the property's zoning allows the intended residential use, and verify site conditions (floodplain, stormwater/drainage, access/driveway, septic or sewer, well, fire district requirements) before applying
- Determine whether additional permits are needed (septic, floodplain, right-of-way, temporary RV, accessory structure)
- Create an account and apply online through the Cochise County Permitting Portal (Citizenserve); select Residential Permit, then the correct project subtype
- Provide parcel number, project description (new/addition/alteration/replacement), number of bedrooms, sewer/septic information, water fixtures, and utility service details
- If using a licensed contractor, provide current contractor information via the Contractor Information Form Contractor
- If applying under the Rural Residential Owner-Builder Amendment, follow the separate eligibility and application instructions (4-acre-minimum zoning districts only) Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Cochise County Code §14.15 (Residential Permits), part of the county's codified Development Services Fee Schedule (effective 2022-07-01, fee figures amended by Res. Show full citationHide
Cochise County Code §14.15 (Residential Permits), part of the county's codified Development Services Fee Schedule (effective 2022-07-01, fee figures amended by Res. 24-14 effective 2024-10-01), https://cochisecounty.municipalcodeonline.com/book?type=ordinances#name=14_DEVELOPMENT_SERVICES_FEE_SCHEDULE. This is the standalone Building Permit Fee Rate Schedule referenced by the IBC §109.3 local amendment; it supersedes the 2009 Fee Ordinance No. 037-09 figures. The county's own FAQ 185 ('How much does a permit cost?', https://www.cochise.az.gov/Faq.aspx?QID=185) points applicants directly to this Chapter 14 schedule and its online fee calculators.Cochise County Code §14.15. Supersedes the prior flat-fee bands (Detached Garage $100 flat up to 1,000 sq ft; Show full citationHide
Cochise County Code §14.15. Supersedes the prior flat-fee bands (Detached Garage $100 flat up to 1,000 sq ft; Sheds/Outbuildings $50/$100) from the 2009 Fee Ordinance 037-09 — the current schedule values all new residential accessory structures per square foot and runs the result through the graduated rate schedule above, rather than a flat fee.Cochise County Code §14.15. Additional plan review beyond the three included submissions: $50.00/hour, 1-hour minimum. Show full citationHide
Cochise County Code §14.15. Additional plan review beyond the three included submissions: $50.00/hour, 1-hour minimum. County-published worked example: a 2,000 sq ft R-3 VB-construction home at $91.56/sq ft = $184,000 valuation → $1,615 building permit fee → +65% plan review ($1,049.75) = $2,664.75 total building permit fee, before miscellaneous/septic add-ons.The flat $15 Residential Permit Review Fee and $15 Revision Fee this record previously cited from the 2009 Fee Ordinance 037-09 do not appear in the current Cochise County Code Chapter 14 Development… Show full citationHide
The flat $15 Residential Permit Review Fee and $15 Revision Fee this record previously cited from the 2009 Fee Ordinance 037-09 do not appear in the current Cochise County Code Chapter 14 Development Services Fee Schedule. The graduated Building Permit Fee Rate Schedule above (minimum $24.00 for $1–$500 valuation) appears to have absorbed/replaced this flat review fee. Kept here rather than deleted, per this database's never-delete-figures policy, even though this field itself is now closed (verified-negative).Review timeline
Inspection process
- 1
Footing/Foundation
Before concrete pour — verify footing depth (12 in. minimum at 1,000 psf allowable foundation pressure, 18 in. for Table 1806.2 values per local amendment), dimensions, and reinforcement per 2015 IRC/IBC as amended
- 2
Framing
After framing, sheathing, and rough-in trades complete — before insulation or wall cover
- 3
Insulation
Insulation installed before wall cover, per adopted energy provisions
- 4
Final
All work complete per approved plans; a final inspection is required to close the permit. Certificate of Occupancy may be issued if eligible once minimum requirements are verified.
See the full Unincorporated Cochise County inspection guide — scheduling & re-inspection fees →
Tips
- Cochise County automatically assigns a physical address when a habitable-structure permit is issued — you do not need to apply separately for an address, but you must post it once assigned and separately contact USPS to start mail delivery.
- Construction may only begin after the Permit Placard and Inspection Record Card are printed and posted at the job site.
- Review timelines are governed by A.R.S. §11-1605: administrative completeness review will not exceed 40 business days total, and substantive review will not exceed 105 business days total (extendable to 165 business days by written agreement for technically complex projects). These are outer-bound statutory caps, not typical turnaround times — actual review is often faster for straightforward single-family projects.
- If your parcel is 4 acres or larger in a qualifying zoning district, the Rural Residential Owner-Builder Amendment may reduce permitting costs and required inspections — but review Option 1 vs. Option 2 carefully, since Option 2 (no plan review, no inspections) is NOT eligible for a Certificate of Occupancy. Owner-builder
- Confirm zoning and any HOA/CC&R restrictions before applying; Development Services does not enforce private CC&Rs.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cochise County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Cochise County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Cochise County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Cochise County lands. Privacy.
Other permits in Unincorporated Cochise County
Residential Building Permit (New Construction, Addition, Accessory Structure) in other cities
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Cochise County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Cochise County — in one checklist. Free, for any city and any number of projects.
Get started →