Commercial / Non-Residential Building Permit (New Construction, Multi-Family, Tenant Improvement) in Unincorporated Cochise County, Arizona

Required for new non-residential structures, including multi-family buildings, tenant improvements, and remodels in unincorporated Cochise County. The Building Safety Division enforces the 2015 IBC with local amendments. All submittals are online through the Citizenserve portal.

Verified 2026-07-23 · Source

When you need this permit

  • Required for new non-residential structures (including multi-family buildings), tenant improvements, and remodels in unincorporated Cochise County
  • Submit the Cochise County joint permit application online, plus an Acknowledgment of Property Ownership or Agent Authorization and a Commercial Contractor Identification Attachment
  • Provide a commercial site plan meeting the county's Basic Site Plan Requirements (tax parcel ID, north arrow/scale, building footprints with height and square footage, parking, setbacks, drainage ways within 300 feet, septic/well locations, sight-distance triangles, etc.)
  • Construction plans and off-site improvement plans must be stamped by a licensed Arizona engineer or architect
  • Additional plans/attachments may be required depending on project scope: hazardous material attachment, commercial lighting plan, sign permit application, landscape/irrigation plans (Growth Categories A/B), floodplain use permit and elevation certificate, drainage statement/report, Sierra Vista sub-watershed water conservation attachment, antenna/tower checklist, traffic impact study, SWPPP
  • Other agency review/approval may be required: Fire District, Arizona Department of Agriculture (Notice of Intent to Clear Land), ADEQ (Notice of Intent / 401 Permit), ADOT Right-of-Way/Encroachment Permit, USACOE 404 Permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Change of Use (when no other permits are required)RE-CHASED 2026-07-23: Cochise County Code §14.18 (Non-Residential Permits), current fee schedule. Supersedes this file's prior $150 'Non-Residential Uses — Change of Use' figure from the 2009 Fee Ordinance 037-09.
$100
Building Permit Fee Rate Schedule — valuation-based (graduated)RE-CHASED 2026-07-23 — CLOSED on a live primary source: Cochise County Code §14.18 (Non-Residential Permits), part of the codified Development Services Fee Schedule (effective 2022-07-01, amended by Res. 24-14 effective 2024-10-01), https://cochisecounty.municipalcodeonline.com/book?type=ordinances#name=14_DEVELOPMENT_SERVICES_FEE_SCHEDULE — accessed via the Browser pane. This IS the standalone Building/Use permit fee rate table referenced by the IBC §109.3 local amendment; the table differs slightly from the residential table in the $501–$2,000 band. Per Code §14.18, new non-residential structures (other than one/two-family residential) are valued using the ICC's current published Building Valuation Data (released semi-annually) by construction type, then run through this graduated table.
$24.00 for $1–$500 of valuation; $24.00+$3.00/$100 over $500 for $501–$2,000; $69.00+$11.00/$1,000 over $2,000 for $2,001–$40,000; $487.00+$9.00/$1,000 over $40,000 for $40,001–$100,000; $1,027+$7.00/$1,000 over $100,000 for $100,001–$500,000; $3,827.00+$5.00/$1,000 over $500,000 for $500,001–$1,000,000; $6,327.00+$3.00/$1,000 over $1,000,000 for $1,000,001–$5,000,000; $18,327+$1.00/$1,000 over $5,000,000 for $5,000,001 and over
Non-Residential Plan Review Fee (includes three reviews)Cochise County Code §14.18. Additional plan review beyond the three included reviews: $50.00/hour, 1-hour minimum. County-published worked example: a 2,000 sq ft B-occupancy VB-construction office at $126.48/sq ft (ICC Building Valuation Data rate) = $252,960 valuation → $2,098 building permit fee → +65% plan review ($1,363.70) = $3,461.70 total building permit fee, before miscellaneous/septic add-ons.
65% of the Building Permit Fee
Commercial Permit Review Fee (non-refundable, applied toward building/use permit fee)Fee Ordinance No. 037-09 (Docket R-08-03), Exhibit A. This specific line item was not re-located as a standalone entry in the current Chapter 14 schedule during the 2026-07-23 re-chase — the schedule's own graduated table above starts at $24.00 minimum, which may have absorbed it (paralleling the confirmed disappearance of the analogous $15 residential review fee). Kept pending direct confirmation with Development Services (520-432-9300).
$100
Non-Residential Uses — Accessory StructuresFee Ordinance No. 037-09, Exhibit A. Not re-located as a standalone line item in the current Chapter 14 §14.18 schedule during the 2026-07-23 re-chase (which lists Change of Use and general valuation-based fees but not a distinct 'accessory structures' flat fee) — may now be valued through the graduated table above instead. Kept pending direct confirmation.
$100
Non-Residential Uses — All Other (0–9,999 sq ft / 10,000 sq ft and greater)Fee Ordinance No. 037-09, Exhibit A. Not re-located as a standalone line item in the current Chapter 14 §14.18 schedule during the 2026-07-23 re-chase — may now be valued through the graduated Building Permit Fee Rate Schedule above instead. Kept pending direct confirmation.
$150 / $300

Review timeline

Plan reviewUnincorporated Cochise County’s published plan-review target
40–165 business days

How long did your Commercial / Non-Residential Building Permit (New Construction, Multi-Family, Tenant Improvement) permit actually take in Unincorporated Cochise County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Before concrete pour, per 2015 IBC as amended

  2. 2

    Framing / Structural

    After structural framing complete, before wall cover

  3. 3

    Final

    All work complete per approved plans; Certificate of Occupancy issued upon verification

See the full Unincorporated Cochise County inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial substantive review can run up to 165 business days total (105 business days plus a 60-business-day extension) for projects with complicated technical review documents, per A.R.S. §11-1605(I) — factor this into project timelines for complex non-residential work.
  • If your project triggers public hearings or approvals by a non-county agency (state or federal), the statutory review-timeline clock is suspended until that outside review/approval is received.
  • Commercial projects are NOT eligible for any of the residential Permit Exemptions list — a permit is required regardless of dollar value where building code requirements apply to non-residential uses.

Frequently asked questions

Unincorporated Cochise County requires a commercial / non-residential building permit (new construction, multi-family, tenant improvement) for: Required for new non-residential structures (including multi-family buildings), tenant improvements, and remodels in unincorporated Cochise County; Submit the Cochise County joint permit application online, plus an Acknowledgment of Property Ownership or Agent Authorization and a Commercial Contractor Identification Attachment; Provide a commercial site plan meeting the county's Basic Site Plan Requirements (tax parcel ID, north arrow/scale, building footprints with height and square footage, parking, setbacks, drainage ways within 300 feet, septic/well locations, sight-distance triangles, etc.); Construction plans and off-site improvement plans must be stamped by a licensed Arizona engineer or architect; Additional plans/attachments may be required depending on project scope: hazardous material attachment, commercial lighting plan, sign permit application, landscape/irrigation plans (Growth Categories A/B), floodplain use permit and elevation certificate, drainage statement/report, Sierra Vista sub-watershed water conservation attachment, antenna/tower checklist, traffic impact study, SWPPP; Other agency review/approval may be required: Fire District, Arizona Department of Agriculture (Notice of Intent to Clear Land), ADEQ (Notice of Intent / 401 Permit), ADOT Right-of-Way/Encroachment Permit, USACOE 404 Permit. If your project isn't listed, confirm with Cochise County Development Services Department — Building Safety Division at 520-432-9300 before starting work.

In Unincorporated Cochise County, the published Change of Use (when no other permits are required) is: $100. Additional published fees: Building Permit Fee Rate Schedule — valuation-based (graduated) — $24.00 for $1–$500 of valuation; $24.00+$3.00/$100 over $500 for $501–$2,000; $69.00+$11.00/$1,000 over $2,000 for $2,001–$40,000; $487.00+$9.00/$1,000 over $40,000 for $40,001–$100,000; $1,027+$7.00/$1,000 over $100,000 for $100,001–$500,000; $3,827.00+$5.00/$1,000 over $500,000 for $500,001–$1,000,000; $6,327.00+$3.00/$1,000 over $1,000,000 for $1,000,001–$5,000,000; $18,327+$1.00/$1,000 over $5,000,000 for $5,000,001 and over; Non-Residential Plan Review Fee (includes three reviews) — 65% of the Building Permit Fee; Commercial Permit Review Fee (non-refundable, applied toward building/use permit fee) — $100; Non-Residential Uses — Accessory Structures — $100; Non-Residential Uses — All Other (0–9,999 sq ft / 10,000 sq ft and greater) — $150 / $300. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Cochise County's published plan-review target for a commercial / non-residential building permit (new construction, multi-family, tenant improvement) is 40–165 business days.

You'll need: Acknowledgment of Property Ownership or Agent Authorization (PDF); Commercial Contractor Identification Attachment (PDF); Commercial Site Plan. Depending on your project, Unincorporated Cochise County may also ask for: Hazardous Material Attachment (PDF); Commercial Lighting Plan Attachment (PDF). See the required-documents checklist on this page for details on each.

Unincorporated Cochise County requires 3 inspection(s) for a commercial / non-residential building permit (new construction, multi-family, tenant improvement), in order: Footing/Foundation, Framing / Structural, Final. Schedule each through Cochise County Development Services Department — Building Safety Division (520-432-9300).

Submit the joint permit application, ownership acknowledgment, contractor identification attachment, processing fee, and a commercial site plan online through the Cochise County Permitting Portal. Additional plans (engineering, drainage, lighting, landscape, etc.) may be required depending on project scope. Source: https://www.cochise.az.gov/812/Commercial-Non-Residential-Projects

Unincorporated Cochise County, Arizona has adopted: 2015 International Building Code (IBC), with Cochise County local amendments — current as of building-safety and FAQ pages accessed 2026-07-07; 2015 International Residential Code (IRC), with Cochise County local amendments, plus Appendix Q (Tiny Houses) of the 2018 IRC adopted separately; 2015 International Existing Building Code (IEBC); 2015 International Mechanical Code (IMC); 2015 International Fire Code (IFC); 2015 International Fuel Gas Code (IFGC); 2015 International Plumbing Code (IPC); 2015 International Swimming Pool and Spa Code (ISPSC) — inserted in place of IBC Section 3109 per local amendment; NFPA 70 National Electrical Code (NEC), 2014 Edition; Sound Attenuation Ordinance, as mandated by A.R.S. §§28-8481 and 28-8482; NOTE: Cochise County is actively developing a Building Code update (CP2045 implementation) as of mid-2026, with a Builder's Roundtable held May 28, 2026 and a Building Code Advisory and Appeals Board reviewing proposed amendments; the 2015-edition code set above remains the adopted/in-force code as of this file's lastVerified date — no new edition has been adopted yet.. Local amendments apply — see the Unincorporated Cochise County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cochise County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Cochise County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.