Unincorporated Coconino County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Coconino County, Arizona.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001-1287
- Phone
- 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851
- Office hours
- Monday-Friday, 8:00 a.m.-5:00 p.m. Director: Jay Christelman; Assistant Director: Jess McNeely. All building permit applications and document submittals for unincorporated Coconino County are made online through the Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); only PDF files are accepted for plan review submittals.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (Single-Family Dwelling, ADU, Model Home, Tiny House)
- 1
Foundation/Footing
Before concrete pour — verify footing depth, dimensions, and reinforcement per 2018 IRC
- 2
Framing
After framing, sheathing, and rough-in trades complete — before insulation or wall cover
- 3
Insulation
Insulation installed per 2018 IECC/IRC requirements before wall cover
- 4
Final
All work complete per approved plans; Certificate of Occupancy issued
Applies to: Commercial Building Permit (New Construction, Tenant Improvement, Remodel)
- 1
Footing/Foundation
Before concrete pour — per 2018 IBC
- 2
Framing / Structural
After structural framing complete, before wall cover
- 3
Final
All work complete per approved plans; Certificate of Occupancy issued
Applies to: Manufactured Home / Factory-Built Building Permit
- 1
Foundation/Set
Verify blocking, anchoring, and foundation/tie-down system per manufacturer specifications and state installation standards
- 2
Utility Connections
Electrical, plumbing, and gas connections verified
- 3
Final
Skirting, steps/decks, and all utility connections complete; unit ready for occupancy
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater and gas connections verified, no leaks
Applies to: Residential Miscellaneous Permit (Additions, Remodels, Decks, Fences, Sheds, Pools, Re-Roofing, and More)
- 1
Footing/Foundation
Before concrete pour for additions, decks, retaining walls, pools
- 2
Framing / Structural
Structural connections, framing, and any electrical/mechanical/plumbing rough-in before cover
- 3
Final
Completed work verified against approved plans
Applies to: Electrical Permit
- 1
Rough-In
Wiring and box placement before wall cover; or service equipment installed before energizing
- 2
Final
All electrical work complete and operational per 2017 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Wiring and conduit for the EV charger circuit installed before wall cover, if applicable, per 2017 NEC
- 2
Final
EVSE equipment connected and operational, breaker sizing and grounding verified
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installed and ductwork complete before wall cover or concealment
- 2
Final
Equipment operational; combustion air and venting verified per 2018 IMC/IFGC
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Coconino County building permits
Get alerts for Unincorporated Coconino County
We'll email you when Unincorporated Coconino County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.