EV Charger / EVSE Permit in Unincorporated Coconino County, Arizona

Coconino County has no dedicated EV-charger/EVSE fee line item in its Table IV Electrical fee schedule (the same schedule that itemizes wiring, service equipment, and photovoltaic systems). Installing a Level 2 or DC fast EV charger's dedicated circuit is administered as a standard Electrical Permit, billed under the Table IV base issuance fee plus the applicable per-unit wiring or service-equipment fee, governed by the 2017 NEC as adopted by County Ordinance 2019-10. Re-verified 2026-07-20: re-confirmed coconino.az.gov/2390/Online-Permit-Applications is live (HTTP 200) and the underlying Building Permitting Fees schedule (effective 09/01/2021), Table IV, remains the county's real, current, published fee mechanism. No EV-specific line item exists, but the $50.00 base electrical permit fee plus the $0.035/sq ft wiring fee (or $45.00 service-equipment fee if a service upgrade is needed) are genuine, citable, currently-applicable governing figures per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit required for the EV charger's dedicated circuit or new/upgraded service equipment — apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Governed by the 2017 NEC as adopted by Coconino County Ordinance 2019-10
  • If the installation requires a new or upgraded electrical service (panel capacity increase), it is billed under the Table IV 'Service equipment' line item rather than the general wiring fee
  • Like-for-like or minor electrical work may qualify for the county's Residential Self-Issue Permit process — confirm eligibility with the Building Division (928-679-8850) before assuming full plan review is required

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fee to issue electrical permitCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section — same base fee applied to any electrical permit, including an EV charger circuit; re-checked the live PDF on 2026-07-20 specifically for 'EV', 'electric vehicle', or 'EVSE' language — none exists anywhere in Table IV.
$50.00 base
One- and two-family residence: all wiring, fixtures, and outlets (closest matching line item for a new EVSE circuit with no service change)Table IV, Electrical section — this per-square-foot wiring fee is the closest published mechanism for a new branch circuit added to an existing residence; the county has not explicitly confirmed EV chargers are billed under this specific line.
$0.035 per sq ft of living area
Service equipment: 120/240V, 0-400 amp, single-phase (if the charger requires a new/upgraded service)Table IV, Electrical section — applies instead of the general wiring fee if the EV charger installation includes a new or upgraded electrical service panel rather than just a new branch circuit.
$45.00 each
Plan Review Fee (where full plan review is required)Coconino County Building Permitting Fees schedule, Part I, Section D.
65% of the calculated permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Coconino County building department
~36–56 business days

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Coconino County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring and conduit for the EV charger circuit installed before wall cover, if applicable, per 2017 NEC

  2. 2

    Final

    EVSE equipment connected and operational, breaker sizing and grounding verified

See the full Unincorporated Coconino County inspection guide — scheduling & re-inspection fees →

Tips

  • Coconino County has no EV-charger-specific permit or fee — apply for a standard Electrical Permit through the SmartGov portal, using the general wiring fee ($0.035/sq ft) or the service equipment fee ($45, 0-400A single-phase) depending on whether the install includes a service upgrade.
  • Ask the Building Division (928-679-8850) whether your specific EVSE installation qualifies for the faster Residential Self-Issue Permit track before assuming the full 36-56 day building/engineering permit timeline applies.
  • Re-confirmed 2026-07-20: coconino.az.gov/2390/Online-Permit-Applications is live and Table IV's $50.00 base electrical fee plus $0.035/sq ft wiring fee remain the governing figures for an EV charger circuit — no EV-specific line item exists.

Frequently asked questions

Unincorporated Coconino County requires an ev charger / evse permit for: Electrical Permit required for the EV charger's dedicated circuit or new/upgraded service equipment — apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com); Governed by the 2017 NEC as adopted by Coconino County Ordinance 2019-10; If the installation requires a new or upgraded electrical service (panel capacity increase), it is billed under the Table IV 'Service equipment' line item rather than the general wiring fee; Like-for-like or minor electrical work may qualify for the county's Residential Self-Issue Permit process — confirm eligibility with the Building Division (928-679-8850) before assuming full plan review is required. If your project isn't listed, confirm with Coconino County Community Development Department, Building and Safety Division at 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851 before starting work.

In Unincorporated Coconino County, the published Fee to issue electrical permit is: $50.00 base. Additional published fees: One- and two-family residence: all wiring, fixtures, and outlets (closest matching line item for a new EVSE circuit with no service change) — $0.035 per sq ft of living area; Service equipment: 120/240V, 0-400 amp, single-phase (if the charger requires a new/upgraded service) — $45.00 each; Plan Review Fee (where full plan review is required) — 65% of the calculated permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an ev charger / evse permit in Unincorporated Coconino County typically runs 36–56 business days. This is an estimate, not a published figure — confirm current review times with Coconino County Community Development Department, Building and Safety Division at 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851.

You'll need: Online Permit Applications Portal Submission. See the required-documents checklist on this page for details on each.

Unincorporated Coconino County requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through Coconino County Community Development Department, Building and Safety Division (928-679-8850 (toll-free 800-559-9289); fax 928-679-8851).

Apply through Coconino County Community Development Department, Building and Safety Division at 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001-1287. Phone: 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851, email: plansubmittals@coconino.az.gov. Office hours: Monday-Friday, 8:00 a.m.-5:00 p.m. Director: Jay Christelman; Assistant Director: Jess McNeely. All building permit applications and document submittals for unincorporated Coconino County are made online through the Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); only PDF files are accepted for plan review submittals.. Official information: https://www.coconino.az.gov/624/Building-and-Safety.

Unincorporated Coconino County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11 for counties). Coconino County Community Development Department, Building and Safety Division, is the code enforcement agency and building official for all unincorporated areas of the county (areas outside Flagstaff, Page, Fredonia, Tusayan, and Williams, and outside the Coconino County portion of Sedona).; As of this record's verification date (July 2026), the Coconino County Building Division's current adopted codes are: 2018 International Residential Code (IRC); 2018 International Building Code (IBC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Plumbing Code (IPC); 2018 International Energy Conservation Code (IECC); 2018 International Existing Building Code (IEBC); and 2017 National Electrical Code (NEC). Adopted via County Ordinance 2019-10 ('2019-10 Coconino County Building Ordinance — adopting the 2018 Suite of Building Codes with Amendments'). Source: Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), 'Current Codes and Ordinances' section, rendered/read directly July 2026.; Every six years the Community Development Department, in partnership with the Building Safety Advisory Board (BSAB), leads a process to adopt updated codes. As of this record's date, the County has begun a public process toward adopting the 2024 ICC code suite and 2023 NEC — an open house was held March 23, 2026 at 2500 N. Fort Valley Rd. (Thomas Auditorium), and a slide deck covering the 2024 IECC, IBC, IPC, IMC, IFGC and 2023 NEC changes was presented — but as of this record's lastVerified date that update had NOT yet been formally adopted. The 2018 ICC / 2017 NEC baseline remains the current, controlling code. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Code Adoption' section.; Additional adopted county ordinances/codes beyond the base ICC/NEC suite: Potable Rainwater Collection and Distribution Systems Code (an amendment to the IRC); 2020-11 Earthen Building and Construction Ordinance (regulating quality, type of material, testing, and workmanship for earthen buildings/structures). Source: Coconino County Building Codes, Ordinances, Design Criteria page.; The Innovative Materials and Systems Pilot Program (part of the 2019-10 Ordinance) allows owner-builders to seek an exemption from standard adopted-code provisions when building with alternative methods and materials, under conditions evaluated by the Building Official — administered in coordination with the County's broader 'Building with Alternative Methods and Materials' / Alternative Methods and Materials Permit Program (ATAG certification and consultation process) run out of the Community Development Department. Source: Coconino County Building Codes, Ordinances, Design Criteria page; Coconino County Community Development page (coconino.az.gov/136/Community-Development), 'Building with Alternative Methods and Materials' section.; Manufactured homes and factory-built buildings follow a joint state/local structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues state-level installation permits, while local site/foundation/utility compliance is handled by Coconino County under a dedicated Manufactured Homes and Factory Built Building Permit fee schedule (Part III of the county's Building Permitting Fees) and a 7-business-day review ceiling under the county's own timeframes policy. Source: Coconino County Online Permit Applications page (coconino.az.gov/2390/Online-Permit-Applications), 'Manufactured Homes & Factory Built Projects' section; Coconino County Building Permitting Fees schedule, Part III.; Properties within the Sedona Fire District (including Oak Creek Canyon) are additionally subject to the 2018 Wildland and Urban Interface Codes as adopted by that fire district; fire suppression systems are required in addition to Wildland-Urban-Interface-code compliance, and the Sedona Fire Marshal conducts concurrent plan reviews with Coconino County to ensure compliance. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Within the Sedona Fire District' section.. Local amendments apply — see the Unincorporated Coconino County overview page for the full list.

No. There is no EV charger/EVSE line item in the county's Table IV Electrical fee schedule. Installing an EV charger's dedicated circuit is handled as a standard Electrical Permit, billed under the $50 base issuance fee plus the applicable per-square-foot wiring fee or service equipment fee. Source: Coconino County Building Permitting Fees schedule, https://www.coconino.az.gov/DocumentCenter/View/45541/Building-Permitting-Fees---effective-09-01-21

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.