Residential Building Permit (Single-Family Dwelling, ADU, Model Home, Tiny House) in Unincorporated Coconino County, Arizona
Required for new stick-built or modular single-family dwellings (SFD), accessory dwelling units (ADUs), lot-specific model homes, and tiny houses built under IRC Appendix Q in unincorporated Coconino County. Manufactured homes, park models, and factory-built buildings use a separate permit track. Reviewed against the 2018 IRC and County Building Code Amendments by the Community Development Department, Building and Safety Division. All applications and plan submittals are made online through the county's SmartGov permit portal.
Verified 2026-07-07 · Source
When you need this permit
- Applies to stick-built/modular SFDs, ADUs (see Coconino County Zoning Ordinance for attached/detached/deed-restricted ADU requirements), lot-specific model homes, and tiny houses under IRC Appendix Q — NOT manufactured homes, park models, or factory-built buildings, which use a different permit application
- Register and apply online through the Online Permit Applications portal (co-coconino-az.smartgovcommunity.com): My Portal > Apply Online > Building Division > select permit type
- All plan submittals must be electronic PDF, properly scaled (typically 1/4" = 1'), unlocked, and correctly rotated before upload — only PDF format is accepted
- Ten working days from submittal date to provide a complete plan set meeting minimum plan requirements, or the application is canceled and must be resubmitted
- A geotechnical (soils) report is recommended before plan submittal for new structures; may be required during inspection if not provided upfront
- Pay the applicable Plan Review Deposit (Table I) at submittal; it is credited against the total fee due at permit issuance
- Coordination with other County divisions may be required as applicable: Planning and Zoning (Conditional Use Permit, Administrative Adjustment), Environmental Quality (wastewater/septic or proof of sewer availability), and Engineering (right-of-way, grading, drainage, floodplain)
- New construction/additions/alterations of 3,000 sq ft or more require an architect's stamp (single-family dwellings excepted); other conditions (tall walls, deep fill, log construction, structural steel, long-span masonry lintels, expansive clay soils) also require an architect/engineer stamp
- HOA CC&Rs are not part of county review — applicants are solely responsible for HOA compliance and approval
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour — verify footing depth, dimensions, and reinforcement per 2018 IRC
- 2
Framing
After framing, sheathing, and rough-in trades complete — before insulation or wall cover
- 3
Insulation
Insulation installed per 2018 IECC/IRC requirements before wall cover
- 4
Final
All work complete per approved plans; Certificate of Occupancy issued
See the full Unincorporated Coconino County inspection guide — scheduling & re-inspection fees →
Tips
- The GOVERNING timeline under Community Development Substantive Policy 2025-01 (effective 4/28/25, updated 5/29/26) is 36 days total for Residential Building/Engineering permits (15 business days intake + 21 calendar days substantive review) — this supersedes the older June 2020 document's 63-day figure. However, the department's own current homepage notice states that, due to staffing and permitting volume, Building and Engineering permits are 'currently on a 6 to 8-week [42-56 day] review timeline.' This reviewTimelineDays range (36-56) reflects the formal 36-day policy target as the min and the department's own published real-world ceiling (56 days = 8 weeks) as the max — treat both figures as governing, cited numbers, not estimates.
- Register in the SmartGov online portal before applying; you will need your login for all future permit activity, including uploads, payment, and communication with your assigned permit technician.
- A new Self-Issue Residential Rooftop Grid-Tied Solar option, an At-Risk Grading self-issue permit, and a Third-Party Engineering self-issue option are all available for qualifying scopes — apply for these BEFORE submitting the underlying building permit application if you intend to use them.
- The County's new Model ADU Plans Library (partnering with the City of Flagstaff) offers a fixed base plan-review rate ($1,000-$3,000) and faster permitting for County residents building an ADU from a pre-approved model plan, versus a fully custom design.
- If your project is in a community-sewer area (e.g., Pinewood, Kachina Village), you must show proof of available sewer connection; otherwise, an onsite wastewater (septic) permit from the Environmental Quality Division is required in conjunction with your building permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Coconino County
Residential Building Permit (Single-Family Dwelling, ADU, Model Home, Tiny House) in other cities
Look up this fee in a different city →
Now live
Build your Unincorporated Coconino County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Coconino County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →